... stage should be 4 + 50% of 6 = 7.However, this presupposes that the first activityhas not been delayed and finished on week 4 asprogrammed.1510605 64 4 Project Planning and Control How, then, ... programswere, therefore, limited by the storage and processing capacity of the computer as well asthe input and output facilities. Project Planning and Control In practice, this means that the start ... the actual durations of some of the activities. This means more 143 Figure 18.8Figure 18.9 Project Planning and Control resources and hence more money. However, the rich uncle cannot be put off,so...
  • 38
  • 549
  • 0
Tài liệu Project Planning and Control Part 1 pptx

Tài liệu Project Planning and Control Part 1 pptx

... 0. 743 0.718 0.6 94 0.672 0.650 0. 640 0.630 0.610 0.592 0. 549 0.510 0 .47 6 0 .44 43 0.971 0. 942 0.889 0. 840 0.7 94 0.751 0.712 0.675 0.658 0. 641 0.609 0.579 0.551 0.5 24 0.512 0.500 0 .47 7 0 .45 5 0 .40 6 ... 0.9 14 0.837 0.703 0.592 0.500 0 .42 4 0.361 0.308 0.2 84 0.263 0.225 0.1 94 0.167 0. 144 0.1 34 0.125 0.108 0.0 94 0.067 0. 048 0.035 0.02610 0.905 0.820 0.676 0.558 0 .46 3 0.386 0.322 0.270 0. 247 0.227 ... 0.583 0.513 0 .45 2 0 .40 0 0.376 0.3 54 0.3 14 0.279 0. 249 0.222 0.210 0.198 0.178 0.159 0.122 0.095 0.0 74 0.0598 0.923 0.853 0.731 0.627 0. 540 0 .46 7 0 .40 4 0.351 0.327 0.305 0.266 0.233 0.2 04 0.179 0.168...
  • 63
  • 443
  • 1
Tài liệu Project Planning and Control Part 2 pptx

Tài liệu Project Planning and Control Part 2 pptx

... distribution and amendment record3 Introduction3.1 Project diary3.2 Project historyThe Why 4 Project aims and objectives 4. 1 Business caseThe What5 General description5.1 Scope5.2 Project ... following systems shown in Figure11. 14 can be used.71Figure 11.13Figure 11. 14 Project Planning and Control RandomThis method, as the name implies, follows no pattern and merely requires eachnode ... and thus does not affect the logic or overall time ofthe project. It can be seen that activity A still starts at 1 and takes 7 units67Figure 11.2Figure 11.3Figure 11 .4 Project Planning and...
  • 39
  • 503
  • 0
Tài liệu Project Planning and Control Part 3 pptx

Tài liệu Project Planning and Control Part 3 pptx

... 36168 14 14 131927112012172119233030 24 Duration in days2829 43 273236 34 513338365335 42 5636 45 60 45 32 Project Planning and Control 100Figure 14. 5illustrated by the example given in Figure 14. 5. For simplicity, ... GgAhEgEfGhAj21915103183726162 4 2 4 7275261 4 410 4 291210787628582 4 64 34 36533123 4 000000002191510318581121119312712182311 36168 14 14 131927112012172119233030 24 Duration ... Ah.101Figure 14. 6 Project Planning and Control Fe and Gd meet at Ge, therefore they can be ignored.String Gf–Gh meets Aj at day 45 String Ef–Eg meets Ah at day 36Therefore float is either 56 45 = 11or...
  • 46
  • 464
  • 0
Tài liệu Project Planning and Control Part 5 ppt

Tài liệu Project Planning and Control Part 5 ppt

... days)ABCDE11111111122222222222222222233333233333333333 4 4 4 4 4 75333 4 4 4 4 4 4 4 4555555 4 4 4 45555666667632ABCDECDEFGKKLMMLLGJHBBA55667A020Critical pathFloat 40 A1A2A3A4A5A6B1B2B3B4B5B6C1C2C3C4D1D2D3D4E1E2E3E4E5F2F3G2G3G4G5H2J1J2J3J4J5J6K1K3L1L2L4M1M2Beg.A2A3A4A5A6A7B2B3B4B5B6B7C2C3C4C5D2D3D4D5E2E3E4E5E6F3F4G3G4G5G6H3J2J3J4J5J6J7K2K4L2L3L5M2M3End7212802572260253 14 1303 14 1303121305211111111.5.5.5.521.5.5.5.525D60 ... pathFloat 40 A1A2A3A4A5A6B1B2B3B4B5B6C1C2C3C4D1D2D3D4E1E2E3E4E5F2F3G2G3G4G5H2J1J2J3J4J5J6K1K3L1L2L4M1M2Beg.A2A3A4A5A6A7B2B3B4B5B6B7C2C3C4C5D2D3D4D5E2E3E4E5E6F3F4G3G4G5G6H3J2J3J4J5J6J7K2K4L2L3L5M2M3End7212802572260253 14 1303 14 1303121305211111111.5.5.5.521.5.5.5.525D60 ... initial demand.187110590 48 48 48 121125126.530 4 30181818120120 54 98 48 1 24. 51 24. 51262832817171711998 54 1 24 1 24 39257A27B3C3D3E117F97G53H123J39K18.5L20M010000122181818ManufactureDoDeliveryDeliveryInspectionAssemblyPaintInvoiceEvaluateDoDoDoDoDrillbodyBalanceStampTest...
  • 46
  • 508
  • 0
Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

... 70 4. 9 2506F 40 0 0.093 80 7 .4 600Total 43 00 1.000 64. 4 4, 000Overall % complete = 64. 4%.Predicted final hours 40 000. 644 = 6211 × 100 hoursEfficiency = 43 00 × 0. 644 40 00= 69.25%Cost control ... 4. 47.812.219 .4 30.750316 542 780105715891903355258351320950 42 5250395212261 49 861001001001 140 1 140 1 140 80010001000100050801005858101020320 40 0 640 800608090 41 05901 045 210360 48 0 540 40 7080 545 9 14 1082360 48 0 840 9607085952623 04 3351802102552858080902962963222803203203605028 49 32 49 5585.587.287 64. 482.291.7 249 33238 40 54 4 544 2150277035353 945 7000Figure ... 00515203000501952800060180 240 5E300 10151525 40 603250509216630 45 45 751206F 40 0 51020255070 24 40 45 5018520 40 80100200Est. final ACT/% 71826 949 6393 544 85176Effic. VAL/ACT...
  • 45
  • 409
  • 0
Tài liệu Project Planning and Control Part 7 pptx

Tài liệu Project Planning and Control Part 7 pptx

... supports No 3 1 .44 4. 32 8. 64 38 4 58 4 1 16" Suction 2 butts bend * No 2 2 .41 4. 82 9. 64 34. 1 6 54. 1 6 1 16" Suction slip-on * No 1 1 .44 1 .44 2.88 34. 2 – 54. 2 – – – 4& quot; Disch. erect ... 70 4 7 100 6 7 100 6Weld discharge pipe 1 40 4 – – – 4 100 4 4 100 4 Support discharge pipe 1 41 4 – – – 2 50 2 3 100 4 Basic plate pump 2 50 4 3 100 4 3 100 4 3 100 4 Fit pump 2 51 14 14 100 ... 100 4 5 100 4 Support discharge pipe 2 61 4 – – – 3 70 3 4 100 4 Align couplings 1 & 2 62 50 – – – – – – 16 40 20Totals 530 3 24 56% 297 48 2 84% 44 8 525 94% 500 Project Planning and Control 2807...
  • 33
  • 475
  • 0
Tài liệu Project Planning and Control Part 8 pptx

Tài liệu Project Planning and Control Part 8 pptx

... 35TotalCum.mday666126186 24 6306366 42 6 48 957966127812907975102 4 106 4 110 4 1 14 612061266132 4 136 4 140 4 144 4 148 2150215231553158316131 64 33333333331 44 444 44 223333222222222222222222233333333222222233331Bar ... 35TotalCum.mday666126186 24 6306366 42 6 48 5535588668 74 7817886 94 6100610661128120812861 34 6 140 4 144 4 148 2150215231553158316131 64 33333333331 44 2 4 2 4 2 4 2 44 22333322222222222222222223333333322233331Bar ... 100 80 90 100 80G 48 54 100 48 60 100 48 60 100 48 H 64 60 80 51 68 100 64 68 100 64 J 16 16 100 16 16 100 16K 48 52 100 48 52 100 48 52 100 48 L 32 40 100 32 40 100 32 40 100 32M 8 6 80 6...
  • 50
  • 435
  • 0
Tài liệu Project Planning and Control 4E doc

Tài liệu Project Planning and Control 4E doc

... configurationmanagement and quality management.2 Hard skills such as project organization, project evaluation, project planning, cost control, monitoring, risk management and changemanagement. Project Planning and ... were‘Cast Column, 4 days’ and ‘Cast Beam, 2 days’ and it were necessary to insert ‘Strike Formwork,2 days’ between the two activities, the plannerFigure 13.1 Project Planning and Control would ... 12.6000112163613261111112027 04 01521876172611 24 12212703625385 4 1102950START ADGMKB50% = 4 EHNLCFJFINISH0361326911111727211320252700 74 601 74 26011221101102 14 2702102613211261270ActivityDurationEarlystart(ES)Earlyfinish(EF)Latestart(LS)Latefinish(LF)CriticalCriticalCritical...
  • 406
  • 1,702
  • 0
Project Planning and Control Part 9

Project Planning and Control Part 9

... Task Summary table 348 MS Project 98 349 Figure 31.10Figure 31.11 Project Planning and Control which shows the status of the project can be obtained from View – Table –Summary and is shown in Figure ... (budget, planned, actual, value, anticipated final)357 Project Planning and Control 340 Figure 31.1Figure 31.2 Project Planning and Control Table 32.1 ContinuedDraw time/% curves (% planned, ... projectsvary enormously in scope, size and complexity. Project Planning and Control The sequences and techniques given may therefore have to be changed to suitany particular project. Indeed certain techniques...
  • 24
  • 352
  • 0

Xem thêm

Từ khóa: tài liệu developing writting skills 2 part 11 pdftai lieu giai family and friend 4tài liệu về switching and amplifyingtài liệu thi học kì 1 toán 4kaplan toefl paper and pencil part 4tài liệu luyện thi toán violympic lớp 4tài liệu bồi dưỡng hsg toán lớp 4tai lieu boi duong hoc sinh lop 4tài liệu môn tấm và vỏ chương 4tai lieu trung thu doc lap lop 4tai lieu on tap tieng viet lop 4tài liệu đề violympic lop 7 vong 4tài liệu công nghệ kéo sợi pp 4 pptxtài liệu project 2003tài liệu project 2007Nghiên cứu sự biến đổi một số cytokin ở bệnh nhân xơ cứng bì hệ thốngBáo cáo quy trình mua hàng CT CP Công Nghệ NPVNghiên cứu sự hình thành lớp bảo vệ và khả năng chống ăn mòn của thép bền thời tiết trong điều kiện khí hậu nhiệt đới việt namNghiên cứu tổ chức pha chế, đánh giá chất lượng thuốc tiêm truyền trong điều kiện dã ngoạiMột số giải pháp nâng cao chất lượng streaming thích ứng video trên nền giao thức HTTPGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitNghiên cứu, xây dựng phần mềm smartscan và ứng dụng trong bảo vệ mạng máy tính chuyên dùngThơ nôm tứ tuyệt trào phúng hồ xuân hươngSở hữu ruộng đất và kinh tế nông nghiệp châu ôn (lạng sơn) nửa đầu thế kỷ XIXChuong 2 nhận dạng rui roTổ chức và hoạt động của Phòng Tư pháp từ thực tiễn tỉnh Phú Thọ (Luận văn thạc sĩ)BT Tieng anh 6 UNIT 2Tăng trưởng tín dụng hộ sản xuất nông nghiệp tại Ngân hàng Nông nghiệp và Phát triển nông thôn Việt Nam chi nhánh tỉnh Bắc Giang (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtTrách nhiệm của người sử dụng lao động đối với lao động nữ theo pháp luật lao động Việt Nam từ thực tiễn các khu công nghiệp tại thành phố Hồ Chí Minh (Luận văn thạc sĩ)Đổi mới quản lý tài chính trong hoạt động khoa học xã hội trường hợp viện hàn lâm khoa học xã hội việt namHIỆU QUẢ CỦA MÔ HÌNH XỬ LÝ BÙN HOẠT TÍNH BẰNG KIỀMTÁI CHẾ NHỰA VÀ QUẢN LÝ CHẤT THẢI Ở HOA KỲ