19127 descriptions

Intern Job Descriptions

Intern Job Descriptions
... – training@sunwayhotel.com.vn Sunway Hotel Hanoi is the first international four star hotel in Hanoi owned and managed by Sunway International Hotels & Resorts The 145 room four-star boutique ... Handle any other job assigned by management from time to time - Requirements - Certificate in Hotel Administration, Hotel Management, Languages or relevant - Interest in hotel jobs - Excellent ... – training@sunwayhotel.com.vn Sunway Hotel Hanoi is the first international four star hotel in Hanoi owned and managed by Sunway International Hotels & Resorts The 145 room four-star boutique...
  • 8
  • 202
  • 0

DESCRIPTIONS

DESCRIPTIONS
... The members of our Squad are in the process of _ the pictures of the alleged shooters based on descriptions _ by witnesses Using _ from police criminal records we’ve found no one _6 _...
  • 12
  • 644
  • 2

Show ip bgp neighbors Command Field Descriptions

Show ip bgp neighbors Command Field Descriptions
... round-trip time KRTT New round-trip timeout (using the Karn algorithm); this field separately tracks the round-trip time of packets that have been retransmitted minRTT Smallest recorded round-trip ... in this field gradually increases until it is larger than a fullsized packet, at which point it is applied to the rcvwnd field SRTT A calculated smoothed round-trip timeout RTTO Round-trip timeout ... calculation) maxRTT Largest recorded round-trip timeout Flags Time the local host will delay an acknowledgment in order to piggyback data on it IP Precedence of the BGP packets Datagrams: Rcvd Number of...
  • 3
  • 153
  • 0

Tài liệu Show frame-relay pvc Command Field Descriptions doc

Tài liệu Show frame-relay pvc Command Field Descriptions doc
... CIR for the PVC Byte Increment Number of bytes that will be sustained per internal interval z Frame Relay has BECN adaptation configured Pkts Number of packets associated with this PVC that have ... Bytes Number of bytes associated with this PVC that have gone through the trafficshaping system Pkts Delayed Number of packets associated with this PVC that have been delayed by the traffic-shaping ... Bytes Delayed Number of bytes associated with this PVC that have been delayed by the trafficshaping system Shaping Shaping will be active for all PVCs that are fragmenting data; otherwise, shaping...
  • 2
  • 134
  • 0

Tài liệu show interfaces bri Field Descriptions doc

Tài liệu show interfaces bri Field Descriptions doc
... transmitter has been running faster than the router can handle; this may never be reported on some interfaces Output Errors Collisions Sum of all errors that prevented the final transmission of datagrams...
  • 3
  • 140
  • 0

Tài liệu Debug isdn q921 Field Descriptions pdf

Tài liệu Debug isdn q921 Field Descriptions pdf
... procedures such as TEI assignment, TEI removal, and TEI checking, which are tracked with the debug isdn q921 command, not display the corresponding SAPI value; it is implicit; if the SAPI value ... sent from the ISDN service provider on the network to the local router during the TEI check procedure; this message is sent in a UI command frame; the ri field is always 0; the field for this ... local router to the ISDN service provider on the network during the TEI check procedure; this message is sent in a UI command frame in response to the IDCKRQ message; the ri field is a randomly...
  • 3
  • 69
  • 0

Tài liệu Debug isdn q931 Command Call Setup Procedure Field Descriptions doc

Tài liệu Debug isdn q931 Command Call Setup Procedure Field Descriptions doc
... Indicates that the called user has accepted the call CONNECT CONNECT_ACK DISCONNECT Cause Looking Shift to Codeset Codeset IE 0x1 i = 0x82, `10' RELEASE RELEASE_COMP Indicates that the calling user ... Indicates the cause of the disconnect; for ISDN Switch Types, Codes, and Values", see http://www.cisco.com/univercd/cc/td /doc/ product/software/ios113ed/dbook/ disdn.htm Indicates that the next information ... 0x82, `10' RELEASE RELEASE_COMP Indicates that the calling user acknowledges the called user's acceptance of the call Indicates either that the user side has requested the network to clear an end-to-end...
  • 2
  • 65
  • 0

Tài liệu show ipx interface e0 Command Field Descriptions pptx

Tài liệu show ipx interface e0 Command Field Descriptions pptx
... filter applied to the interface with the ipx input-sap-filter command SAP Output filter list Number of the output SAP filter applied to the interface with the ipx output-sapfilter command SAP Router ... filter applied to the interface with the ipx router-sap-filter command Input filter list Number of the input filter applied to the interface with the ipx input-network-filter command Output filter ... filter applied to the interface with the ipx output-network-filter command Router filter list Number of the router entry filter applied to the interface with the ipx router-filter command Netbios Input...
  • 2
  • 94
  • 0

Tài liệu show ipx traffic Command Field Descriptions pptx

Tài liệu show ipx traffic Command Field Descriptions pptx
... sent Number of GNS requests and replies This field applies to Cisco IOS Release 11.2 and later Number of SAP Nearest Name requests and replies This field applies to Cisco IOS Release 11.2 and ... ignored, replies Number of general SAP requests, sent requests, ignored requests, and replies This field applies to Cisco IOS Release 11.2 and later SAP Get Nearest Server, requests, replies SAP ... watchdog packets the software handled packets received Number of watchdog packets received from IPX servers on the local network replies spoofed Number of times the software responded to a watchdog...
  • 3
  • 111
  • 0

