Tài liệu Project Planning and Control Part 8 pptx

Tài liệu Project Planning and Control Part 8 pptx

Tài liệu Project Planning and Control Part 8 pptx

... 32M 8 6 80 6 8 100 8 8 100 8 N 8 6 80 6 8 100 8 8 100 8 O 160 1 58 90 144 166 100 160P64 80 100 64Q32 24 60 19R96 52 40 38 Total 1312 380 346 83 8 7 38 1220 1104 1 384 1241% complete 26.3 56.2 84 .1 ... 192 200 100 192F 80 70 80 64 90 100 80 90 100 80 G 48 54 100 48 60 100 48 60 100 48 H 64 60 80 51 68 100 64 68 100 64J 16 16 100 16 16 100 16K 48 52 100 48 52 100 48 52 100 48 L 32 40 100 32 ... 384 88 0 1 184 1312Efficiency (CPI) % 91 88 90 90Est. final manhours 1442 1491 14 58 14 58 SPI (cost) 0.90 0 .84 0.93 0.96SPI (time) 0.90 0 .86 0.92 0 .89 Est. completion day 33 36 32 31 Project Planning...
  • 50
  • 435
  • 0
Tài liệu Project Planning and Control Part 1 pptx

Tài liệu Project Planning and Control Part 1 pptx

... 2% 4% 6% 8% 10% 12% 14% 15% 16% 18% 20% 22% 24% 25% 26% 28% 30% 35% 40% 45% 50%1 0.990 0. 980 0.962 0.943 0.926 0.909 0 .89 5 0 .87 7 0 .87 0 0 .86 2 0 .84 7 0 .83 3 0 .82 0 0 .80 6 0 .80 0 0.794 0. 781 0.769 0.741 ... 0. 086 0.079 0.066 0.056 0.037 0.025 0.017 0.01212 0 .88 7 0. 788 0.625 0.497 0.397 0.319 0.257 0.2 08 0. 187 0.1 68 0.137 0.112 0.092 0.076 0.069 0.062 0.052 0.043 0.027 0.0 18 0.012 0.0 08 13 0 .87 9 ... 0.3 28 0.315 0.291 0.269 0.223 0. 186 0.136 0.1326 0.942 0 .88 8 0.790 0.705 0.630 0.564 0.507 0.456 0.432 0.410 0.370 0.335 0.303 0.275 0.262 0.250 0.227 0.207 0.165 0.133 0.1 08 0. 088 7 0.933 0 .87 1...
  • 63
  • 443
  • 1
Tài liệu Project Planning and Control Part 2 pptx

Tài liệu Project Planning and Control Part 2 pptx

... shown in Figure 8. 4 from 1 for very low to 5 for very high. Bymultiplying the appropriate numbers in the boxes, a numerical (or quantita-51Figure 8. 2Figure 8. 3 Project Planning and Control tive) ... applied and incorporated in the organization. The output of thisstage is the audit report.63 Project Planning and Control In all these stages resources and facilities must always be considered and arrangements ... monitored and controlled.To this end a Configuration Control Committee is appointed to head up specialInterface Control Groups and Configuration Control Boards which inves-tigate and, where...
  • 39
  • 503
  • 0
Tài liệu Project Planning and Control Part 3 pptx

Tài liệu Project Planning and Control Part 3 pptx

... GgAhEgEfGhAj219151031 8 37261624247275261441042912107 8 762 8 5 82 4643436533123400000000219151031 8 5 8 1121119312712 18 2311 3616 8 141413192711201217211923303024Duration ... a109 Project Planning and Control Analysis and float calculation (see Chapter 15) is identical to the methodsemployed for arrow diagrams and, if the box is large enough, the earliest and latest ... 3616 8 141413192711201217211923303024Duration in days 28 2943273236345133 38 36533542563645604532 Project Planning and Control 100Figure 14.5illustrated by the example given...
  • 46
  • 464
  • 0
Tài liệu Project Planning and Control Part 7 pptx

Tài liệu Project Planning and Control Part 7 pptx

... smoothing)1501234567 8 910111213141516MenMen67 8 910 11 12131514105xWeldersWelders 8 10 10 10121210 8 844422 8 18 28 38 5062 72 80 88 92 98 100 102 104 106222222244222Figure ... 25092x5=460106x5=5307 89 1011121314Act012222222222222222222222222222222222222222222xxxxxxxxxxxxx22222222222345DaysBar chart (after resource smoothing)67 89 10 11 12 13 14Cum menCum men 8 10 10 10121210 8 84442210 18 28 38 5062 72 80 88 92 98 100 102 104 10622222224422201234515Histogram ... 297 482 84 % 4 48 525 94% 500 Project Planning and Control 280 7 Enter these durations in the network programme. 8 Carry out the network analysis, giving floats and the critical path (Table 28. 9).9...
  • 33
  • 475
  • 0
Tài liệu Project Planning and Control Part 4 pdf

Tài liệu Project Planning and Control Part 4 pdf

... 16012406724321277111220000000000001000 0 11201 28 1603 68 166101 58 170131 58 171 1 78 15 16 28 01 28 1603 68 166101 58 17013159171 1 78 15 16140R1 78 1 78 70171171DurationEarlystartEarlyfinishActivityLatestartLatefinishKeyFloatSimple ... 4Q Hand over 1R Trial operation 7S Close out 1144ABJNCKPDLQEMRSFGH13 68 1661016017013160171151651 78 17916 28 48 13 68 166101 58 1701316017051661 78 17916 28 16012406724321277111220000000000001000 ... actual durations of some of the activities. This means more143Figure 18. 8Figure 18. 9 Project Planning and Control resources and hence more money. However, the rich uncle cannot be put off,so...
  • 38
  • 549
  • 0
Tài liệu Project Planning and Control Part 5 ppt

Tài liệu Project Planning and Control Part 5 ppt

... demand. 187 110590 48 48 48 121125126.530430 18 18 18 12012054 98 48 124.5124.5126 28 3 28 171717119 98 5412412439257A27B3C3D3E117F97G53H123J39K 18. 5L20M010000122 18 18 18 ManufactureDoDeliveryDeliveryInspectionAssemblyPaintInvoiceEvaluateDoDoDoDoDrillbodyBalanceStampTest ... a project manager to ensure that this faith exists. Where small cracks doappear in this vital bridge of understanding between the planning depart-ment and the operational departments, the project ... always be clarity and ease ofunderstanding. Complex networks only confuse clients, and reflect a lack ofappreciation of the advantages of method statements.177 Project Planning and Control Integrated...
  • 46
  • 508
  • 0
Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

... 4.47 .8 12.219.430.750316542 780 10571 589 190335525 83 513209504252503952122614 986 100100100114011401140 80 010001000100050 80 100 585 81 01020320400640 80 060 80 904105901045210360 480 5404070 80 5459141 082 360 480 84 096070 85 95262304335 180 210255 285 80 80 90296296322 280 32032036050 28 49324955 85 .5 87 .2 87 64.4 82 .291.7249332 38 4054454421502770353539457000Figure ... galleriesBLRECONDUCTVESSLGALLSDUCT111111240.00110.00 180 .00100.00 85 0.00250.00240.00240.00110.00110.00 180 .00 180 .00100.00100.00 85 0.00 85 0.00250.00250.000.0055.000.0052.000.00257.000.001 28. 000.00651.000.00169.00240110 180 100 85 0245000003555552522572571 28 1 28 6516511721720 185 0 58 0–770– 28 01990 78 100100100100 85 0 98 Figure 27.11 Project Planning and Control beginning ... chart and manhour loadingsFigure 27 .8 Final13,27514,4 68 12, 589 11,01911,5 48 11,26011,14111,27711,095Value342560146124 68 3152503066 28 851310,095Act. 385 680 1561231431 18 482 46239 81 209477123456 78 Week...
  • 45
  • 409
  • 0
Tài liệu Project Planning and Control 4E doc

