Thông tin tài liệu
Primavera
®
P6
™
Project Management
Reference Manual
Version 6.2.1
Copyright © 1999, 2009, Oracle and/or its affiliates. All rights reserved.
The Programs (which include both the software and documentation) contain proprietary information; they are
provided under a license agreement containing restrictions on use and disclosure and are also protected by
copyright, patent, and other intellectual and industrial property laws. Reverse engineering, disassembly, or
decompilation of the Programs, except to the extent required to obtain interoperability with other independently
created software or as specified by law, is prohibited.
The information contained in this document is subject to change without notice. If you find any problems in the
documentation, please report them to us in writing. This document is not warranted to be error-free. Except as
may be expressly permitted in your license agreement for these Programs, no part of these Programs may be
reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose.
If the Programs are delivered to the United States Government or anyone licensing or using the Programs on
behalf of the United States Government, the following notice is applicable:
U.S. GOVERNMENT RIGHTS Programs, software, databases, and related documentation and technical data
delivered to U.S. Government customers are "commercial computer software" or "commercial technical data"
pursuant to the applicable Federal Acquisition Regulation and agency-specific supplemental regulations. As
such, use, duplication, disclosure, modification, and adaptation of the Programs, including documentation and
technical data, shall be subject to the licensing restrictions set forth in the applicable Oracle license agreement,
and, to the extent applicable, the additional rights set forth in FAR 52.227-19, Commercial Computer Software
Restricted Rights (June 1987). Oracle USA, Inc., 500 Oracle Parkway, Redwood City, CA 94065.
The Programs are not intended for use in any nuclear, aviation, mass transit, medical, or other inherently
dangerous applications. It shall be the licensee's responsibility to take all appropriate fail-safe, backup,
redundancy and other measures to ensure the safe use of such applications if the Programs are used for such
purposes, and we disclaim liability for any damages caused by such use of the Programs.
Oracle, JD Edwards, PeopleSoft, and Siebel are registered trademarks of Oracle Corporation and/or its affiliates.
Other names may be trademarks of their respective owners.
The Programs may provide links to Web sites and access to content, products, and services from third parties.
Oracle is not responsible for the availability of, or any content provided on, third-party Web sites. You bear all
risks associated with the use of such content. If you choose to purchase any products or services from a third
party, the relationship is directly between you and the third party. Oracle is not responsible for: (a) the quality of
third-party products or services; or (b) fulfilling any of the terms of the agreement with the third party, including
delivery of products or services and warranty obligations related to purchased products or services. Oracle is not
responsible for any loss or damage of any sort that you may incur from dealing with any third party.
To view the P6 Commercial Notices and Disclosures for Documentation, go to the
\Documentation\<language>\Notices and Disclosures folder of the P6 physical media or download.
iii
Table of Contents
Preface xi
Primavera Products xii
Using Documentation and Help xv
Where to Get Support xviii
Part 1: Overview and Configuration
Understanding Project Management 21
Why Use Project Portfolio Management? 22
Your Role in the Organization 23
Project Management Process Overview 26
Planning, Controlling, and Managing Projects 28
Quick Tour 31
Getting Started 32
Selecting a Language 36
The Workspace 37
What Is a Layout? 40
Customizing Displays 42
Sample Layouts 44
Using Wizards 46
Setting User Preferences 49
Formatting Time Units 50
Formatting Dates 52
Setting View Currency and Symbols 53
Setting Mail Preferences 54
Implementing Wizards 55
Creating a Log of Tasks and Setting Startup,
Group and Sort, and Column Options 56
Changing Your Password 58
Setting Profile and Spreadsheet Data Options 60
Setting Calculation Options for Resource and Role Assignments 62
Selecting Startup Filters 64
iv Table of Contents
Primavera - Project Management
Part 2: Structuring Projects
Setting Up the Enterprise Project Structure 67
Enterprise Project Structure Overview 68
Setting Up the Enterprise Project Structure 75
Adding a New Project to the Enterprise Project Structure 77
Using Project Architect 79
Working with the Enterprise Project Structure 87
Defining Enterprise Project Structure Details 92
Setting Up the Organizational Breakdown Structure 103
The OBS 104
Viewing an OBS 107
Setting Up an OBS 109
Editing OBS Elements 112
Defining Resources and Roles 115
Resources Overview 116
Viewing and Adding Resources 117
Defining Resource Shifts 124
Defining and Assigning Resource Codes and Values 125
Setting Up Roles 128
Assigning Roles to Resources 133
Defining Custom Resource Curves 135
Reviewing Work Breakdown Structures 139
The WBS 140
Viewing a WBS 142
Grouping by WBS Path 144
Adding WBS Elements and Assigning Properties 145
Using WBS Milestones 149
Assigning WBS Category Values 151
Defining Earned Value Settings for Specific WBS Elements 152
Assigning Estimation Weights to WBS Elements 155
Defining Budgets 159
Top-Down Budgeting 160
Establishing Budgets 163
Establishing a Monthly Spending Plan 165
Tracking Budget Changes 167
Establishing Funding 169
Tracking and Analyzing Budgets 172
Establishing Project Codes 173
Defining and Assigning Project Codes 174
Grouping, Summarizing, and Filtering by Codes 179
Table of Contents v
Primavera - Project Management
Working with User-Defined Fields 183
Creating User-Defined Fields 184
Working with User-Defined Fields 186
Working with Indicators 188
Creating Calendars 191
Adding Calendars 192
Modifying Calendars 194
Part 3: Implementing the Schedule
Establishing Activity Codes 201
Creating Activity Codes and Values 202
Grouping and Summarizing by Codes 207
Working with Activities 211
Activities Overview 212
Adding Activities 213
Defining General Activity Information 215
Defining Schedule Information 219
Establishing Relationships 223
Displaying Activity Details for Assignments 229
Assigning Resources and Roles 230
Assigning Resource Curves to Resource or Role Assignments 234
Manually Planning Future Period Assignments 235
Assigning Activity Codes and Adding Expenses 241
Viewing Activity Feedback and Posting Resource Notes 243
Assigning Work Products and Documents 245
Adding Steps 246
Creating and Assigning Activity Step Templates 248
Viewing Activity Summaries 251
Viewing Contract Manager Documents 252
Using Global Change 253
Working with Cost Accounts and Project Expenses 257
Cost Account and Expense Overview 258
Setting Up a Cost Account Structure 259
Adding Expenses and Entering Cost Information 263
Defining Expense Details 266
Analyzing Costs 268
Performing Top-Down Estimation 271
Performing Top-down Estimation 272
Applying Saved Top-Down Estimates To a Project 276
vi Table of Contents
Primavera - Project Management
Part 4: Updating and Managing the Schedule
Managing Baselines 281
Creating and Maintaining Baselines 282
Assigning Baselines to Projects 286
Comparing Current and Baseline Schedules 288
Updating Baselines 290
Updating, Scheduling, and Leveling 295
The Update Process 296
Choosing a Method of Updating 298
Highlighting Activities for Updating 302
Updating Progress for Spotlighted Activities 304
Estimating Progress Automatically 306
Updating Using Timesheets 309
Updating Activities Manually 314
Interrupting Activity Progress 320
Applying Actuals 322
Storing Period Performance (Past Period Actuals) 324
Scheduling Projects 328
Leveling Resources 333
Recalculating Resource and Role Assignment Costs 337
Managing Resource Assignments 339
Summarizing Projects 341
Setting Summarization Options 342
Summarizing Project Data 343
Project Issues and Thresholds 351
Adding Issues 352
Assigning Tracking Layouts to Issues 356
Using the Issue Navigator 357
Adding Thresholds 358
Threshold Parameter Definitions 361
Monitoring Thresholds 365
Assigning Tracking Layouts to Thresholds 366
Managing Risks 367
Adding Risks 368
Calculating Exposure Values 370
Calculating a Risk’s Impact 371
Creating and Deleting Risk Types 372
Customizing Risk Layouts 373
Table of Contents vii
Primavera - Project Management
Maintaining a Project’s Document Library 375
Viewing a Document Library and
Adding/Deleting Work Products and Documents 376
Specifying Document Location References 378
Assigning Work Products and Documents 379
Tracking Projects 381
Creating Tracking Layouts 382
Working with Tracking Layouts 385
Customizing Tracking Layouts 386
Grouping, Sorting, and Filtering Data in Tracking Layouts 388
Comparing Projects with Claim Digger 391
Claim Digger Overview 392
Comparing Projects/Baselines 393
Comparison Data 400
Creating and Using Reflections 407
Reflection Overview 408
Creating and Using Reflections 409
Reflection Guidelines 413
Checking Projects In and Out 415
Managing Remote Projects 416
Checking Out Projects 417
Checking In Projects 419
Part 5: Customizing Projects
Working with Layouts 425
Layout Types 426
Creating, Opening, and Saving Layouts 432
Exporting and Importing Layouts 433
Copying and Pasting Resource Spreadsheet Data to Microsoft Excel 434
Grouping, Sorting, and Filtering Data 435
Grouping Data 436
Sorting Data 440
Filtering Data 441
Customizing Layouts 445
Modifying Columns 446
Adjusting the Timescale 449
Formatting Gantt Charts 452
Formatting Activity Network Layouts 460
Modifying Resource and Activity Usage Profile Settings 464
viii Table of Contents
Primavera - Project Management
Customizing Reports 473
Reports Overview 474
Opening Reports 475
Creating and Modifying Reports 476
Using the Report Editor 479
Adding Data Sources and Rows to Reports 483
Adding Text Cells to Reports 487
Sorting Report Data Sources 495
Customizing a Report with the Report Editor: an Example 496
Using Report Groups 506
Setting Up Batch Reports 507
Printing Layouts and Reports 509
Defining Page Settings 510
Previewing Layouts and Reports 514
Printing Layouts and Reports 515
Publishing Layouts and Reports in HTML Format 517
Publishing a Project On the Web 519
Project Web Site Overview 520
Publishing a Project Web Site 522
Customizing the Appearance of a Project Web Site 524
Publishing Activity and Tracking Layouts 525
Part 6: Importing and Exporting Data
Linking the Project Management
and Contract Manager Modules 529
Linking the Project Management Module to Contract Manager 530
Linking a Project Management Project to a Contract Manager Project 532
Importing Contract Manager Data
to a Project Management Module Project 534
Transferring Data to Other
Project Management Module Users 537
Exporting Projects 538
Exporting Roles or Resources 545
Importing Projects 547
Importing Roles or Resources 567
Transferring Methodology Data 573
Exporting Methodologies 574
Exporting Roles or Resources 576
Importing Methodologies 578
Importing Projects as Methodologies 583
Importing Roles or Resources 588
Table of Contents ix
Primavera - Project Management
Transferring Data Using Microsoft Project Files 593
Exporting Projects 594
Exporting Resources 602
Importing Projects from Microsoft Project 607
Importing Resources from Microsoft Project 618
Transferring Data Using Microsoft Excel Files 627
Exporting Project Data to Microsoft Excel 628
Updating Project Data in Microsoft Excel 635
Importing Projects from Microsoft Excel 638
Transferring Data Between P3 and
the Project Management Module 643
Exporting Projects to P3 3.x 644
Importing P3 3.x Projects to the Project Management Module 653
Transferring Data to Primavera Contractor Users 681
Exporting Projects 682
Exporting Resources 685
Index 687
[...]... high-level project managers; they are responsible for multiple projects and use the Project Management and Methodology Management modules, along with P6 Web Access to: ■ Perform cross -project analysis ■ Manage projects to on-time and on-budget completion ■ Prioritize resources across projects ■ Plan projects before they are funded Primavera - Project Management Understanding Project Management 25 Project. .. Use Project Portfolio Management? Your Role in the Organization Project Management Process Overview Planning, Controlling, and Managing Projects Primavera software products are designed to support the project management needs of organizations that manage large numbers of projects at one time These integrated applications use project portfolio management (PPM) to support the management needs of project. .. support and training Primavera - Project Management Part Overview and Configuration In this part: Understanding Project Management Quick Tour Setting User Preferences 1 R ead this part to learn more about project portfolio management “Understanding Project Management discusses Primavera’s approach to managing projects It also defines the various organization-wide project management roles, explains how... Equipment ■ Information ■ Facilities ■ Roles Project portfolio management factors in all of these variables across multiple projects, enabling project managers and company executives to see an accurate picture of how each project s resource use affects other projects Primavera - Project Management Understanding Project Management 29 The process of project management is guided by three key principles:... propriety exchange format (XER) ■ exchange project data with other Primavera Project Management users using Primavera XML files ■ exchange project data with Microsoft Project or Microsoft Excel ■ exchange project data between the Project Management module and Primavera Project Planner (P3), Primavera Contractor, and Primavera Contract Manager users Project Management Help Provides an extensive online... grouped together, such as project templates or high-risk projects Within each root node, you can further break down an EPS into multiple EPS nodes, such as Capital Improvement projects and Manufacturing projects, to categorize the types of templates projects Primavera - Project Management Understanding Project Management 27 The WBS acts as a continuation of the EPS for the individual projects in the organization... Welcome dialog box to create a new project, open an existing project or the last open project, or open global data only Primavera - Project Management Quick Tour 33 Click to select a different portfolio Starts the Create a New Project wizard for adding a new project Displays the Open Project dialog box for selecting an existing project or EPS node to open Opens the last project you used Opens the module... controlling projects using the Project Management module Read the first chapter to become familiar with the process of PPM, then follow the steps in each successive chapter to build projects and project components, set up codes and documents, manage the resources required to complete the project plan, update projects as work gets underway, and report results throughout the project life cycle This manual. .. program /project managers to structure project, organizational breakdown structure (OBS), and resource hierarchies, set up basic calendars, and define organization-wide custom fields and codes in the Project Management module ■ Working with the project administrator to create user accounts and user groups for the Project Management module ■ Assigning security rights to users in the Project Management. .. ■ display specific information about project ■ produce reports that detail or summarize project information and answer key questions that arise as the project progresses ■ publish a project on the World Wide Web Part 6: Importing and Exporting Data Describes how to: ■ exchange project and methodology data with other Primavera Project Management and Methodology Management users using Primavera’s propriety . the Project Management
and Contract Manager Modules 529
Linking the Project Management Module to Contract Manager 530
Linking a Project Management Project. Configuration
Understanding Project Management 21
Why Use Project Portfolio Management? 22
Your Role in the Organization 23
Project Management Process Overview