Atlas Infor about electricity sector in Vietnam ppsx

9 256 0
Atlas Infor about electricity sector in Vietnam ppsx

Đang tải... (xem toàn văn)

Thông tin tài liệu

Atlas Infor about electricity sector in Vietnam (up to the end of 2005) Son La Hydropower Plant with capacity of 2400 MW 1. Overview Electricity of Vietnam (EVN) is the State corporation (since 1994) under Ministry of Industry with 2 main objectives: · Invest to build power projects (for generation and transmission) · Produce and supply power to the national economy At present time, the total installed capacity is 11,286 MW, energy production is 52.5 billion kWh, energy production per capita is 645 kWh. The rural electrification is covered 98% of districts, 95.4% of villages and 88.5% of households throughout the country. EVN itself has 80,000 employees with 53 independent organisation including 13 Management Boards (for generation and transmission), 4 Power Engineering and Consulting Companies, 1 Institute of Energy, 7 Power Companies, 4 Transmission Companies, 14 Power Plants, 2 Manufacturing Companies, 1 National Load Dispatch Center, IT Center, etc. The total installed capacity is 11,286 MW, in which 8,847 MW belongs to EVN and 2,439 MW is outside EVN. Out of 11,286 MW there are 4,198 MW from hydro (36.5%), 2,090MW from coal-fired thermal (18.5%), 4,503 MW from gas thermal (40%), 495 MW from diesel and other resources (5%). Transmission lines: · 500 kV: 2,469 km · 220 kV: 4,795 km · up to 110 kV: 9,819 km 2. Power demand and plan for generation development Power demand · In general: 2005 2010 2015 2020 Installed capacity (MW) 11,286 26,000 42,000 62,000 Energy production (10 6 kWh) 53.5 113 190 294 Commercial energy production (10 6 kWh) 45.6 97 165 257 Commercial energy production per capita (kWh) 550 1,106 1,774 2,629 · In hydro: 2005 2010 2015 2020 Installed capacity (MW) 4,198 10,200 15,300 16,580 Percentage (%) 36.5% 40% 36% 27% 3. Hydropower potential Meteo-hydrological features The country area is 328,000 km 2 where 3 fourth is mountains and highlands. The length from the North to the South is 1,630 km. The climate is tropical, rainy season in the North and the South is from June to November, in the Central Highland is from August to December. The mean annual rainfall is 2,000 mm, maximum is 4,000 – 5,000 mm, minimum is 1,000 mm. There are 2,400 rivers and riverlets with the length over 10 km. Most of them enter the Pacific Ocean with 870 km 3 /year (37,500 m 3 /s). Cua Dat Hydropower Plant with capacity of 99 MW in a multipurpose hydraulic system Hydropower potential Theoretical hydropower potential is 300 billion kWh (2,400 rivers and riverlets). Technical potential is 123 billion kWh corresponding with 31,000 MW. Techno- economical potential is 75 – 80 kWh corresponding with 18,000 – 20,000 MW. Up to now the total installed capacity is 4,200 MW with annual energy production of 18 billion kWh, occupying 20% of total economical potential. There are 300 small and mini hydropower projects (up to 30 MW) with total capacity of 2,00 – 2,500 MW and 8 – 10 billion kWh. There are 10 planning pump-storaged projects with total capacity of 10,000 MW. The pre-FS is under implementation for East Phu Yen (Son La province, 1,200 MW) and Bac Ai (Ninh Thuan province, 1,000 MW). 4. Power plants under operation and hydroprojects under construction up to 2010 Power plants under operation Total capacity is 4,198 MW of 11 hydropower plants and small hydro plants including: Hoa Binh (1920 MW), Yali (720 MW), Tri An (400 MW), Ham Thuan (300 MW), Dami (175 MW), Da Nhim (160 MW), Thac Mo (150 MW), Thac Ba (108 MW), Can Don (78 MW), Song Hinh (70 MW), Vinh Son (66 MW) and small hydropower (50 MW). Hydropower projects under construction Total capacity is 6,768 MW of 20 hydropower projects done by EVN, in which Son La is the biggest one (2,400 MW, 6 units of 400 MW), planning to be commisioned at the end of 2010. Here is the list of EVN projects, as belows: No Project name Province Capacity (MW) Dam type Dam height (m) 1 Tuyen Quang Tuyen Quang 342 CFRD 93 2 Son La Son La 2,400 RCC 138 3 Huoi Quang Son La 520 RCC 130 4 Ban Chat Lai Chau 220 RCC 104 5 Ban Ve Nghe An 300 RCC 136 6 Quang Tri Quang Tri 64 CFRD 75 7 Song Tranh 2 Quang Nam 190 RCC 95 8 Song Ba Ha Phu Yen 220 Earthfill 60 9 Kanak – An Khe Gia Lai 173 CFRD 64 10 A Vuong Quang Nam 210 RCC 82 11 Dong Nai 3 Lam Dong 240 RCC 100 12 Dong Nai 4 Lam Dong 270 RCC 128 13 Dai Ninh Lam Dong 300 Rockfill 50 14 Bac Binh Binh Thuan 33 Earthfill 25 15 Buon Tou Srah Dac Lac 86 Rockfill 85 16 Buon Kuop Dac Lac 280 Earthfill 30 17 Srepok 3 Dac Lac 220 Rockfill 60 18 Pleikrong Kon Tum 110 RCC 71 19 Se San 3 Gia Lai 260 RCC 70 20 Se San 4 Gia Lai 330 RCC 74 Total capacity is 1,000 MW of some other hydropower projects done by other organisations than EVN (up to 2010) using BOT or IPP such as Cua Dat (97 MW), Se San 3A (96 MW), etc. Besides, at present time the FS of some hydroprojects is carried out by EVN in oder to put them into operation in the period of 2010 - 2015 such as Nho Que 3 (135 MW). Lai Chau (1200 MW), Ban Uon (250 MW), Khe Bo (100 MW), Song Boung 4 (145 MW, supported by ADB), Song Boung 2 (100 MW), Dak Mi 1 (200 MW), Upper Kontum (260 MW). Small and microhydro There will be 300 – 380 MW of small and micro hydro that will be operated in the period of 2006 – 2010. 5. Regional cooperation Cooperation with Laos In the near future it’s planning to build two transmission lines of 220 kV (Nam Mo – Ban Ve – Vinh and Se Ka Man 3 – A Vuong – Da Nang) to help import electricity from Laos. The total capacity of 1,000 MW is planning to import up to 2010, and 1,000 MW more after 2010 from Nam Thom 2 (1088 MW) and Se Ka Man 1, Se Kong 4, 5 and Nam Kong (1,600 MW) by 500 kV transmisson line (after 2010). Cooperation with Campuchia In the period of 2008 – 2010 the total capacity of 150 – 200 MW will be provided to Campuchia by 220 kV transmission line (Chau Doc – Ta Keo – Phnom Penh). In the period of 2015 – 2016 the total capacity of 430 MW (Lower Se San 2, Lower Srepok 2 in Campuchia territory) will be imported by 220 kV transmission line. Cooperation with China At the end of 2006, total capacity of 250 – 300 MW will be imported from neighboring districts of China by 220 kV transmission line Lao Cai – Yen Bai – Viet Tri. In the middle of 2007, total capacity of 200 MW will be imported from neighboring districts of China by 220 kV transmission line Ha Giang – Thai Nguyen. It’s considering to import 1,500 MW in the period of 2016 – 2018 by 500 kV transmission line Hong He – Soc Son. 6. Policies on the financing distribution - Privatisation of Power Plants - Privatisation of Power Companies - Bonds - Domestic credit loan - ECA - Diversification of different financing sources . Atlas Infor about electricity sector in Vietnam (up to the end of 2005) Son La Hydropower Plant with capacity of 2400 MW 1. Overview Electricity of Vietnam (EVN) is. 80,000 employees with 53 independent organisation including 13 Management Boards (for generation and transmission), 4 Power Engineering and Consulting Companies, 1 Institute of Energy, 7 Power. neighboring districts of China by 220 kV transmission line Lao Cai – Yen Bai – Viet Tri. In the middle of 2007, total capacity of 200 MW will be imported from neighboring districts of China by

Ngày đăng: 13/08/2014, 22:21

Từ khóa liên quan

Tài liệu cùng người dùng

Tài liệu liên quan