JSA concrete works

9 421 3
JSA concrete works

Đang tải... (xem toàn văn)

Thông tin tài liệu

JOB SAFETY ANALYSIS Concrete Works WORK ACTIVITY: _ Each piece of equipment and crew are associated with known specific hazards that cause accidents to reoccur on one project after another DECC Sundararajan Evaluation Points 40-20High Risk Severity Factors 8: Fatality, Permanent Disability Probability Factors : Extremely High Abbreviation E.P :Evaluation Points –12 Medium Risk 6: Serious Injury (LD>30 days) : Highly Probable S : Severity Factor 11-5 Low Risk 4: Major Injury (30>LD>4 days) : Probable P : Probability Factor 2: Minor Injury (4>LD>1 day) : Rare T : Total Points 1: Negligible : Very Rare xxxx SITE 4-1 Negligible LD : Lost Workdays SUPERVISOR: _ LOCATION ; PERMIT #: Probability factors No Activity ( Job Steps ) Work permit from Client to be obtained Potential Hazard • Unauthorized commencement of works may result in exposing workers and or potential to harm or danger Who/ What Might Be Harmed Injury to IMCO Personnel and or client property Risk E.P SxP=T 2x3=6 Control/ Recovery Measures • Authorized PTW holder shall ensure obtaining and maintaining valid work permit • The worksite supervisor responsible for this activity has to check the PPE of his staff to ensure that all required items are available and properly used Target E.P SxP=T 2x1=2 Responsible/ Action By Site supervisor and Site Safety Officer No Activity ( Job Steps ) Potential Hazard Who/ What Might Be Harmed Risk E.P SxP=T • Delay to schedule Mobilization and demobilization • Physical injury from heavy equipment, heavy lifting, pinch point, slip, trips and fall hazards IMCO Personnel, property damage x = 16 Page of Control/ Recovery Measures • Inform all workers regarding permit condition before work starts • Worksite supervisor shall conduct toolbox talks about nature of works and associated potential hazards and their essential precautionary measure • Follow mobilization schedule and arrange the required documents to avoid any cause of delay • Before transporting the loads to the site, rest assure that the materials are secured and tight with nylon rope for the safe transporting • Ensure that a driver is having knowledge to the hazard while transporting the materials • The driver shall not have driving attitude while using the road • Driver is driving only in the minimum speed limit • Minimize work personnel in the vicinity of equipment • Provide ergonomic training, Target E.P SxP=T Responsible/ Action By Site In-charge 2x1=2 Site supervisor, drivers, banksman and safety officer No Activity ( Job Steps ) Potential Hazard Who/ What Might Be Harmed Risk E.P SxP=T Pre-task briefing toolbox talks IMCO Personnel • The work force does not understand the pre task briefing therefore does not understand the potential dangers and control measures to be implemented Some of the workers could be lacking PPE or using defective PPE 2x4=8 Set out boundary markers for the work site area • Heat stress to the labour working on this task x = 12 • Markers are not clearly visible creating a risk of IMCO personnel IMCO personnel Page of Control/ Recovery Measures institute good housekeeping procedure • Keep feet and hands clear of moving/suspended materials and equipment • Keep a tidy site • Ensure that the pre task briefing is given out in a language understood by the work force, have it translated • Ask question regarding the briefing to get feedback from the staff, this ensures full comprehension • Issue required appropriate PPE and replace PPE that has signs of defect • PPE must include both hearing protection as well as dust inhalation protection  Ensure that adequate shaded areas are provided  Provide proper ventilation and drink plenty of water even if you are not thirst  Wear loose fitting full length clothing that can breathe • Ensure that all markers and Target E.P SxP=T Responsible/ Action By 2x1=2 Site supervisor and Site Safety Officer 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, No Activity ( Job Steps ) Potential Hazard Who/ What Might Be Harmed Risk E.P SxP=T Unloading the ready mix concrete from truck and from concrete pumps Target E.P SxP=T signage are of a suitable height to be clearly seen and sufficient lighting is placed to identify the area at night others coming into the area Control/ Recovery Measures • Machine works too close to persons within the same working area IMCO personnel x = 12 • Machine strikes another vehicle or person in the vicinity IMCO personnel x = 12 • Machine creates an environmental hazard by fuel leakage during fuel transfer or by leakage due to mechanical defect IMCO personnel x = 12 Page of • Ensure that all equipment is having valid QP certificates to work in the vicinity • Make sure all operators know the safe limitations of their equipment • Assigned a competent banksman when equipment is moving at the working area • Ensure strict control measure to separate mechanical plant and enforce swing radius area as no go area for any person or vehicle in order to avoid collisions • Set control measure in place that all fuel transfers take place under strict guidelines Fuel is only transferred by purpose built fuel delivery tanker • Ensure all machines and equipments are in good condition • Regular preventive and corrective maintenance of equipment must be observed • Drip trays are used to prevent any spillage Make sure all vehicles are routinely inspected and maintained to reduce the risk of mechanical failure Responsible/ Action By workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer No Activity ( Job Steps ) Potential Hazard Who/ What Might Be Harmed Risk E.P SxP=T • Traffic congestion IMCO personnel x = 12 • Inhalation of harmful dust and fumes and skin contact IMCO personnel x = 16 Page of Control/ Recovery Measures • In the event that there is ground contamination ensure all contaminated ground is collected and placed into plastic bags, removed to a waste storage container until removed from site to a hazardous waste