Chapter IIIa construct foundation blockthi cong mong khoi EN

14 137 0
Chapter IIIa construct foundation blockthi cong mong khoi EN

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

... PUMP IN FOUNDATION PIT Construction methods for foundation pit Bottom foundation treatment Concreting spread footing Fill up the foundation pit Organize spread footing construction  Requirements:... FOOTING Construction methods for foundation pit Bottom foundation treatment Concreting spread footing Fill up the foundation pit Organize spread footing construction  Requirements:  After the foundation. .. Hầm CHAPTER IIIa – CONSTRUCTION OF THE SPREAD FOOTING ON NATURAL GROUND Trường Đại học Giao thông Vận tải Bộ môn Cầu Hầm MAIN CONTENTS  Construction methods for foundation pit  Bottom foundation

Ngày đăng: 13/04/2018, 16:44

Từ khóa liên quan

Mục lục

  • ARTIFICIAL WORKS F2

  • CHAPTER IIIa – CONSTRUCTION OF THE SPREAD FOOTING ON NATURAL GROUND

  • MAIN CONTENTS

  • PowerPoint Presentation

  • Slide 5

  • Slide 6

  • Slide 7

  • Slide 8

  • Slide 9

  • Slide 10

  • Slide 11

  • Slide 12

  • Slide 13

  • Slide 14

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan