0
  1. Trang chủ >
  2. Kinh Tế - Quản Lý >
  3. Quản lý dự án >

Project Planning and Control Part 9

Project Planning and Control Part 9

Project Planning and Control Part 9

... Summary table348MS Project 98 3 49 Figure 31.10Figure 31.11 Project Planning and Control which shows the status of the project can be obtained from View – Table –Summary and is shown in Figure ... projectsvary enormously in scope, size and complexity. Project Planning and Control The sequences and techniques given may therefore have to be changed to suitany particular project. Indeed certain techniques ... (budget, planned, actual, value, anticipated final)357 Project Planning and Control 340Figure 31.1Figure 31.2 Project Planning and Control Table 32.1 ContinuedDraw time/% curves (% planned,...
  • 24
  • 352
  • 0
Project Planning and Control Part 10

Project Planning and Control Part 10

... Quality in Project Management, BSI ( 199 7)Burke, R., Project Management Planning & Control Techniques, 3rd edn,John Wiley ( 199 9)Burman, P.J., Precedence Networks for Project Planning and Control, McGraw-Hill ... Process for Capital Projects, Wiley( 199 3)Lester, A., Project Planning and Cost Control, ASM ( 198 8)Lester, A. and Benning, A., Procurement in the Process Industry, Butterworths( 198 9)Levine, Harvey, ... Management Handbook, McGraw-Hill( 199 3)Cleland, D.I. & Ireland, L.R., Project Management, 4th edn, McGraw-Hill(2002)Cleland, D.I. & Ireland, L.R., Project Manager’s Portable Handbook,McGraw...
  • 22
  • 426
  • 0
Tài liệu Project Planning and Control Part 1 pptx

Tài liệu Project Planning and Control Part 1 pptx

... 50%1 0 .99 0 0 .98 0 0 .96 2 0 .94 3 0 .92 6 0 .90 9 0. 895 0.877 0.870 0.862 0.847 0.833 0.820 0.806 0.800 0. 794 0.781 0.7 69 0.741 0.714 0. 690 0.6672 0 .98 0 0 .96 1 0 .92 5 0. 890 0.857 0.826 0. 797 0.7 69 0.756 ... 0. 296 4 0 .96 1 0 .92 4 0.855 0. 792 0.735 0.683 0.636 0. 592 0.572 0.552 0.516 0.482 0.451 0.423 0.410 0. 397 0.373 0.350 0.301 0.260 0.226 0. 198 5 0 .95 1 0 .90 6 0.822 0.747 0.681 0.621 0.567 0.5 19 0. 497 ... 0.314 0.2 79 0.2 49 0.222 0.210 0. 198 0.178 0.1 59 0.122 0. 095 0.074 0.0 59 8 0 .92 3 0.853 0.731 0.627 0.540 0.467 0.404 0.351 0.327 0.305 0.266 0.233 0.204 0.1 79 0.168 0.157 0.1 39 0.123 0. 091 0.068...
  • 63
  • 443
  • 1
Tài liệu Project Planning and Control Part 2 pptx

Tài liệu Project Planning and Control Part 2 pptx

... late as possible (Figures 11 .9 and 11.10). This avoidsunnecessary restraints and gives maximum float. 69 Figure 11.8Figure 11 .9 Figure 11.10 Project Planning and Control 4 Resist the temptation ... to be established and regularly monitored. Guidelines for qualitymanagement and quality assurance standards arepublished by BSI in the ISO 90 00, 90 01 and 90 04series of standards. ISO 10006 ... dates6.5 Milestones and milestone slip chart6.6 Bar chart and network if availableThe Who7 Project organization8 Project resource management 9 Project team organization 9. 1 Project staff directory43Basic...
  • 39
  • 503
  • 0
Tài liệu Project Planning and Control Part 3 pptx

Tài liệu Project Planning and Control Part 3 pptx

... is a1 09 Project Planning and Control Analysis and float calculation (see Chapter 15) is identical to the methodsemployed for arrow diagrams and, if the box is large enough, the earliest and latest ... GgAhEgEfGhAj21 9 151031837261624247275261441042 9 1210787628582464343653312340000000021 9 151031858112111 9 312712182311 36168141413 19 271120121721 19 23303024Duration in days28 29 432732363451333836533542563645604532 Project Planning and Control 100Figure 14.5illustrated ... dummies, an accurate prediction is obtainedimmediately and the float of any particular activity can be seen almost by 97 Project Planning and Control inspection. It will be noted that each activity...
  • 46
  • 464
  • 0
Tài liệu Project Planning and Control Part 4 pdf

Tài liệu Project Planning and Control Part 4 pdf

... 2 + 5 = 9 days. The remaining days can now only be savedby reducing the actual durations of some of the activities. This means more143Figure 18.8Figure 18 .9 Project Planning and Control resources ... programswere, therefore, limited by the storage and processing capacity of the computer as well asthe input and output facilities. Project Planning and Control In practice, this means that the start ... previous week numbers and insert the new ones, provided, of course, the148Figure 19. 1 WeeksFigure 19. 2Figure 19. 3Figure 19. 4Progress reportingnumbers are written in pencil and not ink. This...
  • 38
  • 549
  • 0
Tài liệu Project Planning and Control Part 5 ppt

Tài liệu Project Planning and Control Part 5 ppt

... Project Planning and Control movements and the crescendos of activities and combine these into aharmonious flow until the grand finale is reached.To facilitate ... a project manager to ensure that this faith exists. Where small cracks doappear in this vital bridge of understanding between the planning depart-ment and the operational departments, the project ... always be clarity and ease ofunderstanding. Complex networks only confuse clients, and reflect a lack ofappreciation of the advantages of method statements.177 Project Planning and Control Integrated...
  • 46
  • 508
  • 0
Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

... 4.47.812.2 19. 430.750316542780105715 89 190 3355258351320 95 0425250 395 212261 498 6100100100114011401140800100010001000508010058581010203204006408006080 90 410 590 1045210360480540407080545 91 41082360480840 96 07085 95 2623043351802102552858080 90 296 296 3222803203203605028 493 2 495 585.587.28764.482.2 91 .72 493 323840544544215027703535 394 57000Figure 27.4Cost control ... 4.47.812.2 19. 430.750316542780105715 89 190 3355258351320 95 0425250 395 212261 498 6100100100114011401140800100010001000508010058581010203204006408006080 90 410 590 1045210360480540407080545 91 41082360480840 96 07085 95 2623043351802102552858080 90 296 296 3222803203203605028 493 2 495 585.587.28764.482.2 91 .72 493 323840544544215027703535 394 57000Figure ... galleriesBLRECONDUCTVESSLGALLSDUCT111111240.00110.00180.00100.00850.00250.00240.00240.00110.00110.00180.00180.00100.00100.00850.00850.00250.00250.000.0055.000.0052.000.00257.000.00128.000.00651.000.001 69. 002401101801008502450000035555525225725712812865165117217201850580–770–280 199 078100100100100850 98 Figure 27.11 Project Planning and Control beginning...
  • 45
  • 409
  • 0
Tài liệu Project Planning and Control Part 7 pptx

Tài liệu Project Planning and Control Part 7 pptx

... 297 448 500Percentage complete 297 448 500530 530 530= 56% = 85% = 94 %Est. final man hours324 482 5250.56 0.85 0 .94 = 5 79 = 567 = 5 59 Efficiency 297 448 500324 482 525= 92 % = 93 % = 95 %A ... 297 482 84% 448 525 94 % 500 Project Planning and Control 2807 Enter these durations in the network programme.8 Carry out the network analysis, giving floats and the critical path (Table28 .9) . 9 ... top of vessel. Pumps have drain points.271Figure 28 .9 Project Planning and Control 9 Resource restraints require Sections A and B of suction and dischargeheaders to be erected in series.10 Suction...
  • 33
  • 475
  • 0
Tài liệu Project Planning and Control Part 8 pptx

Tài liệu Project Planning and Control Part 8 pptx

... % 91 88 90 90 Est. final manhours 1442 1 491 1458 1458SPI (cost) 0 .90 0.84 0 .93 0 .96 SPI (time) 0 .90 0.86 0 .92 0. 89 Est. completion day 33 36 32 31 Project Planning and Control 310Figure 29. 20 ... advertising/marketingInsuranceRe-engineeringContingencyFigure 29. 7Copyright © 199 6 WPMC Ltd. All rights reserved Project Planning and Control 300Figure 29. 8Figure 29. 9Example of integration of tools and techniquesof Table 29. 9 can be added. ... peak demand. This is shown in Figure 29. 17 by delaying the start ofactivities D and F.301Figure 29. 10Figure 29. 11 Project Planning and Control In Figure 29. 18, the man days of the unsmoothed...
  • 50
  • 435
  • 0

Xem thêm

Từ khóa: nature of management planning and control system relevant to strategic implementationexplain the nature of management planning and control systemthe nature of management planning and control system relevant to strategy implementationintroduction to project planning and management pptproject planning and management pdf notesproject planning and management lecture notes pdfBáo cáo thực tập tại nhà thuốc tại Thành phố Hồ Chí Minh năm 2018Báo cáo quy trình mua hàng CT CP Công Nghệ NPVchuyên đề điện xoay chiều theo dạngNghiên cứu tổ hợp chất chỉ điểm sinh học vWF, VCAM 1, MCP 1, d dimer trong chẩn đoán và tiên lượng nhồi máu não cấpMột số giải pháp nâng cao chất lượng streaming thích ứng video trên nền giao thức HTTPNghiên cứu vật liệu biến hóa (metamaterials) hấp thụ sóng điện tử ở vùng tần số THzBiện pháp quản lý hoạt động dạy hát xoan trong trường trung học cơ sở huyện lâm thao, phú thọGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitĐỒ ÁN NGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWANNGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWAN SLIDEQuản lý hoạt động học tập của học sinh theo hướng phát triển kỹ năng học tập hợp tác tại các trường phổ thông dân tộc bán trú huyện ba chẽ, tỉnh quảng ninhPhát triển du lịch bền vững trên cơ sở bảo vệ môi trường tự nhiên vịnh hạ longThiết kế và chế tạo mô hình biến tần (inverter) cho máy điều hòa không khíTổ chức và hoạt động của Phòng Tư pháp từ thực tiễn tỉnh Phú Thọ (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtHIỆU QUẢ CỦA MÔ HÌNH XỬ LÝ BÙN HOẠT TÍNH BẰNG KIỀMMÔN TRUYỀN THÔNG MARKETING TÍCH HỢPQUẢN LÝ VÀ TÁI CHẾ NHỰA Ở HOA KỲ