... Vol. 72 , April 1985, pp. 172 – 177 .
Lakshminarasimha, A. N., Boyce, M. P., and Meher-Homji, C. B., 1992, “Modelling and Analysis of Gas
Turbine Performance Deterioration,” ASME Paper No. 92-GT -39 5.
Mezheritsky, ... only a few hours per year.
Washing equipment and procedure
System engineering and equipment.
The following two basic principles have been
determined for the engineering...
... C -35 0, C -36 8 to C - 37 4
power limitation in, C -33 3, C -35 0 to C -35 4
pressure control in, C -33 3, C -36 8 to C - 37 4,
C -38 3 to C -38 8
process control in, C -33 3 to C -33 4
proportional conversion of electrical ...
C-405
switches for, C - 37 7 to E-18
temperature limitation in, C -33 3, C - 37 7 to
C -38 2
torque control, C -34 4 to C -34 5
turbocompressors, C -33 1 to C...
... vaporizer/superheater, steam heated. Unit size 132 in
(33 53 mm) in diameter by 42 ft ( 13 cm) long. Duty to boil and superheat very low-temperature
organic liquid. (Source: Armstrong Engineering Associates.)
FIG. ...
1
/
8
in (3 mm). Order number 630 -0418.
1 each
3
/
4
in (19 mm) solid probe. Order number 630 -0208.
DUAL TEST SYSTEM—processes 2 samples simultaneously*
1 each Model...
... feed applications in power plants.
See Figs. P -33 3 and P -33 4.
General specifications
Capacities to 15,000 gpm (34 00 m
3
/h)
Heads to suit
Speeds to 72 00 rpm
Temperatures to 800°F (425°C)
Pressure ... deep Q to 150,500 gpm (34 ,065 m
3
/h)
well, municipal water supply mine H to 35 00 ft (1 070 m)
dewatering, cooling water, seawater and T to 70 0°F ( 37 1°C)
river water intake, pro...