... clamp areas, and all the connectors were tightened regularly 202 Nuclear Power – Deployment, Operation and Sustainability Overall, the TAN-6 07 SFP project was highly successful and reduced personnel ... (HWMA)/RCRA Partial Permit, EBR-II, EPA ID No ID489000892, effective December 10, 2002 (Part B) 212 Nuclear Power - Deployment, Operation and Sustainability In response to this regulatory driver, and ... contamination in the reactor structural materials, and Na-22, and Cs-1 37, which are present in the residual sodium 220 Nuclear Power - Deployment, Operation and Sustainability In-situ treatment methods...