MASTER method statement

Construction method statement of bored pile

Construction method statement of bored pile
... Consultant - Bored pile construction sequence, operation area of drilling machine team, equipment movement chart conforms to construction schedule of each bored pile - Preparation of manpower ... depth of boring hole, diameter of bored pile, 3.2 Setting out bored pile Center point of every bored pile is set out exactly by total station base on coodination of the designed location After ... power Page of Remark Including tanks 1m x 2pcs 2m x pcs 3m x 12 pcs 6m x pcs Detailed method statement : 3.1 Preparation work: Preparation works are including: - Shop drawing of bored piles is...
  • 8
  • 886
  • 33

GUIDELINES FOR WRITING WORK METHOD STATEMENTS IN PLAIN ENGLISH pdf

GUIDELINES FOR WRITING WORK METHOD STATEMENTS IN PLAIN ENGLISH pdf
... Experience: Work Method Statement (Part 2) Part B: Points to remember when writing work method statements in plain English: Plain English is getting a clear message across to your audience in an appropriate ... Contents Page Introduction Part A Suggested proforma Proforma for work method statements Part B Points to remember when writing work method statements in plain English Seven ways to write effectively ... Checklist - writing effective work method statements 20 Introduction Why we need work method statements? The purpose of a work method statement is: • to outline a safe method of work for a specific...
  • 24
  • 120
  • 1

METHOD STATEMENT FOR 800MM BORED PILE CONSTRUCTION wadrillco original MS

METHOD STATEMENT FOR 800MM BORED PILE CONSTRUCTION wadrillco original MS
... in Table 1, before it is used in the pile shafts Method Statement for Bore Pile works Project : PHU MY BRIDGE PHU CUONG Co., Ltd Table 1: (in compliance with ASSHTO specification construction ... undertaken should the necessity arise. (for wet hole) Method Statement for Bore Pile works Project : PHU MY BRIDGE PHU CUONG Co., Ltd Boring will stop when the agreed pile toe level is reach The base ... borehole to a storage tank for either reuse or recycle Method Statement for Bore Pile works Project : PHU MY BRIDGE PHU CUONG Co., Ltd POSSIBLE INCIDENTS DURING CONSTRUCTION AND REMEDIAL ACTIONS...
  • 15
  • 700
  • 0

Quy trình thi công tổng hợp method statement

Quy trình thi công tổng hợp   method statement
... as well This kind of hoist has maximum carrying load of 1000 kg equivalent to 12 persons per trip with the height of building is 138.74m so hoist must be required to meet this condition This is ... transmission floor (1 st floor): This is a special block of beam and slab structure having big cross-section of beam (H*B=2500*2400) and slab thickness is 1000 This type of structure is quite ... ceiling → beam → wall, this sequence is forced to avoid other work damaged At locations have thickness is >= 2cm should be divided into layer, each layer is ...
  • 17
  • 109
  • 0

METHOD STATEMENT FOR PRESSURE TEST ( MONG DUONG 1)

METHOD STATEMENT FOR PRESSURE TEST ( MONG DUONG 1)
... MD1-0-T-054-05-00195 METHOD STATEMENT FOR PRESSURE TEST Rev A Page of 17 Mong Duong1 Thermal Power Plant Project METHOD STATEMENT FOR PRESSURE TEST REV DATE DESCIPRITON BY CHECKED APPROVED A Dec 17, 2012 ISSUE FOR ... inspection for fit-up Re-welding YES Preheating (If required) Welding NO NDE (If required) Post Weld Heat Treatment (If required) Pressure Test NO Page of 17 METHOD STATEMENT FOR PRESSURE TEST Doc ... the pressure reaches the testing pressure (1 .5 times operating pressure) , stop the pump Hold for 10minutes without any pressure drop Then release the pressure to operating pressure and hold for...
  • 21
  • 158
  • 0

METHOD STATEMENT FOR STORAGE TANKS

METHOD STATEMENT FOR STORAGE TANKS
... plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS WITH ROOF Rev-0 Page 1500 MTPD Phosphoric Acid plant 4500 MTPD Sulphuric Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS ... bottom plate METHOD STATEMENT FOR STORAGE TANKS WITH ROOF Rev-0 Page 13 1500 MTPD Phosphoric Acid plant 4500 MTPD Sulphuric Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS WITH ROOF ... MTPD Sulphuric Acid plant METHOD STATEMENT METHOD STATEMENT FOR STORAGE TANKS WITH ROOF Rev-0 Page 11 1500 MTPD Phosphoric Acid plant 4500 MTPD Sulphuric Acid plant METHOD STATEMENT Isometric view...
  • 27
  • 24
  • 0

Method Statement of Brickwork

Method Statement of Brickwork
... will no longer be discussed in this method statement Most of brickwork are for walls of Utilities Building and will be applied from the ground to 1st floor of building All walls will close the ... for testing Determination of pH of water Determination of organic contaminants in water Determination of total dissolved salt content in water Method for determination of concrete strength Assembled ... openings Baseline offset of center lines of structures Misalignment and angle deviation between planes of brick blocks with vertical true plane - Each story of building - Full height of building Lateral...
  • 31
  • 87
  • 0

Method Statement of Foundation

Method Statement of Foundation
... DIRECTION OF WORK The work sequence of construction the RC footings is shown at the following flow chart Excavation foundation Lean concrete Pile head treatment Formwork fabrication Installation of ... volume of concrete of footings and stump columns occupied in excavation The volume of excavated soil, volume occupied with concrete and remaining stock soils are shown in table below: VOLUME OF EXCAVATED ... D49 STEEL LADDER 590 700 1110 Refer to bottom level of foundation DRAINAGE HOLE 1110 2000 590 TYPICAL ELEVATION OF FORM WORK INSTALLATION FOR FOUNDATION Wooden plate thk 18mm Steel box 50x50mm...
  • 26
  • 65
  • 0

Method Statement of Painting work

Method Statement of Painting work
... representative of the materials used in the permanent works for AEP paint system (Interior and Exterior): • • • • bags of putty of 20kg /bag cans of sealer of litres /can cans of AEP paint of litres ... No.1/MS -Painting work Page layer layer layers layers CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects & Construction Service Corporation FLOW CHART AND DIRECTION OF WORK The work sequences of Painting ... SCHEDULE Construction Schedule of painting work is attached in Appendix-2 SPECIFIC STANDARD Painting works should be carried out in accordance with the requirements of: - SMC MANUFACTURING (VIET...
  • 22
  • 74
  • 0

Method Statement of RC columns

Method Statement of RC columns
... concrete at desired levels With the columns of Ground floor, the concrete of columns will be finished at the bottom levels of slab beams With the columns of st floor, the casting concrete will ... to 5.81 m (from st floor GFL+7.250 to the bottom of rafter) Hereafter is the list of columns from 1st floor to the roof: SMC-Factory No.1/MS -RC Columns No Column CA1 CA2 CA3 CA4 CA5 CA6 CA7 Dimension ... construction of column will be start from stump columns or ground beams (with Ground Floor Columns) and from 1st floor to the roof Column construction will resume at least one day after casting of concrete...
  • 26
  • 77
  • 0

Method Statement of Slab on grade

Method Statement of Slab on grade
... Corporation CONSTRUCTION METHOD 9.1 Casting schedule: The casting concrete of Slab On Grade will be divided into two zones: Zone Zone Zone - Zone 1: This zone enclosed by the perimeter ground beams of ... No.1/MS -Slab On Grade Page 11 CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects & Construction Service Corporation FLOW CHART AND DIRECTION OF WORK The work sequence of construction the Slab on grade ... Casting the Slab Isolation Slab (1st cast) Slab on grade (2nd cast )Slab (1st cast) SMC-Factory No.1/MS -Slab On Grade Page 14 CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects & Construction Service...
  • 28
  • 75
  • 0

Method Statement of RC suspended slab

Method Statement of RC suspended slab
... AND DIRECTION OF WORK SMC-Factory No.1/MS -RC 1FL slab Page 11 SIZE (MM) 300 x700 400 x 1100 NOTE RC RC 300 x 1100 140 140 140 140 140 RC RC –S.P.S RC –S.P.S RC –S.P.S RC –S.P.S RC –S.P.S CÔNG ... and method of work for carrying out the construction works for RC slab of building factory No.1 This method statement will be applied for first floor (level +7.250m) Construction work of this slab ... No.1/MS -RC 1FL slab Position Page CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects & Construction Service Corporation Contents SMC-Factory No.1/MS -RC 1FL slab Page CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects...
  • 27
  • 79
  • 0

Method statement of Tiling work

Method statement of Tiling work
... Schedule of tiling work on Ground Floor Toilets as below: Work Wall tiling Floor tiling Start 01/3/2016 07/3/2016 Duration days days Finish 06/3/2016 11/3/2016 Construction Schedule of tiling work ... INTRODUCTION 1.1 PURPOSE This method statement describes the methodology for tiling of wall and floor at SMC project Tiling work will be carried out after all constructions of relevant structures such ... SCOPE OF WORKS: All tiling work of Factory No.1 designated for the Toilets (8 rooms) on Ground floor and st floor The tiling in Office area will be carried out by other Sub-Contractors This work...
  • 19
  • 97
  • 0

Method statement of Underground Water Tank

Method statement of Underground Water Tank
... Tiling work (Wall & Floor) Sub-building included: a Underground water tank, trench line, cooling water tank SC-MS- Sub-building 1 /Underground Water Tanks, Page CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects ... which subbuilding (including underground water tank, trench line and cooling water tank) by mentioning typical structures such as bottom slab, wall and top slab of tank 1.2 DEFINITIONS: PROJECT ... the stake on ground Step 6: Fill any gap of formwork with lean concrete with mortar ELEVATION OF WASTE WATER TANK SC-MS- Sub-building 1 /Underground Water Tanks, Page 15 CÔNG TY CỔ PHẦN XÂY LẮP...
  • 25
  • 71
  • 0

Xem thêm

Nạp tiền Tải lên
Đăng ký
Đăng nhập