0
  1. Trang chủ >
  2. Kỹ Thuật - Công Nghệ >
  3. Kĩ thuật Viễn thông >

Intro to Marine Engineering 2E Episode 1 ppsx

Intro to Marine Engineering 2E Episode 1 ppsx

Intro to Marine Engineering 2E Episode 1 ppsx

... Burlington, MA 018 03First published 19 83Reprinted 19 85Second edition 19 90Reprinted 19 92 ,19 93 ,19 94Revised 19 %Reprinted 19 98 (twice), 19 99,2000 (twice), 20 01, 2002,2003© 19 96, ... propellers 200 12 Steering gear 211 13 Fire fighting and safety 2 31 14 Electrical equipment 253 15 Instrumentation and control 279 16 Engineering materials 326 17 Watchkeeping ... FORWARDFigure 1. 4 Steam turbine 1 Main boiler2 FD fan3 Main feed pump4 Turbo-alternator7 SW-cooled evaporator 10 Hot water calorifier 11 FW pressure tank 12 Main turbines 13 Main...
  • 30
  • 300
  • 0
Intro to Marine Engineering 2E Episode 12 ppsx

Intro to Marine Engineering 2E Episode 12 ppsx

... in Figure 16 .1. If testingFractureStrainFigure 16 .1 Stress strain curve Engineering materials 3 31 burning process. The iron ore is reduced to iron and falls to the base ... small amounts to increase strength and resistance to fatigue. Tungsten added at between 12 and 18 %, together with up to 5% chromium, produces high speed steel..S32 Engineering ... the3 41 Chapter 17 Watchkeeping and equipmentoperation334 Engineering materialsm<f.53"0Ga$«Ma.TSi«M 1 W^III"*• 2sH i •§||la* ftS3 *2 tyI 1 ** 1 OS3•2*...
  • 30
  • 292
  • 0
Intro to Marine Engineering 2E Episode 2 pot

Intro to Marine Engineering 2E Episode 2 pot

... enginesFuelentryNonreturnvalveTiming/ valve To fuelvalveSlidingrodLeverCamFigure 2 .15 Timing valveThe fuel injectorA typical fuel injector is shown in Figure 2 ,16 , It can be seen to be twobasic ... points in the machinery space. A separate piston cooling system isused to limit any contamination from piston cooling glands to the pistoncooling system only.Sea water cooling systemThe ... delivered to the injector nozzle at very high pressure.When the edge of the helix at C uncovers the spill port D pressure is lostand fuel delivery to the injector stops....
  • 30
  • 219
  • 0
Intro to Marine Engineering 2E Episode 3 pptx

Intro to Marine Engineering 2E Episode 3 pptx

... provide one to two hours'notice to enable the turbines to be brought down to manoeuvringrevolutions. A diesel alternator will have to be started, the turbo-alternator shut ... provides steam to act on the dummy piston which is mounted on the turbine rotor (Figure3.7). The rotor casing provides the cylinder to enable the steam pressure to create an ... shown in Figure 3 .15 is madeup of a torque tube, membranes and adaptor plates. The torque tube fitsbetween the turbine rotor and the gearbox pinion. The adaptor platesare spigoted...
  • 30
  • 230
  • 0
Intro to Marine Engineering 2E Episode 4 pps

Intro to Marine Engineering 2E Episode 4 pps

... failure.Feed systems 10 1Economiser(Condenser} v,*Alr XandvapourRecirculatingline '"** ~1 -**--If-,".« 1 I*,jrBoiler^nh\F 1 71- AirejectorDrains <-<>wP«*surecooler ... use, e.g. the steam -to- steam generator, thedouble evaporation boiler and various exhaust gas boiler arrangements.The steam -to- steam generatorSteam -to- steam generators produce low-pressure ... present.Feed systems 10 3a drains cooler for the heating steam supplied to the generator. From thefeed heater, the feedwater passes into the steam -to- steam generator.Packaged feed...
  • 30
  • 270
  • 0
Intro to Marine Engineering 2E Episode 5 doc

Intro to Marine Engineering 2E Episode 5 doc

... firemain Carbon steel to BS36 01 — galvanisedBilge and ballast Carbon steel to BS36 01 - galvanisedControl air CopperStarting air Carbon steel to BS 3602Auxiliaries 13 7and without ... systemsHypochlorinatorFigure 6. 21 Domestic water treatmentCarbonDe-chlorinatorFreshwaterdrainPumps and pumping systems 11 5Pump typesThere are three main classes of pump in marine use: ... applied to ensure that complete sterilisationoccurs, 13 0 Pumps and pumping systemsExpandedbellowsA/tAAA/u1Figure 6 .18 Expansion bellows pieceabsorb vibration (Figure 6 .18 ). The...
  • 30
  • 222
  • 0
Intro to Marine Engineering 2E Episode 6 ppt

