Gói Seam sealing ppt

18 310 3
Gói Seam sealing ppt

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

SEAM SEALING PROCESS QUALITY DEPARTMENT SEAM SEALING PROCESS 1. Send the fabric to the • seal tape supplier for testing and suggesting • the appropriate seal tape 2. Make mock up 40cm x 40cm from actual fabric and stitch in plus shape ( + ) with actual seal tape MOCK UP TESTING 3. Send the mock up to its lab for testing, if ok approve & follow same condition for production If not ok , remake the mock up in the same manner as before but with revised machine settings. SAMPLE OF TEST REPORT TESTING PARAMETERS • THE BASELINE STANDARD IS 2000 mm water for 2 minutes • Then increase 1000 mm water for every 30 seconds • Keep increasing until you reach the breaking point. GO TO PRODUCTION 4. The approved seam sealing machine setting must be clear to the operator and technician. the parameters must be available at the machine. MACHINE SETTING STANDARD • SPEED OF THE MACHINE – 4 Meters/Minute • TEMPRATURE – 530 to 550 Degrees Celsius • HOT AIR PRESSURE – 1.1 to 1.3 kg/cm2 • ROLLER PRESSURE – 5 kg/cm2 • Generally this is the setting but it will be different for different fabrics and different machine brands. ADJUST THE MACHINE AS STANDARD 6. make sure the machine setting is as per the approved standard. WATER PROOFING TEST IN FACTORY 5. The output has to be tested atleast 2 times a day for water proofing ability of seal tape. while testing the pressure has to be 3 psi for 2 to 3 minutes. The record of test must be maintained & available at the machine. TESTING MACHINE [...]... PROCEDURE 7 Before starting seam sealing machine should be running idle for 5 minutes 8 After joining the panels QC must check the seam & cut thread clean so that all topstitch will be smooth ATTACH SEAM SEALING Operator has to be careful while doing seam sealing to avoid breaking or joints Do not use overlap seal tape more than once if there is a break if more than once the seam becomes thick and stiff... more than once if there is a break if more than once the seam becomes thick and stiff CONTROL PROCEDURE 9 After attach seam sealing tape QC check 100% all seams No puckering, must be smooth No open seam No run off seal tape SEAM APPREARANCE MUST BE AS SMOOTH AS POSSIBLE AFTER SEAM SEALING CONTROL PROCEDURE 10 Water pressure testing is mandatory at the first out put every day First 10 pcs of the day . After attach seam sealing tape QC check 100% all seams No puckering, must be smooth No open seam No run off seal tape SEAM APPREARANCE MUST BE AS SMOOTH AS POSSIBLE AFTER SEAM SEALING. CONTROL. starting seam sealing machine should be running idle for 5 minutes. 8. After joining the panels QC must check the seam & cut thread clean so that all topstitch will be smooth. ATTACH SEAM SEALING Operator. SEAM SEALING PROCESS QUALITY DEPARTMENT SEAM SEALING PROCESS 1. Send the fabric to the • seal tape supplier for testing

Ngày đăng: 30/07/2014, 13:20

Mục lục

  • SEAM SEALING PROCESS

  • Slide 2

  • MOCK UP TESTING

  • SAMPLE OF TEST REPORT

  • TESTING PARAMETERS

  • GO TO PRODUCTION

  • MACHINE SETTING STANDARD

  • ADJUST THE MACHINE AS STANDARD

  • WATER PROOFING TEST IN FACTORY

  • TESTING MACHINE

  • WORKING PROCEDURE

  • ATTACH SEAM SEALING

  • CONTROL PROCEDURE

  • SEAM APPREARANCE MUST BE AS SMOOTH AS POSSIBLE AFTER SEAM SEALING.

  • Slide 15

  • SEAL TAPE SPECIFICATIONS

  • COMMONLY USED SEAL TAPE

  • SEAL TAPE STORAGE

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan