Xây dựng Tầng hầm sâu và quy mô lớn các cấu trúc ngầm.Ví dụ về các cấu trúc dưới lòng đất. Tầng hầm của các tòa nhà. Bán Tầng hầm với mục đích ổn định độ dốc.

Trang 1

Basement Construction

Trang 2

Part Ï —

General understanding about the Construction of Basement

Trang 3

Construction of Deep Basement and

Large-sized Underground Structures

Examples of underground structures

Trang 4

Construction of Deep Basement and

Large-sized Underground Structures

Involvement/provision when constructing these

Structures

Trang 7

) Dee _á„-,.Z `

is 4 7

a “Wie real aw sỹ 1 ee ` s4 ?

Trang 8

ws = hb EE —

Trang 10

Methods for basement construction

Basement or similar underground structures can be constructed using the following approaches:

Trang 11

- suitable for site with abandon of unobstructed working space

| west E Z _ es

-_—" „ 4 ¬ ĐỘ ;

Trang 12

- suitable for basement of small to medium size

Trang 13

Construction of basement using Bottom-up

Trang 14

suitable for basement of very large size with complex environment

Trang 15

Construction of basement using Top-down approach

LEE GARDENS

REDEVELOPMLN! SEQUENCE OF TO? DOWN TECHNIC

- STAGE 2

Erection of Sice! Szucture for Tơ œe? Coru>vwetios

Excavz!:^^ ͜ \ Coenvguct:+o* of \

B^/£ \ Corsirectios of TY i Core Wall with

Trang 16

Compare the features of various

basement construction methods

Protection Simplest protection |Complex lateral Limited shoring

Support required — |support where req’d

Trang 17

Other consideration

Trang 19

Attributes that affect the construction of deep

basement:

Trang 20

HỆ i

imity lose prox!

Trang 22

Basement Project in very congested urban environment — the Redevelopment of Kwong On Bank in Queen’s Road Central,

Central District, Hong Kong

= Ty

VHA,

isis MUM)

Trang 23

Examples of very difficult

environment for

constructing basement

Trang 24

Complicated soil support arrangement

Trang 26

Special performance requirements imposed

Complete the whole or part of the work at a prescribed time or at Stages for handing back to the client

Protect some facilities according to prescribed requirements during

the course of work

Coordinate with some other contracts or contractors to have related

works carried out in the same or In close proximity of site

The nature of work required exceptionally high quality or accuracy in performance

Very high liquidated damages requirements is imposed in the

confract

Trang 27

where a new basement is required to construct

simultaneously to replace an old one

working under fast-track schedule,

some basement works need to be carried out at the same time with the new foundation or even with part of the future superstructure

Trang 28

Complicated phasing arrangement in _ constructing the basement of Lee Garden

Trang 29

Complicated Construction arrangement — demolition of the old basement, construction of the future building cap and core, erection of the new ground slab as top-down for the basement, working at the

same time

The Lee Garden Redevelopment case

Trang 30

Cheung Kong Center — foundation and core wall work at the same time with the top-down basemetn

>: tt

XS

7 >> “

Trang 31

The Center - Foundation and Basement construction arrangement

Trang 32

Common managerial problems identified in the

construction of deep basement:

Trang 33

There are many methods to construct large- scaled and deep basement

Trang 34

Redevelopment of

the Lee Theatre

Construction of basement using

traditional bottom-up

arrangement

Church for the Witness of the Christ Project

Trang 35

Example of very large-scale and complicated project — the Hang Hau Station of the MTR Tseung Kwan O Line

Trang 36

Example of very large-scale project — the Kowloon Station of the Airport Railway

Trang 37

Other considerations when doing basement works

Trang 38

Commonality found in recent basement projects

Trang 39

An extremely large-scale and complex project —

Construction of the International Finance Centre Phase II

(Top-down for the podium portion and bottom up for the building core portion)

Trang 41

Examples of very complicated phasing arrangement during the basement construcfion

Trang 42

Commonality found in recent basement projects (Cont.)

Trang 43

Special arrangement for the removal of spoil to facilitate basement excavation

Trang 44

Commonality found in recent basement projects (Cont.)

Trang 45

Basement construction using “Double Bit” arrangement — 1.e construct two levels of basement and fill in the

intermediate level at a later stage

Trang 46

The construction of basement bears a very spectacular Status in the entire construction process It often marks

the success of a project in terms of:

- profitability,

- ensurance of contract time,

- quality and safety considerations

Various professions would have their own involvement in the basement construction process and each of them has their own concerns It is not easy to formulate a simple yet Straight forward solution to get everything right

Better understanding of the variety of possible methods and practices, as well as knowing the constraints when handling basement works, there is higher chance to complete the work with a more acceptable result - >

Trang 47

Conclusion (Cont.)

Trang 48

Redevelopment of the URC’s site at Mong Kok — using top-down and bottom-up mixed method

Trang 49

Land Renewal Council’s site at Mong Kong — the input of large

amount of resources (mechanical plants) may not help much in very complicated basement project)

' š ` ; ba rr " et Ay: 5 '

Ngày đăng: 18/10/2012, 10:52

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan