... total annual order cost, carrying cost, and materials costs at EOQ (considering quantity discounts) Compute the annual order cost, carrying cost, materials cost, and total cost at each discount... 500 12 250 1,000 500 2,000 1,000 Materials: Controlling, Costing, and Planning Order cost Carrying cost ($1.125 per unit) Materials cost: 6,000 x $3.92 6,000 x $3.84... product B safety stock level C order-placing costs D storage costs E risk of inventory obsolescence and deterioration Materials: Controlling, Costing, and Planning 120 B 23 Brad Company has correctly