Intro to Marine Engineering 2E Episode 6 ppt

... pump 11 Sanitary pump 12 Accumulator 13 Control panel 14 Sullage tank 15 Overflow 16 Overboard discharge 17 Deck discharge to shore facility 18 External flushing water supply 19 ... 14 9Char EfinwMtorCharrad Paper Efcrinator.Rotating Rabbte ShaftCombustion Air MetLiquid Waste BurnerRabbte HadesContra) PanelSight GlassAsh HopperFigure 7 .11 IncineratorSolid ... Auxiliaries 14 1cooling water is shut off and the end covers removed. Any seepage intothe tubes will indicate the leak. It is also possible to introduce fluorescentdyes into the...
  • 30
  • 243
  • 0
Intro to Marine Engineering 2E Episode 8 docx

Intro to Marine Engineering 2E Episode 8 docx

... arranged to prevent the entry of sea water and also the loss oflubricating oil from the stern bearing. 11 12 13 14 15 IS 17 13 19 20 12 3 4S678&1Oai 22Figure 11 .7 Controllable 1 ... housing 10 Retracting plate 11 Piston 12 Bridge piece 13 Plunger 14 Spring 15 Case nuts and bolts 16 Shaft sleeve 17 Needle bearing 18 Roller journal 19 Oil seal20 Retaining plate 21 ... Valve rod 13 Main pump 14 Pinion 15 Internally toothed gear ring 16 Non-return valve 17 Sliding ring 18 Sliding thrust block 19 Corner pin20 Auxiliary servo motor 21 Pressure...
  • 30
  • 174
  • 0
Intro to Marine Engineering 2E Episode 9 pps

Intro to Marine Engineering 2E Episode 9 pps

... element (Figure 13 .3). Heat detectors are used in places suchas the galley and laundry where other types of detector would give offfalse alarms. 11 Figure 13 .3 Heat detectorAlarmAssociated ... stop valveDrain vvalve T Flushing 1 valveNon returnvalveStrainerfDeck mainstop valveFoamhydrantsSeawaterAutomaticinductorunitFireFoammakingsolutionFigure IS. 11 ... systemspaceFigure 13 .10 Automatic water spray systems, (a) sprinkler system; (b) sprayer systemThe complete installation is divided into several sections, each containingabout 15 0 to 200 sprinklers...
  • 30
  • 191
  • 0

Xem thêm

Từ khóa: listen to my heart korean drama episode 1listen to my heart korean drama episode 1 eng sublisten to my heart korean drama episode 1 synopsiswindows and how to work them phần 1cơ cấu tổ chức công ty tnhh 1 thành viênplaces to visit in rome in 1 dayBáo cáo quy trình mua hàng CT CP Công Nghệ NPVchuyên đề điện xoay chiều theo dạngNghiên cứu sự hình thành lớp bảo vệ và khả năng chống ăn mòn của thép bền thời tiết trong điều kiện khí hậu nhiệt đới việt namNghiên cứu tổ hợp chất chỉ điểm sinh học vWF, VCAM 1, MCP 1, d dimer trong chẩn đoán và tiên lượng nhồi máu não cấpđề thi thử THPTQG 2019 toán THPT chuyên thái bình lần 2 có lời giảiBiện pháp quản lý hoạt động dạy hát xoan trong trường trung học cơ sở huyện lâm thao, phú thọGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitNGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWAN SLIDEPhát triển mạng lưới kinh doanh nước sạch tại công ty TNHH một thành viên kinh doanh nước sạch quảng ninhTrả hồ sơ điều tra bổ sung đối với các tội xâm phạm sở hữu có tính chất chiếm đoạt theo pháp luật Tố tụng hình sự Việt Nam từ thực tiễn thành phố Hồ Chí Minh (Luận văn thạc sĩ)Nghiên cứu khả năng đo năng lượng điện bằng hệ thu thập dữ liệu 16 kênh DEWE 5000Định tội danh từ thực tiễn huyện Cần Giuộc, tỉnh Long An (Luận văn thạc sĩ)Thơ nôm tứ tuyệt trào phúng hồ xuân hươngQuản lý nợ xấu tại Agribank chi nhánh huyện Phù Yên, tỉnh Sơn La (Luận văn thạc sĩ)Tăng trưởng tín dụng hộ sản xuất nông nghiệp tại Ngân hàng Nông nghiệp và Phát triển nông thôn Việt Nam chi nhánh tỉnh Bắc Giang (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtTrách nhiệm của người sử dụng lao động đối với lao động nữ theo pháp luật lao động Việt Nam từ thực tiễn các khu công nghiệp tại thành phố Hồ Chí Minh (Luận văn thạc sĩ)