Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

... 1015152540 60 32505092 166 30454575120 6 F400 5102025507024404550185204080100200Est. final ACT/% 7182 69 49 63 93544851 76 Effic. VAL/ACT 60 62 67 7983.1 86. 2Total4300 ... chart and manhour loadingsFigure 27.8Final13,27514, 468 12,58911,01911,54811, 260 11,14111,27711,095Value342 560 1 461 2 468 31525030 66 28851310,095Act.385 68 01 561 231431184824 62 39812094771234 567 8Week ... 2506F400 0.093 80 7.4 60 0Total 4300 1.000 64 .4 4,000Overall % complete = 64 .4%.Predicted final hours 40000 .64 4= 62 11 × 100 hoursEfficiency = 4300 × 0 .64 44000= 69 .25%Cost control and...
  • 45
  • 409
  • 0
Tài liệu Project Planning and Control Part 1 pptx

Tài liệu Project Planning and Control Part 1 pptx

... 0 .69 0 0 .66 72 0.980 0. 961 0.925 0.890 0.857 0.8 26 0.797 0. 769 0.7 56 0.743 0.718 0 .69 4 0 .67 2 0 .65 0 0 .64 0 0 .63 0 0 .61 0 0.592 0.549 0.510 0.4 76 0.4443 0.971 0.942 0.889 0.840 0.794 0.751 0.712 0 .67 5 ... 0. 260 0.2 26 0.1985 0.951 0.9 06 0.822 0.747 0 .68 1 0 .62 1 0. 567 0.519 0.497 0.4 76 0.437 0.402 0.370 0.341 0.328 0.315 0.291 0. 269 0.223 0.1 86 0.1 36 0.132 6 0.942 0.888 0.790 0.705 0 .63 0 0. 564 0.507 ... 0.794 0.751 0.712 0 .67 5 0 .65 8 0 .64 1 0 .60 9 0.579 0.551 0.524 0.512 0.500 0.477 0.455 0.4 06 0. 364 0.328 0.2 96 4 0. 961 0.924 0.855 0.792 0.735 0 .68 3 0 .63 6 0.592 0.572 0.552 0.5 16 0.482 0.451 0.423 0.410...
  • 63
  • 443
  • 1
Tài liệu Project Planning and Control Part 2 pptx

Tài liệu Project Planning and Control Part 2 pptx

... cycle 6. 4 Key dates 6. 5 Milestones and milestone slip chart 6. 6 Bar chart and network if availableThe Who7 Project organization8 Project resource management9 Project team organization9.1 Project ... requirement5.3 Project security and privacy5.4 Project management philosophy5.5 Management reporting systemThe When 6 Programme management 6. 1 Programme method 6. 2 Program software 6. 3 Project life ... applied and incorporated in the organization. The output of thisstage is the audit report. 63 Project Planning and Control In all these stages resources and facilities must always be considered and arrangements...
  • 39
  • 503
  • 0
Tài liệu Project Planning and Control Part 3 pptx

Tài liệu Project Planning and Control Part 3 pptx

... 36 16 8141413192711201217211923303024Duration in days2829432732 36 34513338 36 533542 56 36 45 60 4532 Project Planning and Control 100Figure 14.5illustrated by the example given in Figure ... GgAhEgEfGhAj2191510318372 6 1 6 242472752 6 144104291210787 6 285824 64 34 365 331234000000002191510318581121119312712182311 36 16 8141413192711201217211923303024Duration ... Ah.101Figure 14 .6 Project Planning and Control Fe and Gd meet at Ge, therefore they can be ignored.String Gf–Gh meets Aj at day 45String Ef–Eg meets Ah at day 36 Therefore float is either 56 45 = 11or...
  • 46
  • 464
  • 0
Tài liệu Project Planning and Control Part 4 pdf

Tài liệu Project Planning and Control Part 4 pdf

... 4813 68 166 1015817013 160 1705 166 178 179 16 28 160 1240 6 724321277111220000000000001000 0 1120128 160 3 68 166 1015817013158171 17815 16 280128 160 3 68 166 1015817013159171 ... equipment 6 P Testing on site 4Q Hand over 1R Trial operation 7S Close out 1144ABJNCKPDLQEMRSFGH13 68 166 10 160 17013 160 17115 165 178 179 16 28 4813 68 166 1015817013 160 1705 166 178 ... should be 4 + 50% of 6 = 7.However, this presupposes that the first activityhas not been delayed and finished on week 4 asprogrammed.151 060 564 4 Project Planning and Control How, then, can...
  • 38
  • 549
  • 0
Tài liệu Project Planning and Control Part 5 ppt

Tài liệu Project Planning and Control Part 5 ppt

... days)ABCDE111111111222222222222222222333332333333333334444475333444444445555554444555 56 6 6 6 6 76 32ABCDECDEFGKKLMMLLGJHBBA5 56 67A020Critical pathFloat40A1A2A3A4A5A6B1B2B3B4B5B6C1C2C3C4D1D2D3D4E1E2E3E4E5F2F3G2G3G4G5H2J1J2J3J4J5J6K1K3L1L2L4M1M2Beg.A2A3A4A5A6A7B2B3B4B5B6B7C2C3C4C5D2D3D4D5E2E3E4E5E6F3F4G3G4G5G6H3J2J3J4J5J6J7K2K4L2L3L5M2M3End72128025722 60 253141303141303121305211111111.5.5.5.521.5.5.5.525D 60 ... a project manager to ensure that this faith exists. Where small cracks doappear in this vital bridge of understanding between the planning depart-ment and the operational departments, the project ... always be clarity and ease ofunderstanding. Complex networks only confuse clients, and reflect a lack ofappreciation of the advantages of method statements.177 Project Planning and Control Integrated...
  • 46
  • 508
  • 0
Tài liệu Project Planning and Control Part 7 pptx

Tài liệu Project Planning and Control Part 7 pptx

... 10 62 70 100 62 70 100 62 70 100 62 Erect vessel 11 11 12 100 11 12 100 11 12 100 11Erect bridge sect. A 12 62 60 100 62 60 100 62 60 100 62 Erect bridge sect. B 13 62 40 50 31 65 100 62 65 ... Actualcum.%VA 60 0 60 0 100 60 0 60 0 100 60 0 60 0 100 60 0 60 0 100 60 0B 900 800 100 900 800 100 900 800 100 900 800 100 900C 60 0 550 100 60 0 550 100 60 0 550 100 60 0 550 100 60 0D 200 220 90 180 ... APrefabsuctionPrefabsuctionLaybaseLaybasePrefabdischPrefabdischSMACNo.HydroErectsuctionErectsuctionErectdischErectdisch1034543050313252513353355512131411111111111111111111111115171822 16 20211955 6 4885 6 91091010101011111213840002 62 151312325 26 24 36 56 3959375740 60 385841 61 4111111111111112345455 6 6777455 6 67781144241111Durationin...
  • 33
  • 475
  • 0
Tài liệu Project Planning and Control Part 8 pptx

Tài liệu Project Planning and Control Part 8 pptx

... off)DaysQPONMLKJHGFEDCBA12345 6 78 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35TotalCum.mday 6 6 6 12 6 18 6 24 6 30 6 36 642 6 485535588 66 874781788 6 94 6 100 6 1 06 611281208128 6 134 6 1404144414821502152315531583 161 3 164 333333333314424242424422333322222222222222222223333333322233331Bar ... 35TotalCum.mday 6 6 6 12 6 18 6 24 6 30 6 36 642 6 489579 66 12781290797510241 06 41104114 6 120 6 1 26 613241 36 41404144414821502152315531583 161 3 164 333333333314444444223333222222222222222222233333333222222233331Bar ... 32M 8 6 80 6 8 100 8 8 100 8N 8 6 80 6 8 100 8 8 100 8O 160 158 90 144 166 100 160 P64 80 100 64 Q32 24 60 19R 96 52 40 38Total 1312 380 3 46 838 738 1220 1104 1384 1241% complete 26. 3 56. 2...
  • 50
  • 435
  • 0
Tài liệu Project Planning and Control 4E doc

