CONSTRUCTION METHOD STATEMENT FOR BORED PILE WORK EMPLOYER : PROJECTS MANAGEMENT UNIT NO. 2 (PMU 2) CONSULTANT: SMEC INTERNATIONAL PTY LTD. IN ASSOCIATION WITH APECO CONTRACTOR : : SONG HONG – TRI CO – THANH NAM JOINT OPERRATION
ROAD NETWORK IMPROVEMENT PROJECT NETWORK IMPROVEMENT PROGRAM Contract package NIP/CP-14A: rehabilitation of national highway no.39-2 Trieu duong – diem dien SECTION ------------------*****---------------------- CONSTRUCTION METHOD STATEMENT FOR BORED PILE WORK EMPLOYER : PROJECTS MANAGEMENT UNIT NO. 2 (PMU 2) CONSULTANT: SMEC INTERNATIONAL PTY LTD. IN ASSOCIATION WITH APECO CONTRACTOR : SONG HONG – TRI CO – THANH NAM JOINT OPERRATION ROAD NETWORK IMPROVEMENT PROJECT NETWORK IMPROVEMENT PROGRAM Contract package NIP/CP-8: rehabilitation of national highway no.39-2 TRIEU DUONG – DIEM DIEN SECTION ------------------*****---------------------- CONSTRUCTION METHOD STATEMENT FOR BORED PILE WORK EMPLOYER : PROJECTS MANAGEMENT UNIT NO. 2 (PMU 2) CONSULTANT: SMEC INTERNATIONAL PTY LTD. IN ASSOCIATION WITH APECO CONTRACTOR : : SONG HONG – TRI CO – THANH NAM JOINT OPERRATION For Contractor For Consultant FOR EMPLOYER Checked by Approved by Approved by Nguyen Van Thanh Date: Date: Date: NIP/CP14 A