Tài liệu Project Planning and Control 4E doc

... configurationmanagement and quality management.2 Hard skills such as project organization, project evaluation, project planning, cost control, monitoring, risk management and changemanagement. Project Planning and ... 4EHNLCFJFINISH0361326911111727211320252700746017426011221101102142702102613211261270ActivityDurationEarlystart(ES)Earlyfinish(EF)Latestart(LS)Latefinish(LF)CriticalCriticalCritical path2 lag Project Planning and Control 86 Figure 12.7Figure 12 .8 An example of such a diagram is shown in Figure 12 .8. Care must be takennot to cross the nodes with the links and to insert ... the more conventionalFinish to Start mode as shown in Figure 11. 28 79Figure 11.27 Project Planning and Control 80 Figure 11. 28 12Precedence or activity onnode (AoN) diagramsSome planners...
  • 406
  • 1,702
  • 0
Project Planning and Control Part 9

Project Planning and Control Part 9

... Task Summary table3 48 MS Project 98 349Figure 31.10Figure 31.11 Project Planning and Control which shows the status of the project can be obtained from View – Table –Summary and is shown in Figure ... projectsvary enormously in scope, size and complexity. Project Planning and Control The sequences and techniques given may therefore have to be changed to suitany particular project. Indeed certain techniques ... (budget, planned, actual, value, anticipated final)357 Project Planning and Control 340Figure 31.1Figure 31.2 Project Planning and Control Table 32.1 ContinuedDraw time/% curves (% planned,...
  • 24
  • 352
  • 0

Xem thêm

Từ khóa: tài liệu tham khảo tiếng anh lớp 8tài liệu về switching and amplifyingtài liệu ôn tập tiếng anh lớp 8kaplan toefl paper and pencil part 8tài liệu ôn thi học kì hóa 8tài liệu học lập trình windows phone 8Báo cáo thực tập tại nhà thuốc tại Thành phố Hồ Chí Minh năm 2018chuyên đề điện xoay chiều theo dạngNghiên cứu sự hình thành lớp bảo vệ và khả năng chống ăn mòn của thép bền thời tiết trong điều kiện khí hậu nhiệt đới việt namMột số giải pháp nâng cao chất lượng streaming thích ứng video trên nền giao thức HTTPGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitPhối hợp giữa phòng văn hóa và thông tin với phòng giáo dục và đào tạo trong việc tuyên truyền, giáo dục, vận động xây dựng nông thôn mới huyện thanh thủy, tỉnh phú thọPhát triển mạng lưới kinh doanh nước sạch tại công ty TNHH một thành viên kinh doanh nước sạch quảng ninhPhát triển du lịch bền vững trên cơ sở bảo vệ môi trường tự nhiên vịnh hạ longPhát hiện xâm nhập dựa trên thuật toán k meansNghiên cứu khả năng đo năng lượng điện bằng hệ thu thập dữ liệu 16 kênh DEWE 5000Tổ chức và hoạt động của Phòng Tư pháp từ thực tiễn tỉnh Phú Thọ (Luận văn thạc sĩ)BT Tieng anh 6 UNIT 2Giáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtGiáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtTrách nhiệm của người sử dụng lao động đối với lao động nữ theo pháp luật lao động Việt Nam từ thực tiễn các khu công nghiệp tại thành phố Hồ Chí Minh (Luận văn thạc sĩ)BÀI HOÀN CHỈNH TỔNG QUAN VỀ MẠNG XÃ HỘIChiến lược marketing tại ngân hàng Agribank chi nhánh Sài Gòn từ 2013-2015HIỆU QUẢ CỦA MÔ HÌNH XỬ LÝ BÙN HOẠT TÍNH BẰNG KIỀMTÁI CHẾ NHỰA VÀ QUẢN LÝ CHẤT THẢI Ở HOA KỲ