Experience in southeast asia vietnam SKorea last 10 years 2015

17 193 0
Experience in southeast asia vietnam SKorea  last 10 years 2015

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Stung Chinit Irrigation and Rural Infrastructure, Cambodia Ministry of Water Resources and Meteorology, Phnom Penh Asian Development Bank (ADB), Manila Rehabilitation of existing scheme to increase agricultural productivity by improvement of infrastructure in and around the project area, formation and training of water user groups, cost recovery measures and strengthening of government staff Proposal for the irrigation in the project area comprised the construction of a multipurpose dam (irrigation, hydropower and flood attenuation), a pump station and a flood protection dike, together with a drainage pumping station Feasibility studies including: Technical field investigations (soils etc.) topographic survey (orthomapping with detailed strip survey; scale 1:5000), farmer community organisation and training, system operation studies, detailed design of irrigation and drainage works, preparation of tender documents, contract packaging, construction supervision, systems management training Since 2001 Provincial Power Supply Phnom Penh, Cambodia Electricité du Cambodge (EDC) Asian Development Bank (ADB) Consultant services to assist EDC with the implementation of the Provincial Power Supply Project (PPS), funded under ADB loan, to rehabilitate and extend the electricity systems in eight provincial centres of Cambodia LI's terms of reference include diesel generation, environmental and hydrological tasks Small diesel power stations: Number of locations: Number of units: 20 Unit capacity: 250 to 1000 kW Fuel: diesel oil Site investigation; conceptual design; technical specification; tendering and evaluation; site supervision; investigation of soil and groundwater contamination; proposal of remedial and disposal measures; assessment of related environmental risks; estimation of cost related to remedial measures 2002-2004 CAMBODIA GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Poko & Bakaru II HEPs, Update of Studies, Indonesia P.T PLN (Persero) Poko Dam of up to 140 m height, power conduit system of 2.6 km length with pressure shaft, cavern powerhouse and 2.3 km long tailrace tunnel Bakaru extension with 5.6 km long headrace tunnel and 1.6 km long pressure shaft to existing powerhouse on Mamasa River Update of Feasibility Study for Poko HPP, Update of Feasibility Study/Detailed Design for 126 MW Bakaru II HPP Extension Project; Condition Assessment and rehabilitation concept for existing 126 MW Bakaru I HPP since 2014 Hydropower Mamasa River Potential Study, Indonesia World Bank Pre-feasibility Study of potential hydropower projects on Mamasa River upstream and downstream of existing hydropower projects; Design of a new hydropower project with a 4.6 km long headrace tunnel, 600 m long pressure shaft and x 70 MW capacity in shaft powerhouse Masterplan level analysis of hydropower potential, prefeasibility design of two potential hydropower projects with an installed capacity above 100 MW on Mamasa River, integration of potential projects in system extension planning study since 2014 Update Existing Studies Small HEPs, Indonesia P.T PLN (Persero) small hydropower sites, Capacity: 0.5 MW to MW Head: 10 m to 140 m Discharge: 0.75 m³/s to 35 m³/s Turbine Types: Francis, Pelton, Kaplan Review of existing Feasibility Studies, Evaluation and selection of most promising sites, Additional topographical and geological investigations, Update of Feasibility Studies for to sites since 2014 Pumped Storage Power Plant, Sumatra (Site Selection Study), Indonesia P.T PLN (Persero) Storage power plants with cavern powerhouses housing pump turbines of 200 MW each, with heads varying between 400 m and 640 m Survey of the island Sumatra for identification of sites, which are suitable for the development of pumped storage plants The projects shall be capable of providing at least 400 MW power over a continuous time of four hours to the electric grid Conceptual designs including cost estimates and economic assessments shall be elaborated for selected projects since 2014 INDONESIA KfW KfW KfW GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Consultancy Services of Quality Assurance and Quality Control for Three Coal Fired Power Plant Projects, Indonesia PT PLN (Persero), Indonesia Capacity: Indramayu PP (Jawa Barat) : x 330 MWel Palabuhanratu PP (Jawa Barat) : x 330 MWel Tanjung Awar-Awar PP (Jawa Timur) : x 350 MWel Fuel : lignite coal Design review and approval, progress and design meetings, workshop inspections and tests, supervision and monitoring of project execution, procurement, construction and commissioning, home office back up services, guarantee period 2007-2016 Market Study on the Power Supply Sector in Indonesia ETA – Power Projects Division, Dubai UAE In-depth market sector study covering a broad field of services with regard to Indonesia’s overall power sector set-up However, assessing in particular the current status and expected future development of largescale thermal power plants as well as new power plant projects to be implemented Special objective is hence to identify promising market entry options for potential Independent Power Producers (IPP) Overview on electricity policy and institutional setting, present state of power supply system, development of electricity demand, electricity tariffs, new power plant projects 2008 GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Bengkulu Water Supply Project, Training Program in Operation and Maintenance, Indonesia PDAM Water Enterprise of Bengkulu City, Indonesia Training for O & M staff responsible for water treatment, water resources protection, mechanical and electrical equipment, trunk mains and distribution system service connections, warehouse and repair shops Training included the following topics: Quality and strategic management (including subjects as documentation, monitoring, indicators and targets, record keeping, corrective and preventive actions), water production (coagulation flocculation, filtration, disinfection, chemical storage, water quality tests), electrical mechanical equipment, instrumentation - service, operation calibration emergency measures, distribution network (installation and repair, leakage control and leak detection, metering and meter control/testing, repair and calibration 2002-2004 Nam Theun Electricity Consortium (private ownership company) Storage power plant, installed capacity: 1,074 MW, Francis turbines, design head: 348 m, RCC dam, height 48 m with overflow spillway (6,900 m3/s), pressure tunnel and 130 km long transmission line to Thailand Review of project design, tender documents, technical and contractual assistance to owner, construction supervision Since 2000 Amcorp Power Sdn Bhd, Malaysia Electrical Output, Total Plant 1,000-1,400 MW Type Power Generation: Combined Cycle Plant Configuration: multiple blocks, multi- or single-shaft arrangement Gas Turbine Class: Large Scale Fuel: Natural Gas / Distillate Analysis of the RfP, participation at site visit & pre-bid conference, thermodynamic calculations, development of technoeconomic model, Plant optimisation study for main GT models, elaboration of Plant optimization report 2012 LAOS Nam Theun II, Laos MALAYSIA 1,000-1,400 MW Prai IPP, Technical Advisory Services, Malaysia GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Megasteel Integrated Power Plant, Malaysia Megasteel Sdn Bhd., Malaysia Integrated Power Plant: 420 MW Gas Fired Boilers: 2x90 MW Fuel: BFG and COG Boiler Turbine Generation Plant: x 135 MW Fuel: COG, coal & coke dusts and supplementary bituminous (thermal) coal Phase 1: Pre-Tendering Phase: Data collection and review, conceptual design and implementation plan, grid study 2007-2008 Phase 2: Tendering Phase: Invitation to bid, bidding period, evaluation of bid proposals, contract negotiations MYANMAR Upper Yeywa Ministry of Electric Power Storage power plant, open-air powerhouse, L/H/W 102 m/57 m/38 m installed capacity: 280 MW, Francis turbines headrace tunnels, D/L 10.0-12.5 m / x 500 m RCC dam height 90 m / crest length 243 m Review of existing basic design, elaboration of construction design, supervision and quality control, on-the-job training of counterpart engineers 2013-2018 Technical PPPAdvisor, Myanmar Deloitte Touche Tohmatsu India Private Limited Capacity Building project to allow the executing agencies to implement and monitor largescale IPP projects in the electricity generation sector Setting Framework Conditions (i.e defining key parameters, development minimum functional specifications, environmental compliance specifications to be considered in PPP ICB documentation) Project Screening, Evaluation and Prioritization of Potential Project Candidates Support Development of Preliminary Project Profiles (i.e pre-feasibility Studies of candidate projects) 2014-2015 GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Philippine International Air Terminals Co., Inc (PIATCO), Manila BOT of a new International Passenger Terminal Review of the EPC-contractors detail design drawings, supervision of construction of the EPC-contract, contract administration, claims management, quality management 2000-2008 Asian Development Bank Technical support to the Subregional Energy Forum to safeguard the realization of the GMS Road Map for Expanded Cooperation in the Energy Sector and promote capacity building in the GMS countries in renewable energy, clean fuels, and energy efficiency policy, plan, and program formulation Knowledge sharing facilitation in the GMS and SEF organization RE, EE, clean energy and climate change studies Knowledge dissemination Strengthening SEF capacity and knowledge sharing Establishment of regional database Best practice studies Review of national performance targets Preparation of regional performance targets Renewable energy and clean energy resource assessment Energy efficiency potential assessment Renewable energy, energy efficiency and clean energy resource maps Project pipeline preparation Business model concepts and suitability Initiation of Pilot projects 2011-2012 PHILIPPINES Ninoy Aquino