rags to riches tv show episode 1

Báo cáo khoa học: "From RAGS to RICHES: exploiting the potential of a flexible generation architecture" pot

Báo cáo khoa học: "From RAGS to RICHES: exploiting the potential of a flexible generation architecture" pot

Ngày tải lên : 31/03/2014, 04:20
... two to three minutes so that the drops run to the back. Replace the top on the bottle Generated by RICHES version 1. 0 (9/5/20 01) on 9/5/20 01 â20 01, ITRI, University of Brighton Figure 1: An ... added to it from the semantic proposition object (see Figure 4). el (1) el(2) (motivation) el (1) el(2) refers to refers to el (1) el(2) el(3) “patient’s nose is clear” el el el (blow) el (1) el(2) “patient’s nose” (actor) “patient” Figure ... single task, needs to have access to at least rhetorical and document information as well as referencing and adding to the syntactic information. To accommodate this, the RAGS data model in- cludes...
  • 8
  • 368
  • 0
brice, r. (2003). newnes guide to digital tv (2nd ed.)

brice, r. (2003). newnes guide to digital tv (2nd ed.)

Ngày tải lên : 18/04/2014, 12:26
... warping 18 9 Rotorscoping 19 0 3D graphics and animation 19 1 Matrices 19 2 Imaging 19 4 Light 19 5 Ray tracing 19 7 Hard disk technology 19 8 Winchester hard disk drive technology 19 9 Preface to ... Posterize 17 1 Chroma-key 17 2 Off- line editing 17 4 Computer video standards 17 5 Vector and bitmap graphics ^ whats the difference? 17 7 Graphic file formats 17 8 Windows Bitmap (.BMP) 17 9 PCX 17 9 ... 17 9 TARGA 17 9 GIF 17 9 JPEG 18 0 Computer generated images (CGI) and animation 18 0 Types of animation 18 1 Software 18 2 2D systems 18 2 Paint-system functions 18 2 Compositing 18 8 Morphing...
  • 312
  • 633
  • 0
TPM Route to World Class Performance Episode 2 ppt

TPM Route to World Class Performance Episode 2 ppt

Ngày tải lên : 12/08/2014, 08:22
... 1. 15 3 .15 3 .15 10 5 12 6.5 - ~20% -~ 10 5* 10 0 205 f2.05 (D/A> - 1. 10 3 .15 11 0 (FxA: +56 - TPM-from total productive maintenance to total productive manufacturing 15 4 ... (D) Total cost (E) Unit cost D/A (F) Contribution (G) Unit sales price (H) Total contribution (I) Return on capital employed 11 0 11 0 10 0 11 0 210 220 f2 .10 f2.00 1. 05 1. 15 ... Achievement loo 1 16 0 1 65 1 88 1. 0 per $ 1. 0 per $ 3.0 4.5 Lighting systems 387 4 33 10 0 4 247 71 4 88 0.75 4 3.5 1 80 % Roll-out phase 3 3000 - 2000 - 10 00 - lo%...
  • 20
  • 329
  • 0
TPM Route to World Class Performance Episode 3 pps

TPM Route to World Class Performance Episode 3 pps

Ngày tải lên : 12/08/2014, 08:22
... Minor stoppages per month Reduction in product costs 71% 77% 387 45 1 16 hrs 4650 10 0 90% 90% 40 15 0 8 hrs 10 00 90 88% 92.5% 33 15 0 6 hrs 813 91. 5 The top-down ... I I I Pilotmhase I: I PilotPhase 11 : I PilotPhase 11 1: and improvement 1 initial priorities I implementation and Set out I Lead bottom up Define current status I I tactics ... losses’ to the surface for step-by-step elimination (Figure 1. 3). 24 TPM-A Route to World-Class Pevformance around 30 minor stops and 300 contributory factors (Figure 3 .1) . Breakdowns...
  • 20
  • 237
  • 0
TPM Route to World Class Performance Episode 6 pot

TPM Route to World Class Performance Episode 6 pot

Ngày tải lên : 12/08/2014, 08:22
... 85 - 85 I1 40 51 Snowgrinder I 250 1 10 600 I 10 850 I 14 I 10 1 24 I I 8 71 1 6 517 -5 925 I 847 1 Devlieg I 19 0 I 2760 I 2950 I 24 1 12 2 I 14 6 1 CNC650C-Axis ... refer to the columns in the figure. Average OEE calculation 11 1 - IV - 19 80 - 50 10 0 = 97.5% 19 80 Availability = - - I 11 V x VI 11 - - 2498 x 0.5 I 11 - IV 19 80 - ... gauge - Total parts - Total Mig Welding M/C - - - - - - - - - - f480 f182 t662 E15.00 560.00 E10.00 No cost E 113 .00 S198.00 t860.00 Figure 5 .19 Refurbishment example...
  • 20
  • 317
  • 0
TPM Route to World Class Performance Episode 7 doc

TPM Route to World Class Performance Episode 7 doc

Ngày tải lên : 12/08/2014, 08:22
... 10 246.50 4 975.67 2 790.67 18 012 .84 Selling price (E) 18 . 01 30. 51 52.55 276.02 22% 86.60 7% 12 35.76 Fixed Fixed costs/product costs/piece 228 046 5. 01 11 0 739 10 .94 62 10 9 ... 45540 9.40 13 .5 50 31 10 12 0 9.40 29.5 5042 3 680 9.40 45.5 59 340 Revenue forecast Part Total Operational cost/piece margin (%) (E) 5020 14 . 41 25 50 31 20.34 50 5042 26.28 10 0 Machine ... Consumables Inventory adjustment Material costs Direct labour Pensions Holiday pay 25’000 550.00 2.72 6 .13 13 8 .15 23 .14 13 .27 Labour costs Production Depreciation 18 8.55 37.78 Production...
  • 20
  • 281
  • 0
TPM Route to World Class Performance Episode 9 pptx

TPM Route to World Class Performance Episode 9 pptx

Ngày tải lên : 12/08/2014, 08:22
... Maintenance x 5 Operators x 9 1 Key contacts x 11 21 Lessons learned on one shift do not get transferred to others 1 87% 37% 1 61% 1 57% 1 40% 1 56% I 55% I 52% 33 ... 7 .16 Line study: Assessing the six losses RUNNING AT R irolyd Wmin) 12 0 ;;gked 17 0 output 10 0 50 0 06:OO 07:OO O8:OO 09:OO 1O:OO 11 :OO 12 :OO 13 :OO 14 :OO Figure 7 .17 ... OUTPUT 12 10 reams 1 SCRAP PAPER Figure 7 .18 Line study OEE calculations 233 interventions/downtime events (1 1 per week) Of average duration 1. 4 hours every 13 hours 59% less than 1 hour...
  • 20
  • 227
  • 0
TPM Route to World Class Performance Episode 10 pps

TPM Route to World Class Performance Episode 10 pps

Ngày tải lên : 12/08/2014, 08:22
... @) Totalcost (E) Unit cost IXA 0 Contribution (G) Unit sales price Totalcontribution (I) Rchxnoncapital employed 10 0 11 0 11 0 11 0 10 0 11 0 210 220 €2 .10 €2.00 1. 05 1. 15 3 .15 ... 210 220 €2 .10 €2.00 1. 05 1. 15 3 .15 3 .15 10 5 12 6.5 - +20W ~~ ~~ 10 0 10 5* 10 0 - 205 €2.05 @+A 1. 10 3 .15 11 0 (FXA +5 (t Producing 10 per cent more in the same time increases ... to 5 = reduction in date stoppages 50 TOTAL I Minimum score 30 = level 1A, 40 = level 1B Rating based on procedureskystems which are: 1 Not in place, with no plans to...
  • 20
  • 319
  • 0
TPM Route to World Class Performance Episode 11 ppt

TPM Route to World Class Performance Episode 11 ppt

Ngày tải lên : 12/08/2014, 08:22
... STEP 1 I STEP 2 1 STEP 3 11 STEP 4 STEP 5 Define0EE CAN DO CAN DO CAN DO CAN DO 1 CAN DO CAN DO IS A KEY PART OF THE TPA PROCESS Figure 10 .2 TPA improvement plan To ... top-down activities Roll out concept to systematically involve other functions Development of a TPA ’Spark to Start’ vision Figures 10 .4, 10 .5, 10 .6 and 10 .7 show typical examples of a business ... are TPM (Total Productive Manufacturing) and TPA (Total Productive L4dministration), as shown in Figure 10 .1. The value stream is driven by customer demand, and hence we have to maximize...
  • 20
  • 189
  • 0
TPM Route to World Class Performance Episode 13 pptx

TPM Route to World Class Performance Episode 13 pptx

Ngày tải lên : 12/08/2014, 08:22
... cost savings Reduce unit costs to give a total reduction of 35 per cent over two years to the end of 19 98, enabling RHP to compete in Asian markets TPM applied to all key processes Reinforcing ... to hold-ups in other parts of the foundry process. TPM has identified the external bottlenecks to allow the machine to work to its full potential. The cross-functional teams include operators, ... the following methods: Autonomous Maintenance System (AMs) boards These mobile boards show a schematic of the machine which the operator then tags with labels to show losses affecting availability,...
  • 20
  • 275
  • 0
TPM Route to World Class Performance Episode 14 ppt

TPM Route to World Class Performance Episode 14 ppt

Ngày tải lên : 12/08/2014, 08:22
... 26 ,17 1 Critical assessment, 49,89,90, 91, 92 ,13 0 13 7 Early equipment management (EEM), 2, Equipment 16 , 73 ,18 1 -19 2 dem-iption, 12 3 history, 49, 79 ,12 6 losses, 17 1 Event review, 10 4 -10 6 ... Maintenance (TPM), a Japanese management protocol developed to alleviate production losses caused by machine breakdowns has moved on. 11 111 11 11 111 Through TPM, more companies accept the ... infrastructure, 16 7 master plan, 17 1 milestones, 46, 17 4 pilot, 47 standards, 16 4 targets, 34 vision, 23, 44, 14 8, 16 5, 17 4 Trade unions, 34 Training plan, 14 1, 16 2 Transformation losses, 17 2...
  • 10
  • 198
  • 0
Guide to Ship Repair Estimates Episode 1 ppsx

Guide to Ship Repair Estimates Episode 1 ppsx

Ngày tải lên : 13/08/2014, 09:20
... condenser 55 5 .11 Overhauling heat exchanger 56 5 .12 Main steam turbines 57 5 .13 Flexible coupling 57 5 .14 Auxiliary steam turbines 58 5 .15 Water-tube boiler feed pumps (multi-stage type) 59 5 .16 Oil ... 80 6 .10 Installations of electric cable conduit 82 7 .1 General cleaning 83 7.2 Tank cleaning 84 7.3 Tank testing 84 x Tables ch000-prelim.qxd 28/7/00 11 :39 am Page x ch000-prelim.qxd 28/7/00 11 :39 ... Butler OXFORD AUCKLAND BOSTON JOHANNESBURG MELBOURNE NEW DELHI ch000-prelim.qxd 28/7/00 11 :39 am Page iii GUIDE TO SHIP REPAIR ESTIMATES (IN MAN-HOURS) ch000-prelim.qxd 28/7/00 11 :39 am Page i ...
  • 8
  • 270
  • 0
Guide to Ship Repair Estimates Episode 2 pps

Guide to Ship Repair Estimates Episode 2 pps

Ngày tải lên : 13/08/2014, 09:20
... block <20,000 5 3 20,000 10 0,000 10 5 10 0 ,000–200,000 16 8 > 200,000 20 12 ch0 01. qxd 28/7/00 11 :36 am Page 5 1 Introduction This guide has been produced in order to outline to technical super- intendents ... of tips to be applied in the preparation of repair specifications and finalizing contracts with ship repair yards. Introduction 3 ch0 01. qxd 28/7/00 11 :36 am Page 3 ch0 01. qxd 28/7/00 11 :36 am ... here. Figure 1 A vessel sitting on keel blocks undergoing repairs in dry dock ch0 01. qxd 28/7/00 11 :36 am Page 6 10 Guide to Ship Repair Estimates (in Man-hours) Hull painting ● Flat bottom ● Vertical...
  • 10
  • 190
  • 0
Guide to Ship Repair Estimates Episode 3 potx

Guide to Ship Repair Estimates Episode 3 potx

Ngày tải lên : 13/08/2014, 09:20
... (mm) (a) (b) Up to 15 0 8 – 15 0–250 12 – 250–300 15 35 300–400 23 50 400–800 30 11 0 800 12 00 35 15 0 12 00 18 00 – 200 18 00–2000 – 230 Drydocking works 19 ch0 01. qxd 28/7/00 11 :36 am Page 19 Table 2.6 ... inboard Up to 15 0 90 14 0 15 0–250 12 0 18 0 250–300 200 250 300–400 300 400 400–800 500 600 800 12 00 – 10 00 12 00 18 00 – 12 00 18 Guide to Ship Repair Estimates (in Man-hours) ch0 01. qxd 28/7/00 11 :36 am ... Page 18 Drydocking works 15 Man-hours Dia. (mm) Manganese Bronze Aluminium Bronze Up to 400 15 21 400–800 32 42 800 12 00 52 68 12 00 18 00 75 85 18 00–2000 90 10 5 2000–2500 10 0 12 5 2500–3000 13 0 15 0 3000–4000...
  • 10
  • 321
  • 0
Guide to Ship Repair Estimates Episode 4 ppsx

Guide to Ship Repair Estimates Episode 4 ppsx

Ngày tải lên : 13/08/2014, 09:20
... – 10 0 6 7 8.5 – 15 0 8 9 11 .5 – 200 10 11 14 – 250 13 14 18 – 300 16 17 22 – 350 20 21 26 13 400 23 24 29 14 450 26 28 33 14 .5 500 30 31 37 15 550 34 35 42 16 600 37 39 46 16 .5 650 41 43 51 17 700 ... 47 56 18 750 47 49 60 19 800 50 53 66 20 900 57 60 81 22 10 00 65 68 10 0 24 11 00 73 77 10 6 25 12 00 84 88 11 3 27 13 00 95 10 0 12 0 30 ch0 01. qxd 28/7/00 11 :36 am Page 23 Sea chests Table 2 .11 Sea ... per valve 50 9 75 10 10 0 12 12 5 14 15 0 16 200 17 Note: Disconnecting and removing ashore for above overhaul and later refit- ment; double the above rate. ch0 01. qxd 28/7/00 11 :36 am Page 24 3...
  • 10
  • 313
  • 0