disposal site • Deploy equipment delivering materials in such manner that no congestion inside shall happen and no parking anytime in the work area • Use only designated roads for delivery of concrete • Ensure to wear suitable respiratory protective equipment such as a P, N or R 95 respirator when fumes from dust can’t be avoided • Remove person to fresh air If discomfort persists seek medical advice • Ensure to wear loose clothing in good condition with collars closed and cuffs buttoned at the wrist • In case of chemical contact, Remove chemical from skin with waterless hand cleaner • Housekeeping regimes to help keep site clear • Ensure sufficient space around work areas • Ensure there is good access for Target E.P SxP=T Responsible/ Action By 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer No Activity ( Job Steps ) Potential Hazard • Poor access to working area causing of slips, trips, falls and or other injuries • Penetration not cover that cause falling onto sharp object • Violent ejection of concrete from hose at first moment of delivery Who/ What Might Be Harmed Risk E.P SxP=T IMCO personnel or Client inspector x = 12 IMCO personnel or Client inspector x = 16 IMCO personnel x = 16 IMCO personnel x = 12 • Struck by concrete causing injuries or falls Page of Control/ Recovery Measures concrete personnel and equipment • Keep other people not directly involved with concrete pouring clear from area • Ensure that penetrations are secured, identified and covered • Give warning prior to starting or recommencing the pour • Check hoses for air sources, e.g.:  blockage  change in supply  poor mix or delays in the pour  Ensure delivery hose is not damaged prior to pour  Control T-bar at end of hose  Be aware of potential for blow back in the line  Ensure appropriate edge protection  Ensure connecting pipes are adequately secured  Ensure brackets are positioned close together to minimize excessive movement  Ensure that pipe's operating pressure is appropriate for diameter of pipe  Check pipe to ensure it is of correct thickness for operating pressure  Do not use damaged pipes  Provide support where a change in Target E.P SxP=T Responsible/ Action By 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer Site supervisor, workers and site safety officer 2x1=2 2x1=2 Site supervisor, workers and site safety officer No Activity ( Job Steps ) Potential Hazard Who/ What Might Be Harmed Risk E.P SxP=T Control/ Recovery Measures     IMCO personnel • Walking on the concrete foundation during the pour that causing slipping on wet ply or reinforcement • Sharp edges cause of cuts from reinforcement bar ends or tie wire • Noise from operating machinery causing to hearing loose x = 12    IMCO personnel x = 12   IMCO personnel    IMCO personnel and or damage to property x = 16   • Fumes from fuel used Page of direction or reducer occurs Do not walk backwards during delivery Ensure T-bar does not slip off end of hose Avoid getting feet caught in reinforcement Put caps on ends of exposed reinforcement bars Turn tie wires into reinforcement cages Use quieter or muffled equipment where practicable Provide adequate hearing protection suitable for the level of noise exposure Do not refuel when machine is in operation Ensure there is adequate ventilation when refueling and using the vibrator Wear appropriate PPE Provide rest times or alternate work rotation Avoid long periods of twisting, repetitive movements Provide job rotation where there are enough trained employees Ensure the concrete is not too dry when screeding and shoveling Target E.P SxP=T Responsible/ Action By 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer 2x1=2 Site supervisor, workers and site safety officer No Activity ( Job Steps ) Potential Hazard Who/ What Might Be Harmed for vibrator possible to IMCO personnel explosion and/or fire, burns, rashes or allergies Work during extreme weather/ climate conditions Work during sand • Sprain or strain cause of improper manual handling • Over exposure to heat • Equipment vehicle Risk E.P SxP=T Control/ Recovery Measures x = 12 Target E.P SxP=T Responsible/ Action By 2x1=2 Site supervisor, workers and site safety officer IMCO personnel can cause heat cramps, heat exhaustion or heat stroke x = 16 • Become acclimated to the heat gradually before working in hot temperatures for a long time; • Ensure 100% availability of cold water and always drink plenty of cool water; • Wear hats and sunglasses to help stay cool; • Take frequent breaks in a cool place, if possible; • Wear loose clothing that allows the skin to breathe, such as cotton; • Protect your skin from the sun Keep as much of it covered with clothing as possible Wearing long-sleeved shirts will help; • Field supervision/ HSE personnel shall closely monitor the condition of workers, intervene as the need arises 2x1=1 Site supervisor and safety Officer IMCO personnel x = 12 • Switch equipment / vehicles 2x1=1 Site supervisor and Page of No Activity ( Job Steps ) storm Potential Hazard collision Who/ What Might Be Harmed Risk E.P SxP=T and property damage • Poor visibility / dust IMCO personnel x = 12 • Persons run-over by moving vehicle/ equipment IMCO personnel x = 12 headlights and flashers on while in motion • Maintain all required lights, reflectors and accessories on equipment; • Keep your equipment a safe distance from the edge of embankment; • Speed must be effectively reduced or shall completely STOP when the situation calls for it • Personnel must keep away from vehicle path as much as possible • Ensure other workers are out of the way before starting the machine; • Keep reverse alarms operable and free of anything that will muffle the sound; PREPARED BY (HSE) Name Target E.P SxP=T Control/ Recovery Measures Responsible/ Action By safety Officer 2x1=1 Site supervisor and safety Officer 2x1=1 Site supervisor and safety Officer REVIEWED BY (QP) Name Signature - Signature - Date Date - Page of -

Ngày đăng: 25/08/2016, 21:43

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan