... methods of placing concrete. 304R-1 7MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE 5.2—PlanningA basic requirement in all concrete handling is that bothquality and uniformity of the concrete, ... 304R-1 5MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE Fig. 5.2(a) to (d)—Correct and incorrect methods of placing concrete. 304R-16ACI COMMITTEE REPORTFig. 5.2 (e) to (h)—Correct and incorrect ... uniformity and, perhaps, re-duced mixing time when confirmed by mixer performance 304R- 9MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE tests (U.S. Department of Commerce 1966, Gaynor and Mullarky...