International Airport, Manila, Philippines THAILAND Promoting Renewable Energy, Clean Fuels, and Energy Efficiency in the Greater Mekong Subregion, Thailand GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Rojana, Thailand Rojana Power Co Ltd Gross Electrical Capacity: 289 MWel Extension Phase 5: EPC-Contract overview, Lender’s Due Diligence Report including review of the Plant Design and the Performance Guarantees and Testing provisions 2010-2011 Gas Turbines: x GE LM 6000 PC Air inlet Chillers: °C HRSG: x Dual Pressure Steam Turbine: x Dual Pressure Process Steam: 15 bar, sat Cooling System: x Wet Cooling Tower Auxiliary Boiler 41 t/h, 15 bar After Extension Phase 5: Gross Electrical Capacity: 344 MWe Gas Turbine x GE LM 6000 PC Extension Phase (2007-09): Design review, site supervision, commissioning supervision Extension Phase (2005-06): Design review, site supervision, commissioning supervision Extension Phase (2001-03): Negotiation, design review, site supervision, commissioning supervision Plant: (1996-99): Review of EPC-proposal, assistance in contract preparation, design review and approval, site supervision of erection, commissioning and performance testing HRSG: x Dual Pressure Bangkok Metro, Thailand Metropolitan Rapid Transit Authority (MRTA), Bangkok Construction of a new underground metro system, length 20 km GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Design and construction supervision of civil works, E & M equipment design, interface co-ordination 1998-2005 Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Wind Data Analysis and Energy Generation Assessment Landville Energy Co., Ltd Technical assistance to Landville Energy Co., Ltd to assess the feasibility of the project Preparation of independent bankable wind resource assessment considering two onsite met masts; CFD flow modelling; layout optimisation and micro-siting for three lots, site classification and recommendation of suitable wind turbine equipment 2015 Restructuring and Divestiture Strategy for Electricity's Gencos, Vietnam Vietnam Electricity Development of a comprehensive strategy for completing the de-integration of generation through operational and financial restructuring of the Gencos and to divest its assets/share ownership in these companies Market assessment of GENCOs (legal, regulatory, policy) Governance assessment (management and legal) Organisational review Financial assessment Operational and technical assessment Preparation and implementation of capacity building program Development of capital investment program specifically for IPPs and BOTs 2014-2015 Improvement of Energy Efficiency in Rural Areas Project, Vietnam Vietnam Electricity (EVN) Rehabilitate and upgrade of the medium voltage, low voltage distribution networks in areas of Northern, Centre and Southern Power Corporation Review/ Verification of Bid Evaluation Reports; Assistance in Contract Negotiations; Review/ Verification of Contracts; Review of Test Reports of Material and Equipment; Attendance at Quality Tests (FAT); Check of Civil Works and Installation; Final Acceptance of Civil Works and Installation; Prevention and Mitigation Measures for the Environmental Impact; Review of Implementation Progress; Reporting 2012-2015 VIETNAM Assistance to EVN/PCs to ensure that the tender procedures for equipment and civil works and the award of contracts are in line with the Banks guidelines GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Feasibility Study Wind Energy on Phu Quoc Island Kein Giang, Vietnam Electricity of Vietnam Power Company No Feasibility study seeking a possibility of building up wind farm(s) in the Island between 2005 and 2010 Main data:2 existing Diesel power stations: MW (total installed capacity) Additional DO/HFO fired generation (end 2005): MW Existing distribution network:: OH; 22kV (MV); 0.4kV (LV) Forecasted total demand by the end of 2010: 50 MW Wind Resource Assessment (Identification of the five most promising locations), site selection, wind park concept and basic calculation of specific electricity generation Phase II: Conceptual design: Power demand analysis, electrical grid qualitative analysis, optimization of the wind park layout, EIA and resettlement plan, economic and financial analysis and implementation plan, training and capacity building 2005-2007 500 kV Transmission Line Pleiku-Phu Lam, Vietnam Electricity of Vietnam, Central Vietnam Power Projects Management Board 540 km of 500 kV transmission line, extension of two 500 kV substations, 500 kV series capacitor compensation, 500 kV shunt parallel compensation, power line carrier and fibre optical communication Study, review of design, preparation of tender documents, bid evaluation, factory acceptance tests, supervision of construction and commissioning, training 2000-2004 Technical Advisory Services Independent bankable wind study and AEP assessment 2014 SOUTH KOREA (Wind) Hasari (Baeksu) Yeonggwang Wind Farm, Baeksu Wind South Korea Power CO GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Feasibility Study Support for Boseong 20MW Wind Farm Korea Engineering Consultants Co., Ltd Feasibility Study Support 2014 Goseong Alps Wind Farm Goseong Alps WP RfP preparation and tendering support for WTG Technical Advisory Services for Hasari (Yaksu) Wind Farm Project, Korea Yeonggwang Yaksu Wind Power CO Technical Advisory Services Jeongamg Wind Farm, South Korea Korea Ratings, South Korea Wind resource assessment and energy yield estimation Daegwallyeong Wind Farm, South Korea Daegwallyeong Wind Power Co., Ltd., Korea Feasibility study Site Survey, Measurement Mast review, Energy Yield Estimates review: Review of wind resource assessment (wind data analysis and study based on existing onsite mast, uncertainties) Review of wind farm layout, energy calculations with losses and uncertainties; Grid Connection Concept review (internal cabling concept, grid integration concept), Civil Topics review (soil type, foundation type, access roads, transport and installation concept); Economic Analysis review Tendering services including the preparation of tender documents for international bidding of the Wind turbine lot, clarification with bidders, bid evaluation and support for contract negotiations with the preferred bidders Independent bankable wind study and AEP assessment, Technical due diligence, review of conceptual wind farm design and implementation and operation plans, review of Turbine Supply Agreement and O&M Agreement Site investigation; wind data evaluation; long-term correlation; wind field modelling advanced CFD; layout optimisation and micro-siting; Site investigation and description; data collection and review; wind resource assessment; wind farm layout; energy production calculation; civil engineering topics; estimation of project costs; financial analysis GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 10 of 17 2014-2015 2014-2015 2013 2013-2014 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Owners Engineering Services for the Chunbuk and Gangdong Wind Farms, Korea Daehan Green Energy, Korea Wind farm development 2013 Lenders Engineering Services for the 30 MW Gimnyung Wind Farm, Korea Korea Ratings, Korea Lender’s Technical Advisor for the project assessment Lenders Engineering Services for the 40 MW Jeong-am Wind Farm ,Korea Korea Ratings, Korea Lender’s Technical Advisor for the project assessment Hasari Wind Farm, South Korea Shinhan Bank, South Korea Lender's engineering services YeongYang Wind Farm, South Korea STX Energy Co., Ltd., South Korea Tendering Site Visit, Review of project data and documents, On-site measurement data evaluation and analysis, Long-term correlation, Bankable Wind Resource Assessment, Advanced CFD flow modelling, Layout optimisation and micrositing, Energy production estimate, Estimation of losses, Uncertainty assessment, Reporting Site Visit, Technical Due Diligence, Review of project data and documents, On-site measurement data analysis, Bankable Wind Resource Assessment, Advanced CFD flow modelling, Layout optimisation and micrositing, Reporting Site Visit, Technical Due Diligence, Review of project data and documents, On-site measurement data analysis, Bankable Wind Resource Assessment, Advanced CFD flow modelling, Layout optimisation and micrositing, Reporting Technical due diligence; cost estimate and financial model review; advisory for preparation of EPC and O&M agreements; assistance in elaboration of technical specifications; review of tender documents; contract negotiation support; construction monitoring; O&M monitoring (2 years); quarterly site inspections; reporting Preparation of tender documents; evaluation of the bids; assistance during contract negotiations GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 11 of 17 2013 2013 2012-2015 2012-2013 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Sumang Wind Farm, South Korea Doarm Engineering Co Ltd., South Korea Unison Corporation Ltd., South Korea Wind resource assessment; financial analysis Wind resource assessment; economic appraisal; financial analysis 2012 Wind resource assessment 2012 Preparation of Tender Documents for Wind Turbine Procurement STX Engergy Corporation Ltd., Korea Preparation of Tender Documents ShinChang Offshore Wind Farm, South Korea Doarm Engineering Co Ltd., South Korea Pre-feasibility study YeongYang Wind Farm Project, South Korea STX Energy Co., Ltd., South Korea Wind resource assessment; AEP estimate Site visit; basic document review; wind data evaluation; long-term correlation; wind flow modelling; site classification; layout optimisation and micro-siting; energy yield and efficiency calculation; estimation of losses; uncertainty and probability of exceedances Tendering services including the preparation of tender documents for international bidding of the Wind turbine lot, clarification with bidders, bid evaluation and support for contract negotiations with the preferred bidders Site visit; assessment of preferred offshore area; preliminary wind resource assessment based on onshore data; preliminary wind farm layout; determination of suitable wind turbine types Site visits; review of available data and documents in order to reach the project’s feasibility