... 388 —1 .22 339 1. 52 366 1. 82 389 — —1 .23 340 1.53 367 1.83 389 — —•1 .24 341 1.54 368 1.84 390 —1 .25 3 42 1.55 369 1.85 391 — —1 . 26 343 1. 56 369 1. 86 391 —1 .27 344 ... 13-3Standard Orifice Areas and DesignationsOrificeDEFGHJ K LMNPQRTAreain. 2 0.1100.1 96 0.3070.5030.7851 .28 71.838 2. 8533 .60 4.34 6. 3811.05 16. 0 26 .0380 Design of GAS-HANDLING ... 3971. 06 322 1. 36 353 1 .66 377 1. 96 3981.07 323 1.37 353 1 .67 378 1.97 3981.08 325 1.38 354 1 .68 379 1.98 3991.09 3 26 1.39 355 1 .69 379 1.99 4001.10 327 1.40 3 56 ...
  • 25
  • 289
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

... 140°FReid Vapor Pressure3430 26 22 181410 25 !Grade 34 -25 Grade 30 -25 Grade 26 -25 Grade 22 -25 Grade 18 -25 Grade 14 -25 40iGrade 34-40Grade 30-40Grade 26 -40Grade 22 -40Grade 18-40Grade 14-4055iGrade ... Typically, high-speed compressors run at a speed of 900 toJ 20 0 rpm and slow-speed units at speeds of 20 0 to 60 0 rpm. 24 0 Design of GAS-HANDLING Systems and Facilities The regeneration ... propylene. 20 8*-37* 2, 5—0.05mlpass ( 1) No. 1 123 pass_.TestMethodsASTMD -2 163 - 82 ASTMD- 1 26 7-84ASTMD- 1837-81ASTMD -2 163 - 82 ASTM D -2 163 - 82 ASTMD -2 158-80ASTM D -21 58-80ASTMD-...
  • 25
  • 459
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 7 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 7 docx

... Figure 14 -2. Hazard free for production facility. (Source: API RP14 .) Figure 14*4, Continued.410 Design of GAS-HANDLING Systems and Facilities (text continued from page 40 6) nal ... 14.5.{figure continued on pugf)3 96 Design of GAS-HANDLING Systems and Facilities detectors and manual shutdown stations to provide adequate warning and to keep a small fire ... the design of the logicnecessary to carry out the functions that are to be performed when a sig-(text continued on page 41 0) 388 Design of GAS-HANDLING Systems and Facilities nating...
  • 25
  • 299
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 8 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 8 docx

... (Courtesy of Jenkins Bros .) 430 Design of GAS-HANDLING Systems and Facilities Table 15 -2 (Continued)Example Specifications of Pipe, Valves, and FittingsCouplings1 -in. and smaller ... ofXomox Corp .) 4 26 Design of GAS-HANDLING Systems and Facilities 5. Welding certification and inspection requirements. 6, Design details (if not already included in drawings). For ... HighTemperature Safety LowNone(table continued on next page) 422 Design of GAS-HANDLING Systems and Facilities form their work safely and to be aware of environmental considerations.Training...
  • 25
  • 252
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 13 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 13 docx

... positive-displacement, 25 5bearings, 29 6 -29 8 reciprocating, 3, 25 5 - 26 4 ,28 6- 3 26 booster, 25 4, 27 6, 28 6 high-speed, 25 8 -25 9capacity control devices, 3 02 low-speed, 25 9 - 26 4casinghead gas, 25 4 process ... considerations, 27 6 -28 0centrifugal, 3, 26 7 -27 0, 28 6 rod, 29 4, 310-311centr i fugal proces s considerations, rotary ,3 ,25 5 28 1 -28 5 screw, 25 5, 26 6 - 26 7centrifugal, stonewalling, 28 0 -28 1 ... determining, 27 2 -27 6 packing lubrication system, 3 16 ratio, overall, 25 3 packing, 29 8-300specifying, 27 0 -27 2 pipe sizing, 317-319stages, determining, 27 2 -27 6 pipeline booster use, 26 2use,...
  • 25
  • 372
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 6 potx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 6 potx

... 9,050 2 1A 0.750 10, 720 12, 490 2 1A 0.875 12, 530 14 ,60 03Std 0 .21 6 2, 260 —3XS 0.300 3 ,20 0 —3XXS 0 .60 0 6, 820 7,9404Std 0 .23 7 1, 920 —4XS 0.337 2, 770 —4XXS 0 .67 4 5, 860 6, 8306Std ... 2O-0''8 -2- XH8-y'XXH8 -2& quot;XH8 -2& quot;XXHTO-r'XHio-r'xxM 6- 3"XH 6- 3"XXH 2- 2"XH 12- r'XXHWXH8.3-XXH14-r'XH14-T'XXH1O-3"XH1O-3"XXH1« -2& quot;XHie -2- xxn10-3"XM10-3"XXH344073403440734034407340 320 0 6 820 34407340 320 0 6 820 34407340 320 0 68 *034407340 320 0 6 820 29 -S 26 .5 42. 6 38.3 64 .4580594S3.B93.485.9948BS934.0 20 .54S.O31.47B.7580 66 .950.4S454 76 76 11411470.970.9 166 166 J13 .2 11X2 23 7 23 7173.1173.1311311198.1198.1 2. 9 2. 9 6. 0 6. 010.S10.510.310.317.917.917.517.8 28 .7 28 .7 28 .0 28 .051.851.851 .2 SI. 2 1.4001 .61 0 2, 210 2. 510 2. 87S3.32S3,0303 .61 64. 060 4, 725 4.3905,3355 ,65 0 6. 60O 6 .23 S7*7810,11011. 360 10,580 12. 240NOMINAL DIMENSIONAL ... 2O-0''8 -2- XH8-y'XXH8 -2& quot;XH8 -2& quot;XXHTO-r'XHio-r'xxM 6- 3"XH 6- 3"XXH 2- 2"XH 12- r'XXHWXH8.3-XXH14-r'XH14-T'XXH1O-3"XH1O-3"XXH1« -2& quot;XHie -2- xxn10-3"XM10-3"XXH344073403440734034407340 320 0 6 820 34407340 320 0 6 820 34407340 320 0 68 *034407340 320 0 6 820 29 -S 26 .5 42. 6 38.3 64 .4580594S3.B93.485.9948BS934.0 20 .54S.O31.47B.7580 66 .950.4S454 76 76 11411470.970.9 166 166 J13 .2 11X2 23 7 23 7173.1173.1311311198.1198.1 2. 9 2. 9 6. 0 6. 010.S10.510.310.317.917.917.517.8 28 .7 28 .7 28 .0 28 .051.851.851 .2 SI....
  • 25
  • 473
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

... GasVaporRecoveryFlowRateMMscfd100105 20 100 2 240.11.0 2. 0R 2. 0 2. 0 2. 7 2, 7 2. 7 2. 0 2. 0 2. 04.03.03.0n1!33.31 2 21 2 2Approx.bhp4,4004409803, 920 19 ,6 02 881903809143 28 6 MostLikelyCentrifugalHigh SpeedHigh ... service. 26 2 Design of GAS-HANDLING Systems and Facilities Figure 10-5. Integral engine compressor. (Courtesy of Cooper Industries EnergyServices Group .) sidered low-speed units. ... theincreased efficiency of compression. 28 2 Design of GAS-HANDLING Systems and Facilities Figure 10-15. Graphic illustration of a "stonewall/' or a choked flow condition.«If...
  • 25
  • 351
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

... Design of GAS-HANDLING Systems and Facilities tlon and discharge valves so that the valves can be removed and rein-stalled.These clearances are called fixed clearances and ... contains the rotatingparts and on which the cylinders and crossheads are mounted. (Courtesy of Dresser-Rand Company .) 310 Design of GAS-HANDLING Systems and Facilities Compressor ... 28 8 Design of GAS-HANDLING Systems and Facilities facturers for a maximum continuous horsepower, speed (rpm), and rodload. The rated horsepower is determined by the...
  • 25
  • 332
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

... 7,500 16, 30018,80017,70017,70017,400 16, 30017,500 16, 30017,50011 ,20 0— 12, 30010 ,20 018,300 20 ,000 21 700 23 ,30015,000 16, 70018,1001 6, 90018,30018,300 20 ,000 20 ,000 20 ,000 20 ,000 23 ,300 21 ,700 25 ,000 25 ,000 25 ,000 25 .000 21 .700 23 ,300 21 ,700 23 ,300 20 ,000 16, 700 20 ,000 16, 700Wall ... 1.1Class150300400 60 09001500 25 00 ~20 °FtolOO° 28 57409901480 22 203705 61 70MAWP, psigF 100°Fto200°F 25 0 67 59001350 20 2533755 62 5 Mechanical Design of Pressure Vessels 335Figure 12- 2. Internal ... cl.lGrade 2, cl .2 Grade 1 .2, cl .2 Grade 11, cl .2 Grade 22 , cl .2 Grade 21 , cl .2 Grade 5, cl .2 SA -20 3 Grade AGrade BGrade DGrade ESA -24 0 Grade 304Grade 304LGrade 3 16 Grade316LASME...
  • 25
  • 417
  • 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

... (17,50 0) (0.8 5) - (0. 2) ( 12 5) Required thickness = 0.505 + 0 .25 0 = 0.755 in.Use—-in. head (0.8 12 5) W = (0.3 4)( 0.8 12 5)( 12 0) 2 + (1. 9)( 0.8 12 5)( 12 0) = 4, 163 1b(c) Cone:_ Pd~ 2 ... Examined Examined31.00 0.85 0.700.90 0.80 0 .65 — 0 .60 — — 0.55on page)3 52 Design of GAS-HANDLING Systems and Facilities (b)Head:( 12 5) ( 12 0) |- == , _ ,— = y 505 in( 2) ... head(a) Skirt:I-°^d + 2 j_j — " r jL 12 _ (0 .2 5) ( 12 0) | 12 = 4.50 ftW = (1 1) ( 12 0) (0. 5) (4. 5) = 2, 970 Ib(b )^ ELn!aiy: Shdl 12 <870Head 4, 163 Head 4, 163 Skirt...
  • 25
  • 452
  • 0

Xem thêm

Từ khóa: the design of water transport and distribution systemsthermodynamics dynamic equilibrium and implications for the design of control systemsa flow chart summary of the itraq™ experiment design of 4 plex and 8 plex systems 63design of control systemsperformance evaluation of computer systems and networksdesign of control systems for dc drives pdfdesign of control systems pptdesign of control systems using matlabdesign of control systems for a quadrotordesign of control systems pdfdesign of control systems in state spacedesign of control systems for dc drivesuse of telemedicine systems and devices for patient monitoringgrounding of electrical systems and equipmentk article xx of gatt 1994 and human rights conclusionNghiên cứu sự hình thành lớp bảo vệ và khả năng chống ăn mòn của thép bền thời tiết trong điều kiện khí hậu nhiệt đới việt namNghiên cứu tổ chức pha chế, đánh giá chất lượng thuốc tiêm truyền trong điều kiện dã ngoạiNghiên cứu tổ hợp chất chỉ điểm sinh học vWF, VCAM 1, MCP 1, d dimer trong chẩn đoán và tiên lượng nhồi máu não cấpNghiên cứu vật liệu biến hóa (metamaterials) hấp thụ sóng điện tử ở vùng tần số THzGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitPhối hợp giữa phòng văn hóa và thông tin với phòng giáo dục và đào tạo trong việc tuyên truyền, giáo dục, vận động xây dựng nông thôn mới huyện thanh thủy, tỉnh phú thọPhát hiện xâm nhập dựa trên thuật toán k meansNghiên cứu, xây dựng phần mềm smartscan và ứng dụng trong bảo vệ mạng máy tính chuyên dùngNghiên cứu tổng hợp các oxit hỗn hợp kích thƣớc nanomet ce 0 75 zr0 25o2 , ce 0 5 zr0 5o2 và khảo sát hoạt tính quang xúc tác của chúngThơ nôm tứ tuyệt trào phúng hồ xuân hươngThiết kế và chế tạo mô hình biến tần (inverter) cho máy điều hòa không khíSở hữu ruộng đất và kinh tế nông nghiệp châu ôn (lạng sơn) nửa đầu thế kỷ XIXChuong 2 nhận dạng rui roTổ chức và hoạt động của Phòng Tư pháp từ thực tiễn tỉnh Phú Thọ (Luận văn thạc sĩ)Kiểm sát việc giải quyết tố giác, tin báo về tội phạm và kiến nghị khởi tố theo pháp luật tố tụng hình sự Việt Nam từ thực tiễn tỉnh Bình Định (Luận văn thạc sĩ)Tăng trưởng tín dụng hộ sản xuất nông nghiệp tại Ngân hàng Nông nghiệp và Phát triển nông thôn Việt Nam chi nhánh tỉnh Bắc Giang (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtTrách nhiệm của người sử dụng lao động đối với lao động nữ theo pháp luật lao động Việt Nam từ thực tiễn các khu công nghiệp tại thành phố Hồ Chí Minh (Luận văn thạc sĩ)BÀI HOÀN CHỈNH TỔNG QUAN VỀ MẠNG XÃ HỘIMÔN TRUYỀN THÔNG MARKETING TÍCH HỢP