Working method (mechanical work)

213 125 0
Working method (mechanical work)

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

FUJITA CORPORATION PROJECT: KYOCERA DOCUMENT TECHNOLOGY VIETNAM FACTORY FUTURE PLAN FUJITA CORPORATION VSIP IZ - HAI PHONG - VIETNAM FUJITA WORKING METHOD (MECHANICAL WORK) INSERT & ANCHOR WORKING PLAN SLEEVE WORKING PLAN GI PIPE WORKING PLAN PPR PIPE WORKING PLAN HDPE PIPE WORKING PLAN PVC PIPE WORKING PLAN COPPER PIPE WORKING PLAN PENETRATION WORKING PLAN DUCTING WORKING PLAN 10 INSULATION WORKING PLAN 11 HANGING WORKING PLAN 12 EQUIPMENT WORKING PLAN 13 SUPPORT & SLEEVE ON PC SLAB WORKING PLAN HAI PHONG, 2018 FUJITA CORPORATION PROJECT: KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY VSIP IZ - HAI PHONG - VIETNAM WORKING METHOD (MECHANICAL WORK) INSERT & ANCHOR WORKING PLAN HAI PHONG, 2018 FUJITA CORPORATION Form: Project: KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY Valid date: Location: LOT 56A, 56B, 56C - VSIP HAI PHONG Page of CHECK SHEET FOR ANCHOR BOLT WORK Description: ……………………………………………………………………… Location/Area: ……………………………… Grid line: ……………………………… Date of inspection: ……………………………… Time: ….:… Ref.No: ……………………………… Refrred drawing: ……………………………… Attached to: ……………………………… No Inspection Items Anchor bolt Material Size Quantity Length Setting position Fix method Color Damage Protection Result Judgement standard OK NG OK NG OK NG OK N NG OK NG OK NG OK NG OK NG OK NG Correct material ± 0.5mm Visual check ± 2mm ± 2mm Correct method Visual check Visual check Visual check Specification Follow approval catalog Follow approval catalog Follow drawing Follow working method Notes: Method & setting location should be insue by Kinden engineer Status Approved FUJITA's COMMENT Approved with comment Rejected Comment: KINDEN VIET NAM CO.,LTD Prepared by: Confirmed by: Signature:………………… Name:…………… …… Date:……………………… File: Issue No: Checked by: Signature:…………… Name:…………… … Date:………………… FUJITA Approved by: Signature:………………… Signature:………………… Name:…………… ……… Name:…………… ……… Date:……………………… Date:……………………… Distribution: Revision: Date: / / By worker Nut & Washer Marking red color By engineer Marking red color Step-1 2.Step -2 Cleaning hole 3.Step -3 Insert Drop - in anchor 4.Step -4 Use hammer to expand Anchor leg Marking & drilling hole 5.Step -5 Install thread rod, bolt Fix with nut & washer Thread rod By worker 6.Step -6 Marking by permanent maker Thread rod DROP IN ANCHOR LIST L d No d D L Drill Bit mm Depth of Drill M10 12 40 12 40 M12 16 50 16 50 D MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: DETAIL INSTALL PIPING BY ANCHOR APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: FUJITA CORPORATION PROJECT: KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY VSIP IZ - HAI PHONG - VIETNAM WORKING METHOD (MECHANICAL WORK) SLEEVE WORKING PLAN HAI PHONG, 2018 FUJITA CORPORATION Project: KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY Location: LOT 56A, 56B, 56C - VSIP HAI PHONG Form: Valid date: Page of CHECK SHEET FOR SLEEVE WORK Description: ……………………………………………………………………… Location/Area: ……………………………… Grid line: ……………………………… Date of inspection: ……………………………… Time: ….:… Ref.No: ……………………………… Refrred drawing: ……………………………… No Attached to: ……………………………… Inspection Items Sleeve material Material Size Quantity Length Setting position Reinforcing work Protection Cleaning Result Judgement standard OK NG OK NG NG N NG OK OK OK NG NG NG OK NG OK OK Specification Correct material ± 1mm Visual check ± 10mm ± 5mm Correct material, size, q'ty Visual check Visual check Follow approval catalog Follow approval catalog Follow drawing Follow civil standard Notes: Method & setting location should be insue by Kinden engineer Reinforced steel material shuold be same with structure work Marking location of sleeve on surface of formwork, careful check reinforced rebar with engineer Status Approved Comment: FUJITA's COMMENT Approved with comment KINDEN VIET NAM CO.,LTD Prepared by: Confirmed by: Rejected FUJITA Checked by: Approved by: Signature:………………… Signature:…………… Signature:………………… Signature:………………… Name:…………… …… Name:…………… … Name:…………… ……… Name:…………… ……… Date:……………………… Date:………………… Date:……………………… Date:……………………… File: Issue No: Distribution: Revision: Date: / / MECHANICAL-INSTALLATION DRAWING KINDEN VIETNAM CO., LTD-HEAD OFFICE 15 Floor, CMC building, Duy Tan Street, Dich Vong Ward, Cau Giay Distric, Ha Noi capital, ITEMS DATE SCALE(A4) DRAWING No MECHANICAL-INSTALLATION DRAWING KINDEN VIETNAM CO., LTD-HEAD OFFICE 15 Floor, CMC building, Duy Tan Street, Dich Vong Ward, Cau Giay Distric, Ha Noi capital, ITEMS DATE SCALE(A4) DRAWING No MECHANICAL-INSTALLATION DRAWING KINDEN VIETNAM CO., LTD-HEAD OFFICE 15 Floor, CMC building, Duy Tan Street, Dich Vong Ward, Cau Giay Distric, Ha Noi capital, ITEMS DATE SCALE(A4) DRAWING No MECHANICAL-INSTALLATION DRAWING KINDEN VIETNAM CO., LTD-HEAD OFFICE 15 Floor, CMC building, Duy Tan Street, Dich Vong Ward, Cau Giay Distric, Ha Noi capital, ITEMS DATE SCALE(A4) DRAWING No MECHANICAL-INSTALLATION DRAWING KINDEN VIETNAM CO., LTD-HEAD OFFICE 15 Floor, CMC building, Duy Tan Street, Dich Vong Ward, Cau Giay Distric, Ha Noi capital, ITEMS DATE SCALE(A4) DRAWING No MECHANICAL-INSTALLATION DRAWING KINDEN VIETNAM CO., LTD-HEAD OFFICE 15 Floor, CMC building, Duy Tan Street, Dich Vong Ward, Cau Giay Distric, Ha Noi capital, ITEMS DATE SCALE(A4) DRAWING No AHU/OAHU INSTALLATION (ELEVATION VIEW) DETAIL-1 AHU/OAHU ANGLE STEEL V63X63X6 MARKING RED/BLUE AHU/OAHU DOUBLE NUT M14 FOUNDATION FIX SUPPORT SEE DETAIL-1 FOUNDATION (BY CIVIL) DETAIL-2 AHU/OAHU INSTALLATION (TOP VIEW) FIX SUPPORT SEE DETAIL-2 FOUNDATION (BY CIVIL) FOUNDATION 50 100 ANGLE STEEL 63 65 V63X63X6 DOUBLE NUT M14 65 AHU/OAHU AHU/OAHU MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: TYPICAL INSTALL AHU/OAHU UNIT APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: AIR COMPRESSOR AIR COMPRESSOR INSTALLATION (ELEVATION VIEW) DETAIL-1 RUBBER t = 5mm thk ANGLE STEEL V63X63X6 MARKING RED/BLUE DOUBLE NUT M14 ANCHOR BOLT M14 RUBBER, t = 5mm thk AIR COMPRESSOR FOUNDATION FIX SUPPORT SEE DETAIL-1 FOUNDATION (BY CIVIL) 1FL+00 50 150 DETAIL-2 ANGLE STEEL 62 FOUNDATION 63 V63X63X6 DOUBLE NUT M14 AIR COMPRESSOR INSTALLATION RUBBER, t = 5mm thk 62 (TOP VIEW) FIX SUPPORT SEE DETAIL-2 AIR COMPRESSOR FOUNDATION (BY CIVIL) MECHANICAL WORK AIR COMPRESSOR KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: TYPICAL INSTALL AIR COMPRESSOR APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: CHILLER INSTALLATION DETAIL-1 (ELEVATION VIEW) MARKING RED/BLUE BOLT M16 ISOLATOR MARKING RED/BLUE DOUBLE NUT M12 ANCHOR BOLT M12X2PCS FOUNDATION CHILLER INSTALLATION BASE INSOLATORX6 PCS SEE DETAIL-1 FOUNDATION (BY CIVIL) A B C A B C UNIT BASE CONTROL BOX CHILLER INSTALLATION FISTRIBUTION OF SHOCK ABSORBER (TOP VIEW) INSOLATORX6 PCS C UNIT MODEL LOAD OF SPRING SHOCK ABSORBER (kg) A B C FOUNDATION (BY CIVIL) B MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG TYPICAL INSTALL CHILLER PROJ MANAGER: A APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: DETAIL CHILLER PUMP DETAIL-2 FF ELECTRIC PUMP& DIESEL PUMP FIX BOLT SUB FOUNDATION INCLUDDE STEEL FRAME & CONCRETE MARKING RED/BLUE DOULBLE NUT M14 RUBBER 10MM ANCHOR BOLT M14X4 PCS FOUNDATION MARKING RED/BLUE DOULBLE NUT M20 SEE DETAIL-2 FOUNDATION (BY CIVIL) RUBBER, t = 5mm thk ANCHOR BOLT M20 ADD CONCRETE FOUNDATION FF PUMP INSTALLATION (ELEVATION VIEW) CHILLER PUMP INSTALLATION (ELEVATION VIEW) FIX BOLT X 6PCS FOUNDATION (BY CIVIL) CHILLER PUMP FIX BOLT SEE DETAIL FOUNDATION (BY CIVIL) CHILLER PUMP INSTALLATION (ELEVATION VIEW) FIX BOLT X 4PCS FOUNDATION (BY CIVIL) FF ELECTRIC PUMP& DIESEL PUMP FUJITA CORPORATION PROJECT: KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY VSIP IZ - HAI PHONG - VIETNAM WORKING METHOD (MECHANICAL WORK) 13 SUPPORT & SLEEVE ON PC SLAB WORKING PLAN HAI PHONG, 2018 DETAIL INSTALL THREAD ROD ON PC SLAB Step-1: Marking & Drilling hole Hole Ø10 & Ø12 Panel concrete (PC) 2FL ± 0.00 Joint line Panel concrete (PC) Panel concrete (PC) Location to install thread rod MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: DETAIL INSTALL THREAD ROD ON PC SLAB APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: DETAIL INSTALL THREAD ROD ON PC SLAB Step-2: Install thread rod Rebar (By civil) Panel concrete (PC) 2FL ± 0.00 Nut M10/M12 Steel plate 40x40x3t Sealent Thread rod M10/M12 Anti corrosion paint Panel concrete (PC) Nut M10/M12 Rebar (By civil) Panel concrete (PC) Location to install thread rod Steel plate 40x40x3t Sealent Thread rod M10/M12 Nut M10/M12 Steel plate 40x40x3t MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD Thread rod M10/M12 TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: DETAIL INSTALL THREAD ROD ON PC SLAB APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: DETAIL INSTALL SLEEVE ON PC SLAB Step-1: Make hole on PC by civil Hole on PC (By civil) 2FL ± 0.00 Panel concrete (PC) ØD Panel concrete (PC) Hole for Pipe penetrate PC slab (by civil) Panel concrete (PC) MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: DETAIL INSTALL SLEEVE ON PC SLAB APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: DETAIL INSTALL SLEEVE ON PC SLAB Step-2: Install Sleeve & reinforcement (by Kinden) Rebar (By civil) Sealent ØD 2FL ± 0.00 Install Sleeve & reinforcement (By Kinden) Panel concrete (PC) Install Sleeve & reinforcement Rebar (by civil) (by Kinden) Panel concrete (PC) MECHANICAL WORK KYOCERA DOCUMENT TECHNOLOGY VIETNAM CO., LTD TYPICAL DRAWING KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY LOT 56A, 56B, 56C - VSIP HAI PHONG PROJ MANAGER: DETAIL INSTALL SLEEVE ON PC SLAB APPROVAL BY: CHECKED BY: CONSTR.STAGE DESIGNED BY: SCALE: DRAWING NUMBER: DATE: ... DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY VSIP IZ - HAI PHONG - VIETNAM WORKING METHOD (MECHANICAL WORK) INSERT & ANCHOR WORKING PLAN HAI PHONG, 2018 FUJITA CORPORATION Form: Project: KYOCERA... KYOCERA DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY VSIP IZ - HAI PHONG - VIETNAM WORKING METHOD (MECHANICAL WORK) SLEEVE WORKING PLAN HAI PHONG, 2018 FUJITA CORPORATION Project: KYOCERA DOCUMENT TECHNOLOGY... DOCUMENT TECHNOLOGY VIETNAM PHASE FACTORY VSIP IZ - HAI PHONG - VIETNAM WORKING METHOD (MECHANICAL WORK) GI PIPE & BS PIPE WORKING PLAN HAI PHONG, 2018 FUJITA CORPORATION Form: Project: KYOCERA

Ngày đăng: 28/11/2018, 22:12

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan