41129 general revision

Recommendation for Key Management – Part 1: General (Revision 3) pot

Recommendation for Key Management – Part 1: General (Revision 3) pot
... cryptographic key; cryptographic module; digital signature; hash function; key agreement; key management; key management policy; key recovery; key transport; originator-usage period; private key; public key; ... intended for each other [SP800-56A] provides for unilateral key confirmation for schemes where one party has a static key- establishment key, and bilateral key confirmation for schemes where both parties ... associated public key using a public -key algorithm Key- transport keys are usually used to establish keys (e.g., key- wrapping keys, data encryption keys or MAC keys) and, optionally, other keying material...
  • 147
  • 49
  • 0

Tài liệu Embedded NGX 7.5 Release Notes General Availability Version March 2008 – Document Revision pdf

Tài liệu Embedded NGX 7.5 Release Notes General Availability Version March 2008 – Document Revision pdf
... This Version Supported Platforms Availability Copyright CHANGES FROM 7.5 TO 7.5. 55 7.5. 55 7.5. 51 7.5. 48 ... SecureBlade 300 • Nokia IP60 Availability Embedded NGX 7.5 is available to existing Embedded NGX customers with a valid software subscription contract For additional information and documentation, click ... Support Embedded NGX 7.5 ADSL appliances now support the IPoA (IP over ATM) connectivity protocol, used by certain ADSL service providers Bridged / Unnumbered PPPoA Support Embedded NGX 7.5 ADSL...
  • 21
  • 88
  • 0

2005 AASHTO BRIDGE COMMITTEE AGENDA ITEM: 40 (REVISION 2)

2005 AASHTO BRIDGE COMMITTEE AGENDA ITEM: 40 (REVISION 2)
... during February 2005, and the proposed Section 10 was further amended to address the comments received, to produce the final draft agenda item Key changes to Section 10 in the 2004 AASHTO LRFD Design ... not consistent with the approach in current AASHTO Standard Specifications and national practice in general To be consistent with the approach in the AASHTO Standard Specifications regarding pile ... logic used to establish the foundation design resistance factors proposed in this agenda item (see Allen, T M., 2005, Development of Geotechnical Resistance Factors and Downdrag Load Factors for...
  • 7
  • 186
  • 0

Revision of Nominal Effective Exchange Rate (NEER) and Real Effective Exchange Rate (REER) Indices.doc

Revision of Nominal Effective Exchange Rate (NEER) and Real Effective Exchange Rate (REER) Indices.doc
... 50 and 51 of the December issue of RBI Bulletin Table 4: Indices of Real Effective Exchange Rate (REER) and Nominal Effective Exchange Rate (NEER) of the Indian Rupee (36-Currency Export and ... 1993-94 to 2005-06 (so far) Table 3: Indices of Real Effective Exchange Rate (REER) and Nominal Effective Exchange Rate (NEER) of the Indian Rupee (6Currency Trade Based Weights) Year Base:1993-94 ... relative to the currency i and vice versa, where e represents exchange rate of Indian rupee against the numeraire, SDR in indexed form and ei represents exchange rate of foreign currency ‘i’ against...
  • 9
  • 303
  • 3

Xem thêm

Nạp tiền Tải lên
Đăng ký
Đăng nhập