Bien phap to chuc thi cong cho cong tac nao vet...........Each activity shall be controlled and identified by means of the certificate to confirm that each process or activity has been satisfactorily completed and that te certificate of test to be performed and the required documents to be verified. Where discrepancies exist with any items of supply or vendor data, the person in charge of the inspections will segregate and identify the items and inform the QAQC QS Manager for further action on the nonconforming items. Bên mình tách rời 2 bộ phận này chứ nhỉ
Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC Method Statement Co ns en to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru se Dredging at Port of Cork Port of Cork Estuary IMPORTANT Any changes to working methods not identified within this method statement, will involve cessation of the works until a full risk assessment has been conducted on these changes and the method statement has been altered accordingly to reflect these changes Advice from the QHSE Department should also be sought on these changes This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: Function Initials Date Prepared by Farrell McCullough FMC 07-Sept-2017 Verified by Farrell McCullough FMC 07-Sept-2017 Approved by Jasper Blaauw JBW 07-Sept-2017 Document owner Staff Manager QHSE FMC Signature Revision record se ru ot he First Issue Date 07-Sept-2017 to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny 1.0 Revision Number Description Supporting documents Document Name PMP-20.3432 Project Management Plan Maintenance Port of Cork Co ns en Document Number Distribution list Paul O‘Regan [Port of Cork] Kevin O’Callaghan [Port of Cork] Harbour / Survey offices [Port of Cork] Master & crew of Volvox Olympia, Jetsed, Seblau [Van Oord] This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: Definitions se ru he Co ns en to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot Abbreviations HSE Health, Safety and Environment ITP Inspection and Test Plan MS Method Statement PPE Personal Protective Equipment QA/QC Quality Assurance / Quality Control CD Chart Datum MD Managing Director OM Operations Manager PM Project Manager WM Works Manager SI Superintendent Kp Kilometer point/Chainage WID Water Injection Dredging TSHD Trailing Suction Hopper Dredger RA Risk Assessment COSHH Control of Substances Hazardous to Health EMS Environmental Management System IMS Integrated Management System ISM International Safety Management ISPS International Ship and Port Facility Security Code PMP Project Management Plan IRE Ireland NL The Netherlands PEP Project Emergency Plan FMC n/a This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC Table of Contents REVISION RECORD SUPPORTING DOCUMENTS DISTRIBUTION LIST INTRODUCTION 1.1 General Project Description 1.2 Scope of this Document 1.3 Responsibilities HEALTH, SAFETY & ENVIRONMENT to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru se 2.1 Health and safety 2.2 Personnel 2.3 Reporting of incidents and near misses 2.4 Emergency response 2.5 Risk assessment 2.6 Environment 2.7 Pre-Check Procedure 2.8 Training SCOPE OF WORKS 3.1 Scope of Works 3.2 Resources 3.2.1 Personnel 3.2.2 Vessels 3.2.3 Commencement Date and Duration EXECUTION OF THE WORKS 10 ns en 4.1 Mobilisation and Demobilisation 10 4.2 General Description of Dredge activities by a Trailing Suction Hopper Dredger 10 Co 4.2.1 Loading the TSHD 12 4.2.2 Sailing Full 12 4.2.3 Unloading the TSHD through bottom doors / valves 12 4.2.4 Sailing Empty 13 4.3 Survey 13 4.4 Work Method 13 4.4.1 Work Method 13 4.4.2 Weather Conditions 13 ASSISTING EQUIPMENT FOR THE TSHD 14 5.1 Scope of Works: 14 5.2 Sequence of Works: 14 5.3 Programme 14 5.4 Limitations 14 EQUIPMENT 15 6.1 Equipment for maintenance dredge [TSHD] 15 6.2 Equipment for maintenance dredge [WID] 16 SURVEY 17 APPENDIX 18 This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC Introduction 1.1 General Project Description The Port of Cork Company has awarded Van Oord a contract for the Maintenance Dredging in Cork for a year period The interval between campaigns is expected to be years and the first campaign was in 2011 This involves the dredging of silt, clay, loose and hard compacted sand and gravel and other materials, including some debris normally encountered in the execution of Maintenance Dredging contracts ru se 1.2 Scope of this Document The purpose of this Method Statement is to give an adequate description of the dredging, disposal and survey methods to be followed and the precautions to be aware of in carrying out the works This Method Statement will ensure that the works will be carried out in a safe, secure and efficient way The Risk Assessment is part of this Method Statement and should be seen as a ‘live’ document which will be altered if there is any change in circumstances or knowledge to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he The sequence of operations described in this document is governed by weather and tidal conditions This Method Statement has developed and will be implemented with the health and safety and welfare of all personnel, the public, wild life and the environment being of utmost priority The contents of this Method Statement are to be verbally communicated to the workforce involved by the Project Manager the day prior to the task commencing, this ensures that the correct personnel, tools and equipment are in place and gives enough time for suggestions or additional control measures identified during the briefing to be included within the Method Statement, prior to the task commencing on each location Co ns en The Method Statement will then be re-briefed in the form of a toolbox talk on the day of the activity, to ensure that the requirements are fully understood Feedback from the workforce is encouraged This Method Statement is to be read in conjunction with the Project Management Plan This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC 1.3 Responsibilities The achievement of a satisfactory standard of quality is the responsibility of all those assigned to the project The description of the responsibilities involved in the management of the site project team is provided in the table below Van Oord Ireland Project Team Dredging of Port of Cork Port of Cork (Client) Henry Kingston Van Oord UK - MD Maurits den Broeder QHSE Jeanette Wright ot Sr Surveyor Ronald Koppe / Elbert Hanhart to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Works Managers Farrell McCullough he ru se Project Manager Jasper Blaauw Survey intern Daan Luikens Equipment Crew Co ns en The following site staff have the following responsibilities: • Project Manager: Overall responsibility for ensuring safe working systems and control; • Works Manager: Coordination of the works, and the work related operations; • Sr Surveyor: Responsible for all surveying work, contractual and requested This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC Health, Safety & Environment Van Oord will execute all works in line with Contract requirements, Irish legislation, European, and International Guidelines and Standards In view of the potential hazards for this type of work in these circumstances and in addition to the project related procedures, special attention is drawn to, but not limited to, the following: to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru se 2.1 Health and safety In order to arrange, provide and maintain safe systems of work for all employees at all times: • Areas of HSE responsibility will be clearly defined and relayed to the whole project team; • Adequate and proper facilities, equipment and apparatus will be provided and its correct use will be ensured, Through training, all areas are to be kept clean and tidy and personnel will be responsible for ensuring their equipment is stored correctly at all times • Adequate training, instruction and information on Site specific Health, Safety and Environmental hazards and risks will be provided • A pro-active approach will be taken to Health, Safety and the Environment at all times, hazard spots and near miss reporting will encouraged throughout the duration of the project and any incidents will be investigated ensuring that procedures and / or RAMS are updated appropriately 2.2 Personnel All construction personnel involved in the work will observe the following basic working rules, amongst others: • • ns en • Relevant personnel protective equipment (PPE) will be issued and used prior to the commencement of the work; PPE shall be worn at all times on site with exception of the dedicated safe area(s) and welfare facilities; Proper training and induction in the various roles for the type of activity will be performed; Experienced and active supervision will be in place at all work times Co • At least the following PPE should be worn to execute the works as described in this Method Statement: Hi-Viz Safety Shoes Helmet Life Jacket The indicated PPE should be worn at all times, excluding when inside the ships accommodation area The Life Jacket Must be worn when working near open water where no sufficient handrail or edge protection is present or when accessing / egressing the vessel 2.3 Reporting of incidents and near misses Incidents and near misses will be timely reported in compliance Van Oord corporate procedure This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC 2.4 Risk assessment Risk assessments will be carried out in order to identify and control all hazards to the activities and to associate the risk and/or reduce it to acceptable levels The risk assessment for this method statement can be found in appendix 2.5 Emergency response Emergency Response will be in compliance with Van Oord corporate procedure and the project Emergency Response Plan which is on board the dredger Before the start of the Project an actual plan with actual names and numbers will be made and provided to all concerned The emergency response charts are provided in appendix • • • • he ot to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny • ns en • All personnel will be appropriately trained about environmental issues prior to the start of the operation; All equipment will be in good condition to avoid spillage or discharge of oil, smoke and excessive noise; Refuelling will be carried out by competent and trained people away from any environmentally sensitive areas; and dredger to be moored up securely An appropriate waste container will be placed to collect waste before the final disposal by authorised company and hazardous material storage areas will be identified, labelled, and properly marked and fitted with spill containment systems; Dredger will be checked for any fuel / oil leaks on a regular basis by the crew Any spills we be reported immediately to the site agent/authorities In the event of a major spill due to damage to the dredger Locate and isolate, inform harbour authorities, Project manager and environmental agency Co • ru se 2.6 Environment In order to minimize environmental impacts arisen from the work based on ecological knowledge and on regulatory background the following measures will be taken: 2.7 Pre-Check Procedure Prior to commencing operations, all vessels, plant and machinery will hold relevant up-to-date certification, carry sufficient emergency oil spill kits, first aid kits and be more than adequate for their respective responsibilities Weather reports, both long and short range, will be available on a daily basis, when dredging equipment is on site All relevant stakeholders will be informed of all operational movements Prior to commencing operations, Port Control will be contacted daily to confirm the number and extent of other ongoing works by third party contractors within the Outer Harbour area The location, type and extent of these works will be assessed and included as part of the Risk Assessment 2.8 Training All personnel will be competent, experienced and hold all relevant certifications, a copy of which will be held on the site files VO will provide further training, as and when required Safe working methods will be relayed to all personnel through RAMS Briefings and toolbox talks, this will also take place following any revisions and changes to the RAMS This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC Scope of Works 3.1 Scope of Works Maintenance dredging has to be carried out in the berths, on the approaches to the berths, in navigational channels and the harbour basins in the Port of Cork, all as is shown on the layout drawings and tables received from the client The river-bottom in the designated areas shall be dredged to ensure that the design depths are provided throughout the above described area The design depths will be the advertised depth plus a specified additional buffer depth to cater for future siltation he ru se The method of dredging and transporting material shall be such as to avoid deposition of material in navigable channels to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot 3.2 Resources Co 3.2.2 Vessels - TSHD Volvox Olympia - WID Jetse [or similar] ns en 3.2.1 Personnel Site Staff: - WM - Surveyor Equipment - Safe manning [as a minimum] + required for dredging On request a Crew list can be provided Technical specifications can be found in chapter 3.2.3 Commencement Date and Duration The project kick-off meeting is held on the 31st of August, the project will be undertaken during the months September & October 2017 [subject to license and equipment/project planning] This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: 10 of 19 Revision date: 07-Sept-17 Client Port of Cork Author: 4.1 FMC Execution of the Works Mobilisation and Demobilisation The project will commence with mobilisation of the survey vessel ‘ Seblau ‘ approx one week prior to arrival of the WID JetSed [transport by road trailer] The TSHD which will be made available will be scheduled to arrive in Cork at a mutually agreed start date Prior to arrival the Harbour Master will be informed and all required documents will be submitted Prior to arrival of the WID/TSHD in the Port of Cork, the survey department will board the vessel to install the necessary survey equipment and the latest survey