Tài liệu CFSAN Adverse Event Reporting System Voluntary and Mandatory Reports on 5-Hour Energy, Monster Energy, and Rockstar Energy Drink pptx

Tài liệu CFSAN Adverse Event Reporting System Voluntary and Mandatory Reports on 5-Hour Energy, Monster Energy, and Rockstar Energy Drink pptx

Tài liệu CFSAN Adverse Event Reporting System Voluntary and Mandatory Reports on 5-Hour Energy, Monster Energy, and Rockstar Energy Drink pptx

... Center for Food Safety and Applied Nutrition CFSAN Adverse Event Reporting System Voluntary and Mandatory Reports on 5-Hour Energy, Monster Energy, and Rockstar Energy Drink January 1, 2004, ... cosmetics and conventional foods, and both voluntary and mandatory reports for dietary supplements. Mandatory reports are those required by...
Ngày tải lên : 19/02/2014, 18:20
  • 18
  • 459
  • 0
Surveillance for Safety After Immunization: Vaccine Adverse Event Reporting System (VAERS) — United States, 1991–2001 pptx

Surveillance for Safety After Immunization: Vaccine Adverse Event Reporting System (VAERS) — United States, 1991–2001 pptx

... Control and PreventionCenters for Disease Control and Prevention Centers for Disease Control and PreventionCenters for Disease Control and Prevention Centers for Disease Control and Prevention SAFER ... 7. Frequently reported adverse events* in the Vaccine Adverse Event Reporting System (VAERS) — United States, 1991–2001 Adverse event No. (%) Adverse event No. (%)...
Ngày tải lên : 16/03/2014, 19:20
  • 28
  • 514
  • 0
Guidance for Industry - How to Complete the Vaccine Adverse Event Reporting System Form (VAERS-1) potx

Guidance for Industry - How to Complete the Vaccine Adverse Event Reporting System Form (VAERS-1) potx

... before event. 11: Adverse event onset - Provide date and time of onset of event symptoms following vaccination. If more than one adverse event occurred, provide information for the most serious event. ° ... as a result of the adverse event. Hospitalization (initial or prolonged) - Check if the adverse event resulted in admission to the hospital or prolongation of hospi...
Ngày tải lên : 23/03/2014, 13:20
  • 19
  • 465
  • 0
Tài liệu The Early Detection Research Network: Investing in Translational Research on Biomarkers of Early Cancer and Cancer Risk docx

Tài liệu The Early Detection Research Network: Investing in Translational Research on Biomarkers of Early Cancer and Cancer Risk docx

... Disease Control and Prevention, FDA, the Pacific Northwest National Laboratories of the Department of Energy and the National Aeronautics and Space Administration (NASA) Jet Propulsion Laboratory ... work. Conferences and Workshops As an organization based on a nationwide network of collaboration, EDRN emphasizes participation in Network-sponsored activities, including wor...
Ngày tải lên : 14/02/2014, 21:20
  • 124
  • 422
  • 1
Tài liệu Giới thiệu Spring Roo, Phần 5: Viết các add-on bao đóng và nâng cao cho Spring Roo pptx

Tài liệu Giới thiệu Spring Roo, Phần 5: Viết các add-on bao đóng và nâng cao cho Spring Roo pptx

... cho thấy tệp configuration.xml. Liệt kê 19. Tệp configuration.xml <?xml version="1.0" encoding="UTF-8" standalone="no"?> <configuration> <dependencies> ... add -on nâng cao—đó là addon-equals và addon-JSF. add -on addon-equals cung cấp cách thực hiện các phương thức so sánh bằng nhau (equals) và mã băm (hashcode) cho một thực thể,...
Ngày tải lên : 22/02/2014, 15:20
  • 19
  • 365
  • 0
Tài liệu Red Hat Global File System pptx

Tài liệu Red Hat Global File System pptx

... disk and do not expand the file system. -V Displays command version information. -v Turns up the verbosity of messages. Table 4.3. GFS-specific Options Available While Expanding A File System 6. ... added. The gfs_grow command must be run on a mounted file system, but only needs to be run on one node in a cluster. All the other nodes sense that the expansion has occurred and auto...
Ngày tải lên : 10/12/2013, 06:15
  • 55
  • 562
  • 2
Tài liệu Lecture 25: The Telephone System doc

Tài liệu Lecture 25: The Telephone System doc

... Introduction to Telecommunications, Winter 2000 Lecture-25 Telephone System The Telephone System: (Ref: Ch-4, Page-113 of your Text book) The telephone system remains as the backbone of low-cost ... presentation of a dial tone on the circuit. Ring: When the phone is ringing, a 20 Hz 85-volt RMS voltage is present on the line. Standard Rotary Telephone Handset (Type 50...
Ngày tải lên : 10/12/2013, 08:15
  • 6
  • 441
  • 0
Tài liệu SONEPLEX DS3 REMOTE CONTROL SYSTEM doc

Tài liệu SONEPLEX DS3 REMOTE CONTROL SYSTEM doc

... T1s 2 DS3 D C S C A M (W) C A M (P) C A M (W) C A M (P) C A M (W) C A M (P) A P U TB0S SONET MUX SONET MUX SONET MUX SONET MUX CRAFT 12 DS3 7 ALARM SONET TRANSPORT TL1 Operations Support Systems 31/98 409 Soneplex ® DS3 Remote Control System System Overview The Soneplex ... CB-149 Section B2 • Transaction Language (TL1) Interface - Provides communication status, alarm, provisioning and m...
Ngày tải lên : 10/12/2013, 16:15
  • 6
  • 307
  • 0
Tài liệu LoopStar® 800 SONET Access System docx

Tài liệu LoopStar® 800 SONET Access System docx

... 800 LoopStar ® 800 SONET Access System SONET M13 Multiplexer Applications The LoopStar 800 SONET Access System enables service providers to cost effectively deploy a fiber-based solution to address locations ... services over SONET while providing the reliability and protection expected from traditional SONET networks. In terminal multiplexer applications, the LoopStar 800 can drop the...
Ngày tải lên : 10/12/2013, 20:15
  • 2
  • 284
  • 0
Tài liệu Chapter 4: Drilldown Reporting ppt

Tài liệu Chapter 4: Drilldown Reporting ppt

... high-level authorizations in the creation of reports and forms. It is always best to build production-oriented reports with a logical naming convention, and to restrict update access to a select ... production reports under a different name and make personal changes. < Batch Execution: The use of batch job execution is ideal in several situations. First, the ability to run...
Ngày tải lên : 11/12/2013, 14:15
  • 34
  • 405
  • 0

Xem thêm

Từ khóa: