... & Tail Cords. Inter-building Campus Cabling Use LSPM 2 x wavelengths, both in 2 x directions, AND ALSO Use OTDR For Links less than 300m, It is not an ADC KRONE requirement. For Links ... Pacific) OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 10 of 12 27 OTDR Testing, Unacceptable Results Due To Ghosting “Ghosting” is the persence of multiple peaks in an OTDR trace ... Cabling Under TestL1 OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 7 of 12 21 Reference Setting on LSPM Using the 1-Test Cord Method (Step 1) For MMF, apply a Mandrel Wrap in the...