status; optimization of micrositing; assessment of different turbine types; hub height optimization; bankable wind resource assessment; estimation of CAPEX and OPEX; financial analysis UiRyeong Wind Farm, South Korea GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 12 of 17 2012-2014 2011 2011 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Goseong Wind Farm, South Korea NECO Natural Energy Company, Ltd., South Korea Wind resource assessment 2010-2011 Lecture at University, South Korea Technical Advisory Services, South Korea Jeju University, South Korea Giving lecture DMS Corporation, South Korea Technical Advisory Services for Detailed Design for WTG Type Certification, South Korea Doosan Heavy Industries & Construction, Korea Assessment of a design and engineering company for gearless permanent magnet synchronous generators Foundation and tower internal design Market Study, South Korea Hyosung Corporation, South Korea Detailed analysis of four wind energy design and engineering companies; detailed analysis of three wind turbine manufacturers; strategic advisory services Operation & Maintenance Service for Gangwon Wind Farm, South Korea Gangwon Wind Power Co., South Korea Project management; site management and supervision; HV electrical site supervision Review of available data and documents in order to reach the project’s feasibility status; Site visit; wind data evaluation; longterm correlation; wind flow modelling; site classification; energy yield and efficiency calculation; estimation of losses; uncertainty and probability of exceedances Subject of the lecture is knowledge transfer about WindPRO/WaSP Detailed assessment of design capability, track record and key references; review of design concept; contract review Pre-design of the foundation and tower; detailed execution design of the foundation and tower; data collection and conceptual design of the tower internal design Screening of and detailed analysis of wind energy design and engineering companies incl assessment of track record and experiences; evaluation of capabilities and strengths and weaknesses; assessment of wind turbine manufacturers incl Assessment of capabilities, strategy, turbine portfolio, track record; strategic advisory services Online review of operation data; review and verification of guaranteed performance and technical availability levels; review and approval of repair activities; technical assistance for claim management; annual technical inspections of each turbine; regular reporting; issuance of final certificate GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 13 of 17 2010 2009 2008 2008 2007-2012 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Technical Advisory Services for Taebaek Wind Farm Project, South Korea Daewoo Engineering & Construction Co., Ltd South Korea Feasibility study 2007-2008 Youngduk Lender's Engineer, South Korea Daesung Wind Farm, South Korea BNP Paribas, Singapore Lender's engineer Daeasung Co., South Korea Feasibility study for a wind farm project on Jeju island Wind Farm Chupungryung, South Korea Institute of Renewable Energy and Environment, South Korea Feasibility study Wind Farm Yanggu, South Korea Nordex Energy GmbH, Germany Assistance during preparation of bidding documents Site calibration; micro-siting and turbulence analysis; KLIMM wind map; supervision of AEP calculations; review of tender documents (micro-siting and WindPRO); site suitability assessment; site calibration Operation and maintenance supervision; operation monitoring Wind resource assessment; feasibility study for a selected site; conceptual wind farm planning (micro-siting); environmental impact assessment; grid integration concept; economic analysis; KLIMM calculation Site investigation; supervision of measurement campaign; KLIMM wind study; conceptual wind farm planning; wind farm layout; grid interconnection; internal cabling concept; site access; environmental impact analysis; financial analysis including CDMcomponent; preparation of feasibility study report Participation in public bidding opening session; participation in site visit; optimization of micrositing; recommendation for location for power curve performance verifications; evaluation of site conditions (slopes, surface roughness, minimum temperature); preparation of bidding documents GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 14 of 17 2006-2011 2006-2007 2006-2007 2006 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Wind Farms Sinan and Jeju, South Korea Dongkuk S&C, South Korea / Standard Chartered Bank, United Kingdom Onshore BOO wind farm planning and near shore-wind farm development 2005-2007 Hankyung Wind Farm Phase II, South Korea Korea Southern Power Corporation (KOSPO), South Korea / Korea Power Engineering Cooperation (KOPEC), South Korea Korea Renewable Energy Company (KORENCO), South Korea Independent technical advisor for tender preparation; assistance during bid evaluation; supervision of erection commissioning Data processing and analysis; feasibility study for the two selected sites; site identification; conceptual wind farm planning; KLIMM