information from the in-survey ru se The Project Manager will also board the vessel for an Kick-off meeting / Toolbox talk ot he 4.2 General Description of Dredge activities by a Trailing Suction Hopper Dredger to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny A Trailing Suction Hopper Dredger is a vessel that is suited for deep-sea navigation with the ability to load material into its own hopper by means of centrifugal pump(s) and suction pipe(s) Figure shows a possible layout of a TSHD Co ns en Trailing Suction Hopper Dredgers belong to the type of non-stationary dredgers This means that TSHD are required to sail during dredging operations Figure Typical TSHD layout When the Trailing Suction Hopper Dredger approaches the dredging area, at the start of a new dredging cycle, the TSHD will reduce its speed and will put the trailing suction pipes overboard During the approach the suction heads at the end of the trailing suction pipes will be kept a couple of metres above the seabed until the indicated dredging area has been reached Once close to the indicated dredging area the dredge pumps will be started The dredge pumps will start taking in seawater through the trailing This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Job Company Job Works Manager Project Manager Surveyor Van Oord Van Oord Van Oord Authorised: JBW Attendees: Name RA chairman: Company Crew TSHD/WID Crew Seblau Insufficient barriers, Edge protection ru he Initial Risk S L R Van Oord Existing Safeguards Barriers to be inspected prior to work Experienced crew Kick off meeting before works Emergency rescue plan in place for MOB Regular serviced life jackets while on deck ot Consequence to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Working on or near water on board the vessel Hazard Falling in water causing Hypothermia/drowning ns en Activity Co Item no se Farrell McCullough Jasper Blaauw Ronald Koppe / Elbert Hanhart Name 4C Additional Safeguard Vessel / Project No lone working Sand/salt for non-slip decks By FMC Residual Completion Risk Reference S L R 2C Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Dredging Unsafe working practise Not using or incorrect use of life jacket Falling in water causing hypothermia/drowning Using electric tools & coming into contact with water Electrocution Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R Van Oord QHSE FMC 2C Inspect before use FMC 2B Use tools only when tied up alongside FMC 1A ru 4D Van Oord Existing Safeguards Project plan Method statement Risk assessments QHSE monitored Emergency procedures Emergency phone list Good maintenance Competent crew Professional equipment Correct wearing of life jacket Training in use Inspect before use by competent person Annual inspection(tested) Initial Risk S L R Consequence se Hazard to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he Activity ns en 4B Working on or near water on board the vessel Co Item no Authorised: JBW 3A Safety line on tool being used Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages 4C Falling in water causing hypothermia/drowning head/minor injury Van Oord Existing Safeguards Use ladder in correct way Only step across if safe to so Make clear instruction of your intentions to other crew member Wear life jacket Additional Safeguard Vessel / Project Moore up on floating pontoons(so no climbing) By Residual Completion Risk Reference S L R FMC 2C FMC 2B Working on deck at night Falling in water causing hypothermia/drowning head/minor injury ns en Working on or near water on board the vessel to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he Access & Egress onto jetty Using a ladder Initial Risk S L R Consequence se Hazard ru Activity Co Item no Authorised: JBW 3B Adequate lighting Crew work together Good housekeeping(clean decks) Competent crew Monitoring of water levels First aider on board Good radio communications Avoid working on deck at night Stay in wheelhouse at night Only moore up when alongside Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages 2b Injury se Breaking mooring ropes Van Oord Existing Safeguards Inspection of mooring ropes before use Monitor weather conditions Don’t lose sight of operator, communicate what you are doing No excess force on ropes from engine power ru Working on or near water on board the vessel Initial Risk S L R Consequence Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R Competent crew FMC 1A Competent crew FMC 2A Competent crew FMC 2A Competent crew FMC 2A Competent crew FMC 2A he Hazard Wet surfaces Serious injury Fracture bruising 3C ns en Working on or near water on board the vessels Slips trip,& falls to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot Activity Co Item no Authorised: JBW Obstructed walkways Serious injury Fracture bruising Cables on walkways Serious injury Fracture bruising 3c Insufficient lighting injury 2B 3C Good housekeeping on deck Correct nonslip safety shoes Minimise work on deck Plan storage of materials Clean & tidy deck Put stores away immediately Use cable covers Use signage Avoid any trip hazard Make sure all deck lights are working with spare bulbs available Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Serious injury Falling overboard 3B Van Oord Existing Safeguards Safety shoes are compulsory Clean spillages immediately Spill kits available Good housekeeping Degreaser available Report all spillages Barriers inspected daily Competent persons Toolbox talk on slips trip & falls No lone working Emergency rescue plan in place Clean decks Good lighting Serviced life jackets worn Monitor weather conditions No loose clothing Wear overalls Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R Safety shoes renewed on request FMC 2B Clean tidy decks FMC 2B Salt bags on standby for cold weather FMC 2b Serious injury Fracture bruising ru Tripping over Catching loose clothing on deck Edge protection not in place Ice Not paying attention 3B he Serious injury Fracture bruising ot Greasy / oily surfaces se Inappropriate footwear Initial Risk S L R Consequence to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Working on or near water on board the vessel Slips trip,& falls Hazard ns en Activity Co Item no Authorised: JBW 3b Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Activity Hazard Hand injury 3b Van Oord Existing Safeguards Wear gloves No lone working Inspect wire for any deficiencies No lone working Agreed hours of work hours off work inbetween tides Take breaks (share operating) Health assessments Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R Avoid any wire work FMC 2b Keep working hours to a minimum for crew Crew works 14 days on 14 days off FMC 2b Monitor weather FMC 2b ot Antisocial behaviour Ill health Lack of performance Lack of concentration to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Lone working Stress Lack of sleep 3b ns en Working on or near water on board the vessel Tidal works he ru se Wire handling Initial Risk S L R Consequence Working in very cold conditions Hypothermia Time off work Co Item no Authorised: JBW 2c Wrap up warm on deck Hat & gloves Take regular breaks in heated wheel house Take extra care on deck Don’t rush Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Activity Over exposure to noise in engine/pump room Initial Risk S L R Consequence Tinnitus Ringing in ear Loss of hearing 2c Van Oord Existing Safeguards Use ear defenders Noise monitoring Display signs No more than minutes exposure Additional Safeguard Vessel / Project No going in engine room or pump room while working By Residual Completion Risk Reference S L R FMC 1b FMC 2b se Working on or near water on board the vessel Noise Hazard Lifting heavy items Severe back pain Muscle pain Lifelong back pain ns en Manual handling to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru Wear possible use lifting aid Manual handling training to crew Know the weight you are lifting Can you spilt the load to smaller weights No trip hazards present Avoid repetitive handling 3b Competent crew Co Item no Authorised: JBW Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Hazard Initial Risk S L R Consequence Van Oord Existing Safeguards Instructions of correct lifting method Use mechanical aid wear possible Make sure no fingers can get trapped No obstructions in way Good handles on item to be lifted Do not push or pull load that’s heavy Do not lift if history of back problems Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R ru he 3b ot Severe back pain Muscle pain Lifelong back pain Competent crew FMC 2b to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Lifting heavy items in wrong way ns en Manual handling se Activity Co Item no Authorised: JBW Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Hazard Initial Risk S L R Consequence Van Oord Existing Safeguards All substances stored in well ventilated & lockable containers Signage in place Fire extinguishers in place COSHH assessments for all on board chemicals available No smoking signs Appropriate PPE available Crew aware of what & wear on board Spill kits on stand by while refuelling Stop any leakage in water course using spill kits Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R Hazardous substances ns en COSHH Fire & explosion Exposure Inhalation of toxic substances Contact with skin to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru se Activity Co Item no Authorised: JBW 3b FMC 2b Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages Hazard Initial Risk S L R Consequence Van Oord Existing Safeguards Coshh assessments available Wear proper PPE Ensure fuel caps are replaced Delivery from professional company Designated fuelling place Spill kits available Drip trays available Pollution prevention plan available Booms available Eye wash station available Emergency phone numbers available Additional Safeguard Vessel / Project By Residual Completion Risk Reference S L R ru he ot to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Refuelling 3c ns en Refuelling Environnemental damage Skin & eye contamination Explosion,fire,burns se Activity FMC 2c FMC 2c Co Item no Authorised: JBW Working on or near water on board the vessel Swell Damage to crew and equipment 4C Standing instruction not to dredge when swell is above 1.5m for TSHD and 0.5 for WID and/or when skipper is not comfortable to dredge Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17 rev 1.0 Page of 11 pages 3c se Damage to crew and equipment and port facilities Van Oord Existing Safeguards Stay in contact with Port Control via VHF Especially during dredging the berths, extra care should be taken ru Collision/interferen ce shipping with dredging operations Initial Risk S L R Consequence Dredging in another area as directed by port control in case of shipping By HM/Port Control to provide an daily update about expected ship movements that day FMC Residual Completion Risk Reference S L R 2c Live Document ns en Others Additional Safeguard Vessel / Project to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot Shipping Hazard he Activity Co Item no Authorised: JBW Document number: VOMS-PR1.10-TE-01 Prepared by: QHSE Rev 1, 13-10-2011 EPA Export 13-09-2017:03:14:26 Project Management Plan Project: Project no Cork Maintenance Dredging Contract 20.3432 Page: 19 of 19 Revision date: 07-Sept-17 Client Port of Cork Author: FMC Co ns en to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru se Appendix – Emergency flowcharts & route to hospital This document remains intellectual property of Van Oord Ireland Ltd and may not be published or distributed without written consent from owner EPA Export 13-09-2017:03:14:26 Port of Cork Maintenance Dredging 2017 20.3432 – Offshore Emergency Emergency Response Plan – Appendix Offshore emergency flowchart Revision A Page of Offshore emergency flowchart FIRST ON SCENE Raise alarm, alert others in are, provide First Aid, rescue or fire fighting actions, if trained Master takes onscene command (major emergency) to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny Minor Major Master notifies Project Manager / ERT Co ns en Vessel crew takes necessary actions Master informs Project Manager / ERT about minor emergency and actions taken eDOCS No: #3318819 Master notifies: ot he Master determines emergency (minor / major) ru se Notify Master Port Control VHF16 or +353 21 481 1380 FIRE 112 Police 112 Ambulance 112 Project Manager notifies Client and if necessary initiates Van Oord Emergency Assistance Procedure VOMS-PR2.04-TE-03-06-04 rev EPA Export 13-09-2017:03:14:26 Port of Cork Maintenance Dredging 2017 20.3432 – Onshore Emergency Emergency Response Plan – Appendix Onshore emergency flowchart Revision A Page of Onshore emergency flowchart FIRST ON SCENE Calls Emergency Number Raise alarm, alert others in are, provide First Aid, rescue or fire fighting actions, if trained ERT member takes on-scene command (major emergency) to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ERT member determines emergency (minor / major) ru se F McCullough +44 7860 928 134 Minor Major ERT member notifies Project Manager FIRE 112 Police 112 Ambulance 112 Co ns en If necessary, ERT member contracts VO First aid or fire fighting members ERT member notifies: Project Manager notifies Client and if necessary initiates Van Oord Emergency Assistance Procedure eDOCS No: #3318820 VOMS-PR2.04-TE-03-06-03 rev EPA Export 13-09-2017:03:14:26 Revision A Page of Co ns en to f c Fo op r i yr ns ig pe ht ct ow ion ne pu r r rp eq os ui es re o d nl fo y ny ot he ru se Port of Cork Maintenance Dredging 2017 20.3432 – Route to Hospital Emergency Response Plan – Appendix Route to hospital TELEPHONE NUMBER +353 (0) 21 454 6400 eDOCS No: #3318818 VOMS-PR2.04-TE-03-06-05 rev EPA Export 13-09-2017:03:14:26 ... of Maintenance Dredging contracts ru se 1.2 Scope of this Document The purpose of this Method Statement is to give an adequate description of the dredging, disposal and survey methods to be followed... Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17... Name: Port of Cork Maintenance Dredging Project stage: Maintenance Dredging Project no:20.3432 RA document number: SM 001 Prep: FMC Reference: Method Statement Dredging Revision / Date: 07-Sept-17