Tài liệu Project Planning and Control 4E doc

... configurationmanagement and quality management.2 Hard skills such as project organization, project evaluation, project planning, cost control, monitoring, risk management and changemanagement. Project Planning and ... 12 .6 000112 16 3 6 13 261 111112027040152187 6 17 261 12412212703 6 2538541102950START ADGMKB50% = 4EHNLCFJFINISH03 6 13 269 1111172721132025270074 60 174 260 1122110110214270210 261 3211 261 270ActivityDurationEarlystart(ES)Earlyfinish(EF)Latestart(LS)Latefinish(LF)CriticalCriticalCritical ... beendevoted to each technique (Chapters 15, 16 and 17).78Figure 11.25Figure 11. 26 F–SBuyland2Clearland23DelayDependencyS–SF–FS–FDigtrench 6 Strip 6 SkipdelivLaycable4Paint7FillAfter...
  • 406
  • 1,702
  • 0
Project Planning and Control Part 9

Project Planning and Control Part 9

... projectsvary enormously in scope, size and complexity. Project Planning and Control The sequences and techniques given may therefore have to be changed to suitany particular project. Indeed certain techniques ... (budget, planned, actual, value, anticipated final)357 Project Planning and Control 340Figure 31.1Figure 31.2 Project Planning and Control Table 32.1 ContinuedDraw time/% curves (% planned, ... TerminationCS2(CSCS) Cost & Schedule Control System 361 Project Planning and Control EMAC Engineering Manhours And CostFLAC Four Letter AcronymHASAWA Health And Safety At Work ActNAPNOC No Agreed...
  • 24
  • 352
  • 0

Xem thêm

Từ khóa: tài liệu về switching and amplifyingkaplan toefl paper and pencil part 6tài liệu ôn thi tuyển sinh toán 6tài liệu học môn vật lý lớp 6tài liệu ôn học sinh giỏi toán 6tài liệu ôn học sinh giỏi văn 6tài liệu ôn tập thi vào lớp 6tài liệu bồi dưỡng tiếng anh lớp 6tài liệu ôn tập môn toán lớp 6tai lieu ngu phap tieng anh lop 6tai lieu cac bai van mau lop 6tài liệu bồi dưỡng hình học lớp 6tài liệu bài tập tiếng anh lớp 6 unit 4tài liệu project 2003tài liệu project 2007Nghiên cứu tổ hợp chất chỉ điểm sinh học vWF, VCAM 1, MCP 1, d dimer trong chẩn đoán và tiên lượng nhồi máu não cấpNghiên cứu tổ chức chạy tàu hàng cố định theo thời gian trên đường sắt việt namGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitNGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWAN SLIDEQuản lý hoạt động học tập của học sinh theo hướng phát triển kỹ năng học tập hợp tác tại các trường phổ thông dân tộc bán trú huyện ba chẽ, tỉnh quảng ninhTrả hồ sơ điều tra bổ sung đối với các tội xâm phạm sở hữu có tính chất chiếm đoạt theo pháp luật Tố tụng hình sự Việt Nam từ thực tiễn thành phố Hồ Chí Minh (Luận văn thạc sĩ)Phát hiện xâm nhập dựa trên thuật toán k meansTìm hiểu công cụ đánh giá hệ thống đảm bảo an toàn hệ thống thông tinThơ nôm tứ tuyệt trào phúng hồ xuân hươngTổ chức và hoạt động của Phòng Tư pháp từ thực tiễn tỉnh Phú Thọ (Luận văn thạc sĩ)Quản lý nợ xấu tại Agribank chi nhánh huyện Phù Yên, tỉnh Sơn La (Luận văn thạc sĩ)BT Tieng anh 6 UNIT 2Tranh tụng tại phiên tòa hình sự sơ thẩm theo pháp luật tố tụng hình sự Việt Nam từ thực tiễn xét xử của các Tòa án quân sự Quân khu (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtBÀI HOÀN CHỈNH TỔNG QUAN VỀ MẠNG XÃ HỘIChiến lược marketing tại ngân hàng Agribank chi nhánh Sài Gòn từ 2013-2015HIỆU QUẢ CỦA MÔ HÌNH XỬ LÝ BÙN HOẠT TÍNH BẰNG KIỀMMÔN TRUYỀN THÔNG MARKETING TÍCH HỢPTÁI CHẾ NHỰA VÀ QUẢN LÝ CHẤT THẢI Ở HOA KỲ