0
  1. Trang chủ >
  2. Kỹ Thuật - Công Nghệ >
  3. Điện - Điện tử >

iec 60076-3 power transformers - insulation levels, dielectric tests and external clearances in a

iec 60076-3 power transformers - insulation levels, dielectric tests and external clearances in a

iec 60076-3 power transformers - insulation levels, dielectric tests and external clearances in a

... Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ... Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ... International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International...
  • 125
  • 632
  • 9
iec 60076-10 power transformers - determination of sound levels

iec 60076-10 power transformers - determination of sound levels

... undertake to apply IEC InternationalStandards transparently to the maximum extent possible in their national and regional standards. Anydivergence between the IEC Standard and the corresponding ... shall be on no-load and excited at the rated voltage of sinusoidal or practicallysinusoidal waveform and rated frequency. The voltage shall be in accordance with 10.5 of IEC 6007 6-1 . If a transformer ... any IEC National Committee interested in the subject dealt with mayparticipate in this preparatory work. International, governmental and non-governmental organizations liaisingwith the IEC also...
  • 42
  • 664
  • 6
iec 60076-1 power transformers - general

iec 60076-1 power transformers - general

... Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ... Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ... International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International...
  • 96
  • 578
  • 11
iec 60076-2 power transformers - temperature rise

iec 60076-2 power transformers - temperature rise

... Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ... Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ... International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International Electrotechnical CommissionLicensed by Information Handling ServicesCOPYRIGHT International...
  • 61
  • 509
  • 10
iec 60076-4 power transformers - guide to the lightning impulse and switching impulse testing

iec 60076-4 power transformers - guide to the lightning impulse and switching impulse testing

... Power transformers – Part 3: Insulation levels, dielectric tests and external clearances in air IEC 60289, Reactors IEC 6108 3-1 , Instruments and software used for measurement in high-voltage impulse ... GeneralPart 2: Temperature risePart 3: Insulation levels, dielectric tests and external clearances in airPart 4: Guide to lightning impulse and switching impulse testing – Power transformers and reactorsPart ... winding or to earth, show aninstantaneous change in polarity. There will also be a change in basic frequency and theremay be a decrease in amplitude. A fault from the tested winding to an adjacent...
  • 132
  • 729
  • 11
iec 60076-8 power transformers - application guide

iec 60076-8 power transformers - application guide

... dealt with mayparticipate in this preparatory work. International, governmental and non-governmental organizations liaisingwith the IEC also participate in this preparation. The IEC collaborates ... and regional standards. Anydivergence between the IEC Standard and the corresponding national or regional standard shall be clearlyindicated in the latter.5) The IEC provides no marking procedure ... withoutbalancing ampere-turns in any other winding. Such a current appears as a magnetizing currentfor the magnetic circuit and is controlled by a magnetizing impedance, across which a zero-sequence...
  • 176
  • 678
  • 6
Power transformers principles and application

Power transformers principles and application

... Reserved.primary and secondary windings, and a two-phase two-winding transformerhas two sets of primary and secondary windings.Chapter 1 described the basic theory of operation of a two-winding trans-former, ... secondary by 30° for an A- B-C,1– 2-3 phase rotation. Suppose A phase and C phase are interchanged on boththe primary and the secondary sides of the transformer, which retains the origi-nal A- B-C ... light load.When constructing a Y-Y transformer using single-phase transform-ers connected in a bank, the measured line-to-neutral voltages arenot 57.7% of the system phase-to-phase voltage at no...
  • 286
  • 413
  • 7
Báo cáo y học:

Báo cáo y học: "Hepatitis C Virus Serologic and Virologic Tests and Clinical Diagnosis of HCVRelated Liver Disease"

... to antiviral therapy. Virological tools include serological assays for anti-HCV antibody detection and serological determination of the HCV genotype, and molecular assays that detect and quantify ... 300 articles and book chapters in his areas of expertise. Int. J. Med. Sci. 2006, 3 36TMA-based assay Versant® HCV RNA Qualitative Assay (Bayer HealthCare) is 10 IU/ml (Table 1). Real-time ... dynamic ranges of quantification of the currently available assays, i.e. the HCV RNA intervals within which quantification is accurate in the corresponding assay. HCV RNA levels falling above...
  • 6
  • 612
  • 0
Prospects of concentrating solar power to deliver key energy services in a developing country

Prospects of concentrating solar power to deliver key energy services in a developing country

... on about 50 % hydropower and 50 % conventional thermal power (mainly natural gas) and that the conventional thermal capacity in the SING grid (100 % thermal) has a large coal base, this estimated ... http://www.renewable-energy-world.com/display_article/294300/121/ARCHI/none/none/1/CSP-lifts-off:-Nevada-Solar-One-comes-to-life/ 4 Increasing the size of a project could create several scale advantages in ... the USA, mainly in and near desert regions where solar irradiance is generally high and the potential conflict with alternate land-usage is marginal. Chile, having realised the potential of...
  • 12
  • 491
  • 0

Xem thêm

Từ khóa: speak to win how to present with power in any situationlevels of provision and attainmenttests and certificates astandardized tests and computer skillsmanual of diagnostic tests and vaccines for terrestrial animalsmanual of diagnostic tests and vaccines for terrestrial animals 6th edition 2008manual of diagnostic tests and vaccines for terrestrial animals 6th editionmanual of diagnostic tests and vaccines for terrestrial animals 2012 isbnmanual of diagnostic tests and vaccines for terrestrial animals 6th edmanual of diagnostic tests and vaccines for terrestrial animals 2004manual of diagnostic tests and vaccines for terrestrial animals 2009manual of diagnostic tests and vaccines for terrestrial animals 5th edition 2004manual of diagnostic tests and vaccines for terrestrial animals 2012 pdfmanual of diagnostic tests and vaccines for terrestrial animals 2010readings in applied microeconomics the power of the market pdfBáo cáo thực tập tại nhà thuốc tại Thành phố Hồ Chí Minh năm 2018Nghiên cứu tổ hợp chất chỉ điểm sinh học vWF, VCAM 1, MCP 1, d dimer trong chẩn đoán và tiên lượng nhồi máu não cấpBiện pháp quản lý hoạt động dạy hát xoan trong trường trung học cơ sở huyện lâm thao, phú thọGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitĐỒ ÁN NGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWANĐỒ ÁN NGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWANNGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWAN SLIDEPhối hợp giữa phòng văn hóa và thông tin với phòng giáo dục và đào tạo trong việc tuyên truyền, giáo dục, vận động xây dựng nông thôn mới huyện thanh thủy, tỉnh phú thọNghiên cứu, xây dựng phần mềm smartscan và ứng dụng trong bảo vệ mạng máy tính chuyên dùngTìm hiểu công cụ đánh giá hệ thống đảm bảo an toàn hệ thống thông tinChuong 2 nhận dạng rui roBT Tieng anh 6 UNIT 2Tăng trưởng tín dụng hộ sản xuất nông nghiệp tại Ngân hàng Nông nghiệp và Phát triển nông thôn Việt Nam chi nhánh tỉnh Bắc Giang (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 15: Tiêu hóa ở động vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtTrách nhiệm của người sử dụng lao động đối với lao động nữ theo pháp luật lao động Việt Nam từ thực tiễn các khu công nghiệp tại thành phố Hồ Chí Minh (Luận văn thạc sĩ)Chiến lược marketing tại ngân hàng Agribank chi nhánh Sài Gòn từ 2013-2015Đổi mới quản lý tài chính trong hoạt động khoa học xã hội trường hợp viện hàn lâm khoa học xã hội việt namHIỆU QUẢ CỦA MÔ HÌNH XỬ LÝ BÙN HOẠT TÍNH BẰNG KIỀMQUẢN LÝ VÀ TÁI CHẾ NHỰA Ở HOA KỲ