Tài liệu Activity 5.1: Risks of Skipping Logical Design docx

2 333 0
Tài liệu Activity 5.1: Risks of Skipping Logical Design docx

Đang tải... (xem toàn văn)

Thông tin tài liệu

Activity 5.1: Risks of Skipping Logical Design In this activity, you will participate in a class discussion to identify the risks of not completing a logical design in the process of designing a business solution. Objectives After completing this activity, you will be able to: ! Articulate the value of logical design and the risks of not completing a logical design. Before You Begin This activity is a class discussion. Prerequisites There are no prerequisites for this activity. Materials There are no materials for this activity. Time to complete this activity: 10 minutes. 28 Activity 5.1: Risks of Skipping Logical Design Exercise 1: Identifying Potential Risks of Not Doing Logical Design ! Identify potential risks of not doing logical design 1. Consider the benefits that logical design brings to the design process. 2. As a class, discuss the possible risks involved in not completing a logical design. The instructor will write your answers on a flip chart. . Activity 5. 1: Risks of Skipping Logical Design In this activity, you will participate in a class discussion to identify the risks of not completing a logical. activity. Materials There are no materials for this activity. Time to complete this activity: 10 minutes. 28 Activity 5. 1: Risks of Skipping Logical Design

Ngày đăng: 10/12/2013, 16:16

Từ khóa liên quan

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan