Calculation beam formwork

LRFD pre-stressed beam.mcd

LRFD pre-stressed beam.mcd
... 96 of 71 LRFD pre-stressed beam.mcd 7/1/2003 of 71 Section Diagram Section 70 60 50 beamxa , 40 xhxhn , xexhn , 30 20 10 40 20 20 40 beamxa , , xhxhn , , xexhn , 60 80 LRFD pre-stressed beam.mcd ... Deflection w_defl := DLnc + railwt ⋅ npar + median⋅ nmed beams + dwt LRFD pre-stressed beam.mcd 7/1/2003 Effective flange width (LRFD 4.6.2.6.1) (use the smaller of interior or exterior) Interior ... Inc h − yb Sb = 10543.065 St = 8907.755   2 ts LRFD pre-stressed beam.mcd 7/1/2003 11 of 71 Live Load Distribution Factors lanes := floor  LRFD 3.6.1.1.1 - Number of design lanes  roadway...
  • 71
  • 227
  • 1

Calculation of material balance for catalytic reforming of naphtha fractions

Calculation of material balance for catalytic reforming of naphtha fractions
... In order to account for the influence of various catalysts on the reforming of naphtha cuts, numerical values of these rate constants must be known After integrating and transforming Eqs (5)-(8), ... Figs - Also shown for comparison are the analogous relationships for the process of reforming over an aluminosilicate catalyst of one of the earlier modifications 16 An analysis of Eqs (1) and (9), ... used to calculate the rate constants of reforming reactions in reactors with either a fixed or moving bed of catalyst Examples of numerical calculations of these constants are given in Table...
  • 4
  • 169
  • 3

Beam data

Beam data
... LRFD pre-stressed beam. mcd 7/1/2003 of 71 Section Diagram Section 70 60 50 beamxa , 40 xhxhn , xexhn , 30 20 10 40 20 20 40 beamxa , , xhxhn , , xexhn , 60 80 LRFD pre-stressed beam. mcd 7/1/2003 ... = Inc = 260730 Width of top flange (in) = fwt = 20 Beam weight (k/ft) = bwt = 0.822 LRFD pre-stressed beam. mcd 7/1/2003 of 71 Strand pattern Data strand := PICK TYPE 10 Description english 6/10-270k ... surface (ksf) = wear := 0.025 Number of beams = beams := Width of one lane (ft) = lane_width := 10 Multiple presence factor = RF := 1.0 Top slab to top beam (in) = tstw := 12.75 Haunch Selection...
  • 15
  • 44
  • 0

LRFD pre-stressed beam.mcd_04

LRFD pre-stressed beam.mcd_04
... 0.474 disp = 0.1 Db n1 1.5 0.9 0.474 0.523 0 10 0 0.5 range1 n1 LRFD pre-stressed beam.mcd 7/1/2003 Shear Design, pre-stress method LRFD 5.8.2.4 Except for slabs footings and culverts, transverse ... α = angle of inclination of transverse reinforcement to longitudinal axis 58 of 71 LRFD pre-stressed beam.mcd LRFD5 .8.3.4.2: 7/1/2003 59 of 71 Use for the calculation of β and θ Mu dv εt = εx ... "OK" "OK" "OK" 15 0.2 0.31 0.44 15 0.004 0.006 0.008 15 "OK" "OK" "OK" = LRFD pre-stressed beam.mcd 7/1/2003 67 of 71 LRFD 5.10.10.1 Factored Bursting Resistance The bursting resistance of pretenioned...
  • 17
  • 44
  • 0

Multi area generation system reliability calculation

Multi area generation system reliability calculation
... example Area MW Tie Capacity States 1-2 1-4 t-3 2-4 3-4 150 100 100 100 0 100 TABLE IV LOLP OF SYSTEM AND INDIVIDUAL AREAS FOR THE 4 -AREA BRIDGE-CONNECTED SYSTEM LArea or S stem T Original System ... affect on the system and area reliability calculations, particularly in multi area analysis Procedures are available for representation of the degree of load correlation in two area models and ... failure condition and/or Area is inwould cccur i f ( i ) marginofArea creased, this increase w i l l not help Area as a l l paths leadingfran Areas and t o Area are already fully Area is reduced, this...
  • 10
  • 137
  • 0

