... Figure 14 -2. Hazard free for production facility. (Source: API RP14 .) Figure 14*4, Continued.410 Design of GAS-HANDLING Systems and Facilities (text continued from page 40 6) nal ... prior to a shut-in, and provide informa-398 Design of GAS-HANDLING Systems and Facilities evaluated for the third failure mode of this check valve. Check valves areeasy. A ... the design of the logicnecessary to carry out the functions that are to be performed when a sig-(text continued on page 41 0) 388 Design of GAS-HANDLING Systems and Facilities nating...
  • 25
  • 299
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

... Typically, high-speed compressors run at a speed of 900 toJ 20 0 rpm and slow-speed units at speeds of 20 0 to 600 rpm. 24 0 Design of GAS-HANDLING Systems and Facilities The regeneration ... 140°FReid Vapor Pressure3430 26 22 181410 25 !Grade 34 -25 Grade 30 -25 Grade 26 -25 Grade 22 -25 Grade 18 -25 Grade 14 -25 40iGrade 34-40Grade 30-40Grade 26 -40Grade 22 -40Grade 18-40Grade 14-4055iGrade ... propylene. 20 8*- 37* 2, 5—0.05mlpass ( 1) No. 1 123 pass_.TestMethodsASTMD -2 163- 82 ASTMD- 126 7- 84ASTMD- 18 37- 81ASTMD -2 163- 82 ASTM D -2 163- 82 ASTMD -2 158-80ASTM D -21 58-80ASTMD-...
  • 25
  • 459
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 6 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 6 docx

... 322 1.36 353 1.66 377 1.96 3981. 07 323 1. 37 353 1. 67 378 1. 97 3981.08 325 1.38 354 1.68 379 1.98 3991.09 326 1.39 355 1.69 379 1.99 4001.10 3 27 1.40 356 1 .70 ... 1 .70 380 2. 00 4001.11 328 1.41 3 57 1 .71 381 —1. 12 329 1. 42 358 1. 72 3 82 —1.13 330 1.43 359 1 .73 3 82 —1.14 331 1.44 360 1 .74 3831.15 3 32 1.45 360 1 .75 3841.16 ... 13-3Standard Orifice Areas and DesignationsOrificeDEFGHJ K LMNPQRTAreain. 2 0.1100.1960.3 07 0.5030 .78 51 .28 7 1.838 2. 8533.604.346.3811.0516.0 26 .0380 Design of GAS-HANDLING ...
  • 25
  • 289
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 8 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 8 docx

... (Courtesy of Jenkins Bros .) 430 Design of GAS-HANDLING Systems and Facilities Table 15 -2 (Continued)Example Specifications of Pipe, Valves, and FittingsCouplings1 -in. and smaller ... HighTemperature Safety LowNone(table continued on next page) 422 Design of GAS-HANDLING Systems and Facilities form their work safely and to be aware of environmental considerations.Training ... Ib ANSI CS RF Etc.flanged, standard trim,hand wheel or lever operated418 Design of GAS-HANDLING Systems and Facilities (text continued from page 41 0) HAZARDS ANALYSISA hazards...
  • 25
  • 252
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 13 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 13 docx

... determining, 27 2 - 27 6 packing lubrication system, 316ratio, overall, 25 3 packing, 29 8-300specifying, 27 0 - 27 2 pipe sizing, 3 17- 319stages, determining, 27 2 - 27 6 pipeline booster use, 26 2use, ... aspirated, 475 blocked, 356 compression, 470 ,4 72 check valves, 28 4 cylinder, 470 , 475 coolers, 28 0, 28 5 diesel, 477 shut-down valves, discharge check, 27 9, environment and, 4 87- 4 92 284 ... positive-displacement, 25 5bearings, 29 6 -29 8 reciprocating, 3, 25 5 -26 4 ,28 6- 326 booster, 25 4, 27 6, 28 6 high-speed, 25 8 -25 9capacity control devices, 3 02 low-speed, 25 9 -26 4casinghead gas, 25 4 process...
  • 25
  • 372
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 7 ppsx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 7 ppsx

... I, and computing:1 42 Design of GAS-HANDLING Systems and Facilities is controlled by ( 1) perforations in the tray deck (sieve trays), ( 2) bubblecaps (bubble cap trays), or ( 3) ... rescuedpromptly and given artificialresuscitation.*Based on 1% hydrogen sulfide = 629 .77 gr/100 scfat 14.696 psia and 59°F, or 101, 325 kPa and 75 °C.156 Design of GAS-HANDLING ... ele-ments of structured packing are placed. Beds of structured packing typi-cally have lower pressure drops than beds of random packing of compa-rable mass transfer efficiency. Structured...
  • 25
  • 391
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

... GasVaporRecoveryFlowRateMMscfd100105 20 100 2 240.11.0 2. 0R 2. 0 2. 0 2. 7 2, 7 2. 7 2. 0 2. 0 2. 04.03.03.0n1!33.31 2 21 2 2Approx.bhp4,4004409803, 920 19,6 02 881903809143 28 6MostLikelyCentrifugalHigh SpeedHigh ... isreached at the exit of a compressor wheel. When this point is reached,flow through the compressor cannot be increased even with further 27 2 Design of GAS-HANDLING Systems and Facilities Figure ... series of rotating impellers to impart velocity 27 0 Design of GAS-HANDLING Systems and Facilities efficiently. This fuel penalty can be overcome if process heat is needed.Waste...
  • 25
  • 351
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

... Design of GAS-HANDLING Systems and Facilities tlon and discharge valves so that the valves can be removed and rein-stalled.These clearances are called fixed clearances and ... contains the rotatingparts and on which the cylinders and crossheads are mounted. (Courtesy of Dresser-Rand Company .) 310 Design of GAS-HANDLING Systems and Facilities Compressor ... 28 8 Design of GAS-HANDLING Systems and Facilities facturers for a maximum continuous horsepower, speed (rpm), and rodload. The rated horsepower is determined by the...
  • 25
  • 332
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

... 7, 50016,30018,800 17, 700 17, 700 17, 40016,300 17, 50016,300 17, 50011 ,20 0— 12, 30010 ,20 018,300 20 ,000 21 70 0 23 ,30015,00016 ,70 018,1001 6,90018,30018,300 20 ,000 20 ,000 20 ,000 20 ,000 23 ,300 21 ,70 0 25 ,000 25 ,000 25 ,000 25 .000 21 .70 0 23 ,300 21 ,70 0 23 ,300 20 ,00016 ,70 0 20 ,00016 ,70 0Wall ... 1.1Class1503004006009001500 25 00 ~20 °FtolOO° 28 5 74 09901480 22 20 370 56 170 MAWP, psigF 100°Fto200°F 25 0 675 9001350 20 253 375 5 625 Mechanical Design of Pressure Vessels 335Figure 12- 2. Internal ... 6,90018,30018,300 20 ,000 20 ,000 20 ,000 20 ,000 23 ,300 21 ,70 0 25 ,000 25 ,000 25 ,000 25 .000 21 .70 0 23 ,300 21 ,70 0 23 ,300 20 ,00016 ,70 0 20 ,00016 ,70 0Wall thickness 2: 1 ellipsoidal headsWall thickness—hemispherical heads 328 Design of GAS-HANDLING Systems and Facilities familiar...
  • 25
  • 417
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

... in( 2) ( 17, 50 0) (0.8 5) - (0. 2) ( 12 5) Required thickness = 0.505 + 0 .25 0 = 0 .75 5 in.Use—-in. head (0.8 12 5) W = (0.3 4)( 0.8 12 5)( 12 0) 2 + (1. 9)( 0.8 12 5)( 12 0) = 4,1631b(c) Cone:_ ... head(a) Skirt:I-°^d + 2 j_j — " r jL 12 _ (0 .2 5) ( 12 0) | 12 = 4.50 ftW = (1 1) ( 12 0) (0. 5) (4. 5) = 2, 970 Ib(b )^ ELn!aiy: Shdl 12 < 870 Head 4,163Head 4,163Skirt ... Examined Examined31.00 0.85 0 .70 0.90 0.80 0.65— 0.60— — 0.55on page)3 52 Design of GAS-HANDLING Systems and Facilities (b)Head:( 12 5) ( 12 0) |- == , _ ,— = y 505 in( 2) ...
  • 25
  • 452
  • 0

Xem thêm

Từ khóa: performance evaluation of computer systems and networksverilog hdl a guide to digital design and synthesis 2nd edexplain the purpose of agreeing objectives and deadlines when researching information 2 1complete idiots guide to grammar and style 2nd ed 2003 pdfdata mining concepts and techniques 2nd ed pdf downloaddesign and development of aircraft systemsNghiên cứu tổ hợp chất chỉ điểm sinh học vWF, VCAM 1, MCP 1, d dimer trong chẩn đoán và tiên lượng nhồi máu não cấpNghiên cứu tổ chức chạy tàu hàng cố định theo thời gian trên đường sắt việt namđề thi thử THPTQG 2019 toán THPT chuyên thái bình lần 2 có lời giảiBiện pháp quản lý hoạt động dạy hát xoan trong trường trung học cơ sở huyện lâm thao, phú thọGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitĐỒ ÁN NGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWANQuản lý hoạt động học tập của học sinh theo hướng phát triển kỹ năng học tập hợp tác tại các trường phổ thông dân tộc bán trú huyện ba chẽ, tỉnh quảng ninhPhối hợp giữa phòng văn hóa và thông tin với phòng giáo dục và đào tạo trong việc tuyên truyền, giáo dục, vận động xây dựng nông thôn mới huyện thanh thủy, tỉnh phú thọPhát triển du lịch bền vững trên cơ sở bảo vệ môi trường tự nhiên vịnh hạ longTranh tụng tại phiên tòa hình sự sơ thẩm theo pháp luật tố tụng hình sự Việt Nam từ thực tiễn xét xử của các Tòa án quân sự Quân khu (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtNguyên tắc phân hóa trách nhiệm hình sự đối với người dưới 18 tuổi phạm tội trong pháp luật hình sự Việt Nam (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtHIỆU QUẢ CỦA MÔ HÌNH XỬ LÝ BÙN HOẠT TÍNH BẰNG KIỀMMÔN TRUYỀN THÔNG MARKETING TÍCH HỢP