wind potential evaluation; environmental impact assessment; economic analysis; technical due diligence; site Inspection; preparation of wind prognosis for an near-shore off the south coast of Korea; estimation of energy output; financial assessment Wind potential analysis; review of micro-siting; annual energy production estimation; preparation of tender documents; assistance during bid evaluation; witness of commissioning test Wind potential evaluation and micro-siting; review of financial input parameters; measurement campaign; feasibility study; participation during turbine contract negotiations (technical / legal-optional); basic electrical design including specifications 2005-2006 KORENCO Wind Farm, South Korea Complete feasibility study to support the client during the design and implementation of a wind farm GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 15 of 17 2005-2007 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Wind Energy Market Study, South Korea Confidential Analysis of the fifteen largest wind turbine manufacturers; analysis of the world wind market 2005-2006 Gangwon Wind Farm, South Korea Unison Co., Ltd South Korea Wind farm development and project management Offshore Busan Wind Farm Project, South Korea Daewoo Engineering & Construction Co., Ltd South Korea Offshore wind farm development in South Korea Offshore technology (trends, costs, projects); technology analysis; evaluation of financial status and internationalisation strategies of the fifteen largest wind turbine manufacturers; institutional and regulatory framework (China and India); CDM-business opportunities; listing of cost for components and spare parts; operation and maintenance and installation costs; lessons learnt; assessment of wind energy value chain; SWOT-analysis; M&A-strategy evaluation; business model recommendation & definition of steps for implementation Overall project management; QSE coordination; complete detailed wind farm planning; supervision of construction and commissioning, taking-over certificates, operation and maintenance supervision; environmental impact study; aviation study, tendering of wind turbines and infrastructure lots; setting up financing structure and identification of investors Preparation of a wind prognosis for an offshore region located to 10 km off the coast in the site; estimation of energy output; financial assessment GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 16 of 17 2004-2008 2004 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and South Korea Name/Country Client/Financier Main Features Consultancy Services Year Wind Farm Development for Hyosung, South Korea Hyosung Corporation, South Korea Wind farm development and implementation in pre-selected sites 2003-2009 Wind Farm Yongdok, South Korea Unison Co., Ltd South Korea Feasibility study Wind Farm Gangwon, South Korea Unison Co., Ltd Korea / Gangwon Wind Power Co., South Korea Development of wind farm; project management Site identification and evaluation; wind resource assessment; feasibility study for a selected site; conceptual wind farm planning (micro-siting); environmental impact assessment; grid integration concept; economic analysis; KLIMM calculation; detailed turbulence and site suitability assessment Wind data analysis; wind farm planning; technical concept for grid integration; micro siting with WindPRO Wind data analysis; long-term correlation; wind farm planning; technical concept for grid integration; micro-siting with WindPRO; environmental impact assessment; economic analysis; BOO(T) scheme development; technical and financial advisory services until financial close Genting International, Malaysia Asia Asset Package: Combined Cycle Power Plant in Thailand, 700 MW Coal fired Steam Power Plant in Indonesia, 1230 MW Hydro Power Plants in the Philippines, 792 MW Technical and environmental due diligence for Edison Mission Energy Assets: Plant reviews (conditions, performance, capabilities and limitations) Plant incidents and impact on operation and maintenance Projection of capital and operating expenditures Input for financial model Review of fuel supply chain Environmental issues and impacts on the plants 2004 2001-2004 2000-2004 REGIONAL Various Thermal and Hydro Power Plants Asia, Australia Australia Asset Package: Combined Cycle Cogeneration Power Plant: 118 MW Gas turbine Power Plant : 300 MW GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx Page 17 of 17 ... since 2014 INDONESIA KfW KfW KfW GEV, Experience in Southeast Asia- Vietnam- SKorea_ last 10 years_ 2015. docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia,... contracts are in line with the Banks guidelines GEV, Experience in Southeast Asia- Vietnam- SKorea_ last 10 years_ 2015. docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia,... projects) 2014 -2015 GEV, Experience in Southeast Asia- Vietnam- SKorea_ last 10 years_ 2015. docx Page of 17 LIST OF PROJECTS Experience in Southeast Asia (Last Ten Years) Cambodia, Indonesia, Laos,

Ngày đăng: 15/10/2017, 08:47

Từ khóa liên quan

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan