... 49 171 062 6666. Signaling Connection Control Part 163 MTP SCCP <= =>SPC <= =>Called party address/Calling party address Network nodeNetwork node Network node SPC Signaling point code MTP ... Bits 4 through 7 are Signaling Connection Control Part 165 Protocol class 8 bit Bit 0Bit 7 Spare (0000) 001X 000X 0000 1000 => =02/03 connection oriented => =00/01/8...
Ngày tải lên : 19/10/2013, 03:20
  • 17
  • 329
  • 0
Project Planning and Control Part 9

Project Planning and Control Part 9

... instructions or manuals Project Planning and Control Spares lists (usually priced) divided into operating and strategic spares Lubrication schedules Quality control records and audit trails Material ... format. Figure 32.1 shows the normal sequence of controls of a project from business case to close-out; Figure 32.2 gives a diagrammatic version of the control techniques for the differe...
Ngày tải lên : 17/10/2013, 21:15
  • 24
  • 352
  • 0
Project Planning and Control Part 10

Project Planning and Control Part 10

... 6079, Part 1, Guide to Project Management, BSI (2002) British Standards Institution, BS 6079, Part 2, Project Management Vocabulary, BSI (2000) British Standards Institution, BS 6046, Parts 1–4, ... advice, 60 Control graphs, 229, 251, 267, 284, 310, 336, 337 Coordinates, 72, 74, 75 Cost bound project, 3 Cost Breakdown Structure (CBS), 34, 35, 301 Cost control, 220, 331 Cost control...
Ngày tải lên : 20/10/2013, 13:15
  • 22
  • 426
  • 0
Tài liệu Project Planning and Control Part 1 pptx

Tài liệu Project Planning and Control Part 1 pptx

... planning and monitoring systems were only part of the project manager’s armoury. The purpose of this book, therefore, is to explain what some of these other parts are. It was not, however, the intention ... project planning, cost control, monitoring, risk management and change management. Preface to the third edition As the first two editions already contained such hard skills as project p...
Ngày tải lên : 26/01/2014, 11:20
  • 63
  • 443
  • 1
Tài liệu Project Planning and Control Part 2 pptx

Tài liệu Project Planning and Control Part 2 pptx

... to ensure that this takes place, a document control, or version control procedure must be part of the project management plan. In practice a document control procedure may be either a single page ... configuration is adequately monitored and controlled. To this end a Configuration Control Committee is appointed to head up special Interface Control Groups and Configuration Control...
Ngày tải lên : 26/01/2014, 11:20
  • 39
  • 503
  • 0
Tài liệu Project Planning and Control Part 3 pptx

Tài liệu Project Planning and Control Part 3 pptx

... and Control would simply restate the first activity as ‘Cast Column and Strike Formwork, 6 days’ (Figure 13.2). While this overcomes the drafting problem it may not be acceptable from a cost control ... accurate prediction is obtained immediately and the float of any particular activity can be seen almost by 97 Project Planning and Control inspection. It will be noted that each activity...
Ngày tải lên : 26/01/2014, 11:20
  • 46
  • 464
  • 0
Tài liệu Project Planning and Control Part 4 pdf

Tài liệu Project Planning and Control Part 4 pdf

... and studied. There may be instances where a department manager may want to change a sequence of activities or add new items to his or her particular part of the network. Such logic changes are ... report for his client. Indeed, when a client organization has standardized on a partic- ular project management system for controlling the overall project, the contractor may well be required to u...
Ngày tải lên : 26/01/2014, 11:20
  • 38
  • 549
  • 0
Tài liệu Project Planning and Control Part 5 ppt

Tài liệu Project Planning and Control Part 5 ppt

... situation to all parties, but a plan in which the participants have no faith is not worth the paper it is drawn on. Having convinced all parties that the network is a useful control tool, the project ... small cracks do appear in this vital bridge of understanding between the planning depart- ment and the operational departments, the project manager must do everything in his power to close...
Ngày tải lên : 26/01/2014, 11:20
  • 46
  • 508
  • 0
Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

... offices or factories where the basic unit of control is the man hour. Cost control and EVA SMAC – Manhour control Site Manhour and Cost (SMAC)* is a cost control system developed specifically on ... field 228 Figure 27.2 Figure 27.3 Cost control and EVA or on the shopfloor before drafting the network and fixing the sequence and duration of each activity. Control graphs Apart from...
Ngày tải lên : 26/01/2014, 11:20
  • 45
  • 409
  • 0
Tài liệu Project Planning and Control Part 7 pptx

Tài liệu Project Planning and Control Part 7 pptx

... 0.51/item Flanged connection (10-inch) 0.78 × 1.15 = 0.90 /connection (8-inch) 0.43 × 1.15 = 0.50 /connection (6-inch) 0.38 × 1.15 = 0.44 /connection (4-inch) 0.32 × 1.15 = 0.37 /connection Supports ... carried out in one stage. Hydro pump connection at discharge header end. Vent at top of vessel. Pumps have drain points. 271 Figure 28.9 Project Planning and Control 9 Resource restr...
Ngày tải lên : 26/01/2014, 11:20