Tài liệu Lab 3.2.3 Configuring Interface Descriptions pptx

Tài liệu Lab 3.2.3 Configuring Interface Descriptions pptx
... assigned lab to be performed 4-5 CCNA 2: Routers and Routing Basics v 3.0 - Lab 3.2.3 Copyright  2003, Cisco Systems, Inc Router Interface Summary Router Ethernet Ethernet Serial Serial Interface ... characters in an interface description? _ Step Choose a description for the interface a An interface description includes the purpose and location of the interface, ... locations connected to the interface, and circuit identifiers Descriptions help the support personnel better understand the scope of problems related to an interface Descriptions also allow for...
  • 5
  • 126
  • 0

Tài liệu Lab 3.2.3 Configuring Interface Descriptions docx

Tài liệu Lab 3.2.3 Configuring Interface Descriptions docx
... assigned lab to be performed 4-5 CCNA 2: Routers and Routing Basics v 3.0 - Lab 3.2.3 Copyright  2003, Cisco Systems, Inc Router Interface Summary Router Ethernet Ethernet Serial Serial Interface ... characters in an interface description? Step Choose a description for the interface a An interface description includes the purpose and location of the interface, ... locations connected to the interface, and circuit identifiers Descriptions help the support personnel better understand the scope of problems related to an interface Descriptions also allow for...
  • 5
  • 148
  • 0

Tài liệu Project Manager Job Descriptions doc

Tài liệu Project Manager Job Descriptions doc
... assigned to Senior Project Manager Provide mentoring, coaching and direction setting to team members and project managers Ensure project team and staff training and development JOB IMPACT Overall ... support, and secure buy-in for desired objectives Projects a credible executive image when strategically Last Updated 3/07 Page of Project Manager Job Descriptions functional relationships to accomplish ... client satisfaction Understanding of higher education – its Last Updated 3/07 Page of Project Manager Job Descriptions Knowledge, Skills & Expertise community and its technology requirements –...
  • 5
  • 143
  • 0

Tài liệu Báo cáo khoa học: "Learning Event Durations from Event Descriptions" docx

Tài liệu Báo cáo khoa học:
... The information in the event s syntactic environment is very important in deciding the durations of events For example, there is a difference in the durations of the “watch” events in the phrases ... be indicative features for learning event durations For example, the quotation mark is a good indication of quoted reporting events, and the duration of such events most likely lasts for seconds ... considered in learning event durations 3.1 Local Context For a given event, the local context features include a window of n tokens to its left and n tokens to its right, as well as the event itself,...
  • 8
  • 179
  • 0

Xem thêm

Từ khóa: Sự thay đổi thị hiếu âm nhạc của sinh viên trường Đại học Văn hóa Hà Nội hiện nayTHỰC TRẠNG HOẠT ĐỘNG CỦA CÔNG TY CỔ PHẦN TRUYỀN THÔNG ĐA PHƯƠNG TIỆN THỦ ĐÔMôn Lịch sử Việt Nam: Đóng góp của Vương triều Lý đối với lịch sử dân tộcNga – thị trường tiềm năng du lịch Việt NamĐiều tra, nghiên cứu thành phần loài côn trùng, đặc điểm hình thái, sinh học sinh thái của loài bọ rùa đỏ (Micraspis discolor) trên cây lạc vụ hè thu năm 20152016, tại ruộng chuyên canh mầu thuộc Đông Anh, Hà Nội (LV tốt nghiệp)60 đề bồi dưỡng học sinh giỏi toán 6 có đáp ánNghiên cứu một số đặc điểm hình thái và thể lực của học sinh trường THPT Trung Giã Sóc Sơn Hà Nội (LV tốt nghiệp)Điều tra nhận thức về giới tính và sức khỏe sinh sản của học sinh tại trường THPT Liên Hà Đông Anh Hà Nội và THPT Thái Ninh Thái Thụy Thái Bình (LV tốt nghiệp)Nghiên cứu đặc điểm hình thái thể lực trẻ em lứa tuổi từ 3 5 tuổi tại trường mầm non Yên Mỹ, xã Yên Mỹ, huyện Yên Mô, tỉnh Ninh Bình (LV tốt nghiệp)Quản lý thu ngân sách nhà nước qua kho bạc nhà nước hà nộiThực trạng giải pháp kinh doanh thanh toán thẻ tại ngân hàng thương mại cổ phần Sài Gòn Thương Tín Chi nhánh 8 tháng 3 Thành phố Hồ Chí MinhThực trạng hạch toán chi phí sản xuất và tính giá thành sản phẩm tại Nhà xuất bản Thống kêThực trạng hoạt động đầu tư nâng cao khả năng cạnh tranh của Công ty Cao su Sao vàngThực trạng kế toán chi phí sản xuất và tính giá thành sản phẩm xây lắp tại công ty công trình đường sắtThực trạng kế toán nguyên vật liệu tại công ty cổ phần công nghệ lehutĐề thi Tiếng Anh 7 HK2Sáng kiến kinh nghiệm Xây dựng bài tập rèn kỹ năng đọc cho học sinh lớp 2 theo hướng tích cực hóa hoạt động học tậpSơ đồ hướng dẫn phân tích khổ 1 bài thơ Tây TiếnTuyển tập những bài văn tham khảoThực trạng công tác kiểm toán doanh thu và nợ phải thu khách hàng trong kiểm toán báo cáo tài chính do Công ty TNHH Kiểm Toán Đại Tín thực hiện
Nạp tiền Tải lên
Đăng ký
Đăng nhập