Tài liệu Calculation methodology for the national Footprint accounts, 2008 EditIon docx

Tài liệu Calculation methodology for the national Footprint accounts, 2008 EditIon docx
... Kitzes 2008 Calculation Methodology for the National Footprint Accounts, 2008 Edition Oakland: Global Footprint Network The designations employed and the presentation of materials in the Calculation ... the fundamental principles and calculations utilized in the 2008 edition of the National Footprint Accounts To learn more about the structure and results of the 2008 edition of the National Footprint ... utilized in the 2008 edition of the National Footprint Accounts It provides researchers and practitioners with information that will deepen their understanding of the calculation methodology for the...
  • 19
  • 285
  • 0

Tài liệu Calculation sheet - Station Grounding Grid pdf

Tài liệu Calculation sheet - Station Grounding Grid pdf
... Calculation sheet 1.0 Station Grounding Grid GENERAL This calculation is prepared to design the station earthing with IEEE Standard 80 to achieve ... Puerto Chile Oct 2006 2.2 ANSI/IEEE Std 8 0-1 986, IEEE Guide for Safety in AC Substation Grounding 2.3 IEEE 66 5-8 7 Guide for Generating Station Grounding 3.0 CALCULATION 3.1 General The worst fault ... Depth of ground grid conductors in m: h = 0.5 m 3.1.5 Ground connection method : Thermal welding type 3.2 Conductor Size Calculation Calculation sheet Amm2 Station Grounding Grid t cα r ρ r ⋅...
  • 7
  • 175
  • 0

Tài liệu Báo cáo " Study on Monte-Carlo calculation of peak efficiencies of the superpure Hp Ge detector (Gmx) in environmental gamma spectrometry with using MCNP4C2 " pptx

Tài liệu Báo cáo
... hyperpure HP Ge detector (GMX) based on MCNP4C2 we need to provide an input file containing the information involved to the cross-section library and the description of the physical geometry of the source, ... the source -detector- geometry Application MCNP4C2 for calculation of peak efficiencies of detector (GMX) the hyperpure HP Ge The hyperpure HP Ge detector (GMX) used by us here in simulation and experimental ... electrons in germanium crystal and the field distortions near the edges of the detector are not properly done The modeling of peak efficiencies of the detector has also been considered by us for gamma...
  • 6
  • 161
  • 0

Manual Ecodial Advance Calculation pdf

Manual Ecodial Advance Calculation pdf
... Ecodial proposes solutions without taking the option into account In the results zone, Ecodial indicates whether the option exists for each device Technical help Page 15/44 Ecodial Advanced Calculations ... 26/44 Ecodial Advanced Calculations 4.2 Manual and alternate solutions The Select another product command provides access to two separate functions: selection of alternate solutions validated by Ecodial ... the calculation is stopped and an error message is issued To clear the problem, it is necessary to unlock the solution and restart the calculation Technical help Page 27/44 Ecodial Advanced Calculations...
  • 44
  • 983
  • 2

Báo cáo " Long-term sediment distribution calculation taking into account sea level rise and the development of Day estuary " potx

Báo cáo
... selected for calculation and development of sea level rise scenarios for Vietnam including low emission scenario (B10, medium (B2) and the highest (A1F1) In this study, sea level rise for Day estuary ... shows the increasing trend of water level (red line) Magnitude of the increase is consistent with the increase projected in the sea level rise scenarios in section 5.4 Calculation of sediment distribution ... and by 4258cm at the end of the century To the scenario B2, the sea level could rise by 20-24cm and by 49-65cm, respectively Under high emissions scenario A1FI, sea level could rise by 22-27 cm...
  • 6
  • 209
  • 0

Hand Calculation Method for Orifice Design

Hand Calculation Method for Orifice Design
... or pipe for square-edge Flange or corner only for ASME small-bore Flange for quadrant-edge PIPE INSIDE DIAMETER Use decimal places ORIFICE DIAMETER Entered for orifice re-ranging calculation ... 1/3 FS: For liquid use BPD, BPH, GPM, or GPH For vapor use lbs/hour; for gas use SCFH For quadrant-edge, equal to 333 × (full-scale flow rate) Fill in the ORIFICE DATA input blocks TYPE OF ORIFICE ... Entered for orifice sizing calculation FULL SCALE DP Use decimal places Standard value = 100 inches of water Fill in the CORRECTIONS FACTORS Fa Correction for thermal expansion of orifice meter...
  • 16
  • 211
  • 0

clecture electron beam welding

clecture electron beam welding
... operation is possible - travel speeds are high - beam access is good - heat input is low Electron Beam Welding Features of the electron beam welding process The main limitations of the process ... 1950's the use of electron beams for welding was made a commercial reality and the process was developed over the following decade into a very useful joining process Electron Beam Welding Modes of ... vacuum Electron Beam Welding Equipment The EBW system consists of: - an electron gun and beam delivery system - a power source - vacuum chamber and pumping equipment - work handling equipment Electron...
  • 6
  • 49
  • 0

cost accounting and product's price calculation for ba ding printing company - ministry of public security

cost accounting and product's price calculation for ba ding printing company - ministry of public security
... at: http://www.baomoi.com/Cong-ty-In -Ba- Dinh-Vung-buoc-trong-co-che-thitruong/47/5275003.epi 13 - V Rajasekaran, R Lalitha, Cost Accounting 14 - Kenneth H York, John A Bauman, Cases and materials ... merger of two companies: XZ72 printing company and Ministry of Public Security printing firm The event was marked the creation of Ba Dinh Printing Company English Name: Ba Dinh Printing Company ... costs are indirect costs.(16) 29 4.4 – Cost accounting and product price calculation in Ba Dinh Printing Company: 4.4.1 – Cost accounting for direct materials: The company defined two types of...
  • 49
  • 137
  • 0

Báo cáo " Calculation of Lindemann’s melting Temperature and Eutectic Point of bcc Binary Alloys " pot

Báo cáo
... present Melting temperature of Fe, Ref Melting temperature of V, Ref Eutectic point, present Melting curve, present Melting temperature of Cr, Ref Melting temperature of Cs, Ref Eutectic point, present ... points of bcc binary alloys This melting curve provides information on Lindemann’s melting temperatures of binary alloys with respect to any proportion of constituent elements and on the eutectic points ... Ref 305 300 295 2700 Melting curve, present Melting temperature of Cr, Ref Melting temperature of Mo, Ref Eutectic point, present Melting temperature, Expt., Ref Eutectic point, Expt., Ref Cr1-xMox...
  • 8
  • 126
  • 0

Xem thêm

Từ khóa: Master Thesis: The Accounting Quality of IFRS-adopting Private FirmsPower Relationships Within A Corporate Finance Department: A Foucauldian Approach To Corporate Hierarchies And ResistanceGoodwill Impairment Charges Under Sfas 142: Role Of Executives’ Incentives And Corporate GovernanceHoa như quỳnhCurriculum Vitae Iris Angelika JunglasThe value relevance of accounting information in the NetherlandsManagement accounting and organizational change : impact of alignment of management accounting system, structure and strateg y on performanceA thesis submitted to the Miami University Honors Program in partial fulfillment of the requirements for University Honors.Otto Nyberg The Effect Of Non-Audit Fees On Audit QualityThe Certified Management Accountant ProgramThesis Howto-Guide Part 1for yourMasterthesis at the SRH Hochschule HeidelbergTrait Mindfulness as a Mediator of Resilience Depressive SymptomTổng hợp các phương pháp giải toán trên máy tính casioChiến lược cạnh tranh của vinamilkĐỀ TÀI : QUAN HỆ GIỮA MARKETING VÀ BÁN HÀNG CỦA CÔNG TY HONDATiêu chuẩn Châu Âu EC3: Kết cấu thép phần 5: Cừ thép (Eurocode3 BS EN1993 5 e 2007 Design of steel structures part 5: Piling)ĐỀ CƯƠNG CHI TIẾT TRIẾT học sđh 2014 moiMối liên hệ giữa lý luận và thực tiễn và vận dụng phân tích mối liên hệ giữa đổi mới tư duy với đổi mới kinh tế ở nước ta luận văn, đồ án, đề tài tốt nghiệpDE SU DIA LOP 5 CUOI NAM 14 15KỸ THUẬT đồ họa
Nạp tiền Tải lên
Đăng ký
Đăng nhập