... flood control and dyke management activities. Theory methods: The documents (technical books and papers, technical standards, ) in Vietnamese and foreign languages were reviewed and applied ... landside Filling the pond to +0,8 (m), lower than the downstream berm. Results from analytical methods larger than FEM methods, below: Water level river side Water level land side Analytical ... advanced techniques to stabilize the permeability to fit the specific conditions of Ha Nam Province. This problem is very important and necessary for the management dykes of Ha Nam Province and...